Oto
.
-
.
,
,
D
'
JUN 2 41988
Docket No. 50-295
Docket No. 50-304
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by NRC inspectors
M. M. Holzmer and P. L. Eng of this office from April 14 through June 3,1988,
of activities at the Zion Nuclear Generating Station, authorized by Licenses
No. DPR-39 and No. DPR-48, and to the discussion of our findings with
Mr. G. Plimi at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as described in the enclosed Notice. With respect to
'
item 1.a. the inspection showed that action had been taken to correct the
identified violation and to prevent recurrence. Our understanding of your
corrective actions are described in Paragraph 4 of the enclosed inspection
i
report. Consequently, no reply to the violation is required and we have
no further questions regarding this matter at this time.
Regarding the remaining items, a written response is required.
This report identifies several findings regarding procedural adherence during
surveillance testing activities, failures to test engineered safeguards logic
in accordance with Technical Specifications, test procedure inadequacies and
test documentation deficiencies. Similar findings in the area of surveillance
testing were identified at Zion in previous inspections during the past year.
We are particularly concerned that the number, type, and repetitive nature of
these findings indicates significant weaknesses in your test programs and poor
application of quality program principles.
Please include in your response to
the enclosed Notice of Violation an expanded discussion of the corrective
actions planned to assure that test activities, documentation, and test
procedures, including temporary procedure changes, are appropriately completed
and maintained in the future to support equipment operability.
In addition,
please include your plans to ensure that engineered safeguards logic tests
are performec in accordance with Technical Specification requirements.
f
8807060327 880624
\\
{DR
ADOCK 05000295
\\
l
.
-
.
.
'
.-
i
-
.
'
.,
'.
Commonwealth Edison Company
2
JUNI41944
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter,- the enclosures, and your response to this letter will be placed
in the NRC Public Document Room.
'
The responses directed by this letter and the accompanying Notice are not
'
subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
,
'
. . ,
N M BT 5 (1 GREDQGN
Edward G. Greenman, Director
Division of Reactor Projects
Enclosures:
1.
2.
Inspection Reports
No. 50-295/88012(ORP);
No. 50-304/88013(ORP)
cc w/ enclosures:
T. J. Maiman, Vice President,
PWR Operations
H. Bliss, Nuclear
Licensing Manager
G. J. Plim1, Station Manager
Jan Norris, Project Manager, NRR
DCD/DCB (RIOS)
Licensing Fee Management Branch
Resident Inspector, RIII
Richard Hubbard
J. W. McCaffrey, Chief, Public
Utilities Division
Mayor, City of Zion
,
RIII