i e'C Commonu ca'th I.dison Company IAalle Generating Station 2N11 North list Ibiad mrsedles. 11.61311-9757 let 814357W'o1 4
i l
l July 23,1997 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
Subject:
Accident Sequence Precursor Analysis LaSalle County Station, Units 1 and 2 Facility Operating License NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 i
Reference:
NRC Letter to I. Johnson from D. Skay, Review of Preliminary j
Accident Sequence Precursor Analysis of Operation Event at LaSalle County Station, Units 1 and 2, dated July 3,1997 Comed has reviewed the subject document. We have no significant comments and endorse your overall methodology and conclusions.
i As noted in your analysis, Comed prepared a "PRA Report of the impact of Foam Sealant injection in the LaSalle County Nuclear Station Service Water Tunnel, j
September 23,1996". We should point out that certain modeling assurnptions and methodologies differ between the Comed results and those shown in the preliminary NRC analysis. The Comed assumptions and methodologies result in a minor reduction in the calculated conditional core damage probability of the event.
If there are any questions or comments concerning this letter, please refer them to Perry Barnes, Regulatory Assurance Supervisor, at (815) 357-6761, extension 2383.
Respectfully,
~
L) w )
W. T. Subalusky Site Vice President llll lllll ll LaSalle County Station I
cc:
A. B. Beach, NRC Region Ill Administrator s
M. P. Huber, NRC Senior Resident inspector - LaSalle
,D D. M. Skay, Project Manager - NRR - LaSalle F. Niziolek Office of Nuclear Facility Safety - IDNS