Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20195G662 + (ML20195G662)
- ML20195G663 + (ML20195G663)
- ML20195G665 + (ML20195G665)
- NOC-AE-000502, Forwards Relief Request RR-ENG-2-6,proposing That Boroscopic VT-1 Visual Examination Be Allowed as Alternative to Section XI Surface Examination of Pump Casing Welds,Or Portions of Welds within Pits + (ML20195G667)
- ML20195G668 + (ML20195G668)
- ML20195G670 + (ML20195G670)
- ML20195G673 + (ML20195G673)
- ML20195G674 + (ML20195G674)
- SNRC-1518, Forwards Response to FEMA post-exercise Assessment for 880607-09 Exercise of Local Offsite Radiological Emergency Response Plan & Response to FEMA Regional Assistance Committee Review Comment for Rev 10 of Plan + (ML20195G675)
- ML20195G676 + (ML20195G676)
- ML20195G677 + (ML20195G677)
- ML20195G679 + (ML20195G679)
- ML20195G680 + (ML20195G680)
- ML20195G681 + (ML20195G681)
- ML20195G682 + (ML20195G682)
- ML20195G684 + (ML20195G684)
- ML20195G686 + (ML20195G686)
- ML20195G688 + (ML20195G688)
- ST-HL-AE-2692, Forwards Unreviewed Safety Question Evaluation 88-085 Re Initial Startup Test 24, Loss of Offsite Power Test. Procedure Changed to Allow Reactor Trip to Be Initiated as Result of Loss of Offsite Power + (ML20195G692)
- 05000271/LER-1998-019-01, Forwards LER 98-019-01,as Defined by NUREG-1022,rev 1, Section 2.9.Rept Is Being Reissued Due to Typo on Cover Ltr Submitted with Rept on 981105.Cover Ltr Provided Incorrect LER Number.Encl Rept Date Also Changed to 981112 + (ML20195G693)
- ML20195G694 + (ML20195G694)
- ML20195G695 + (ML20195G695)
- 3F0688-04, Forwards Rev 4 to Modified Amended Security Plan.Rev Withheld (Ref 10CFR73.21) + (ML20195G696)
- IR 05000440/1999003 + (ML20195G698)
- IR 05000254/1988010 + (ML20195G700)
- ML20195G701 + (ML20195G701)
- ML20195G702 + (ML20195G702)
- U-601219, Ro:On 880623,maint Technician Badly Burned in 762-ft Radwaste Evaporator Vapor Body Room.Caused by Performing Work on Wrong Evaporator.Evaporator Secured & Technician Given Medical Attention + (ML20195G704)
- ML20195G707 + (ML20195G707)
- L-88-279, Forwards Replacement Page 5-4 to Rev 13 to Physical Security Plan,Correcting Typo in Description for Item 28.Replacement Page Withheld (Ref 10CFR73.21 & 2.790(a)(3)) + (ML20195G708)
- ML20195G709 + (ML20195G709)
- ML20195G710 + (ML20195G710)
- ML20195G711 + (ML20195G711)
- ML20195G713 + (ML20195G713)
- ML20195G716 + (ML20195G716)
- ML20195G717 + (ML20195G717)
- BSEP-88-0632, Advises That Reactor & Turbine Bldg Flow Rate Measurement Devices Will Be Operational by 900113 Instead of 890113 Due to Plant Project Scheduling Considerations,Per Insp Repts 50-325/87-33 & 50-324/87-32 + (ML20195G720)
- ML20195G721 + (ML20195G721)
- ML20195G722 + (ML20195G722)
- ML20195G723 + (ML20195G723)
- ML20195G724 + (ML20195G724)
- ML20195G725 + (ML20195G725)
- ML20195G726 + (ML20195G726)
- ML20195G729 + (ML20195G729)
- ML20195G730 + (ML20195G730)
- ML20195G732 + (ML20195G732)
- ML20195G733 + (ML20195G733)
- ML20195G734 + (ML20195G734)
- ML20195G735 + (ML20195G735)
- ML20195G738 + (ML20195G738)
- U-603110, Informs That Maint Rule Followup Insp at Clinton Power Station Is Scheduled to Start on 981214 & of Util Readiness for Insp of Maint Rule Program & Implementation at Plant + (ML20195G741)