Notice of Receipt & Availability for Comment of post-shutdown Decommissioning Activities Rept for Millstone Nuclear Power Station,Unit 1.Comments Should Be Submitted within 30 Days of Notice Date
ML20196J150
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/29/1999
From: Larry Wheeler
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20196J117 List:
References
NUDOCS 9907070173
Download: ML20196J150 (2)


Text

f... -

i 7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION NORTHJAST NUCLEAR ENERGY COMPANY. ET AL.

MILLSTONE NUCLEAR POWER STATION. UNIT 1 DOCKET NO, 50-245 NOTICE OF RECEIPT AND AVAILABILITY FOR COMMENT l

OF POST-SHUTDOWN DECOMMISSIONING ACTIVITIES REPORT The U.S. Nuclear Regulatory Commission (the Commission) is in receipt of and is making available for public comment, the Post-Shutdown Decommissioning Activities Report (PSDAR) for the Millstone Nuclear Power Station, Unit 1 (Millstone Unit 1), located in Waterford, Connecticut.

Millstone Unit 1 has been shut down since November 4,1995, and the reactor has been defueled since November 19,1995. By letter dated July 21,1998, Northeast Nuclear Energy Company (the licensee) certified to the Commission that power operations at Millstone Unit 1 had been permanently ceased and fuel had been permanently removed from the reactor vessel. By letter dated June 14,1999, the licensee submitted its PSDAR to the Commission in accordance with the requirements of Title 10 of the Code of Federal Reaulations, Section 50.82.

In the PSDAR, the licensee has identified the planned decommissioning activities and schedule for the Millstone Unit 1 facility, provided an estimate of expected costs, and discussed the reasons for concluding that the environmental impacts associated with site-specific decommissioning activities are bounded by the appropriate previously issued environmental

. impact statements. The licensee has chosen to decontaminate and dismantle selected portions of the facility and leave other portions in a safe storage status until decommissioning programs are developed for Unit 2 and Unit 3. The licensee stated, however, that it is conceivable that l

9907070173 990629 PDR ADOCK 05000245 p_ PDR t

e

7 a.l " .-; ,,

' i .h upon further evaluation,'it may be ' preferable to decontaminate and dismantle Unit 1 without '

' placing portions of the facility in safe storage. The licensee is also evaluating the feasibility of constructing an independent spent fuel storage facility on site until the fuel can be permanently .

L l transferred offsite to a Department of Energy facility. i The PSDAR is available for public inspection at the Commission's public document room located at The Gelman Building, 2120 L Street, NW., Washington, DC, and at the local public document room located at the Learning Resources Center, Three Rivers Community-Technical l

College, 574 New London Turnpike, Norwich, Connecticut, and at the Waterford Library, ATTN:

- Vince Juliano,49 Rope Ferry Road, Waterford, Connecticut. The NRC has also placed the PSDAR on the Internet at irc. gov /OPA/ reports /ms1061499.htm (cover letter) and

gov /OPA/ reports /' ~ 1499a.htm (attached report).

The Commission will schedule a public meeting in the vicinity of the Millstone Unit 1 facility to solicit public comments on the Millstone Unit 1 PSDAR. A notice will be placed in the FEDERAL REGISTER and in the local media announcing the date, time, and location of the

]

I public meeting. 1 Comments regarding the Millstone Unit 1 PSDAR should be submitted in writing to Mr. Louis L. Wheeler, Senior Project Manager, Mail Stop 011 D-19, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, within 30 days after the date of this notice.

Dated at Rockville, Maryland, this 29th of June 1999.

FOR THE NUCLEAR REGULATORY COMMISSION aMr y douis L. Wheeler, Senior Project Manager Decommissioning Section Project Directorate IV & Decommissioning Division of Licensing Project Manager

! Office of Nuclear Reactor Regulation J

-