Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- B17535, Forwards Monthly Operating Rept for Oct 1998 for Mnps,Unit 2.Revised MOR for Aug 1998,encl.No New Requlatory Commitments Are Contained in Ltr + (ML20195D044)
- ML20195D045 + (ML20195D045)
- ML20195D047 + (ML20195D047)
- ML20195D048 + (ML20195D048)
- ML20195D050 + (ML20195D050)
- ML20195D051 + (ML20195D051)
- ML20195D053 + (ML20195D053)
- ML20195D054 + (ML20195D054)
- ML20195D055 + (ML20195D055)
- ML20195D056 + (ML20195D056)
- ML20195D057 + (ML20195D057)
- ML20195D058 + (ML20195D058)
- 05000327/LER-1986-006-01, :on 860318,roving Fire Watch Person Unable to Enter Two Rooms to Check for Fires Due to Inoperable Fire Doors.Caused by Loose Screw in Pull Handle.Door Repaired & Returned to Svc + (ML20195D059)
- ML20195D060 + (ML20195D060)
- ML20195D061 + (ML20195D061)
- ML20195D063 + (ML20195D063)
- L-94-014, Rev 1 to Safety Analysis of Radiological Consequences of SBLOCA at U2 with Delayed CNMT Spray Actuation & NUREG-1465 Core Damage Progression + (ML20195D064)
- IR 05000482/1988012 + (ML20195D065)
- ML20195D067 + (ML20195D067)
- ML20195D068 + (ML20195D068)
- ML20195D069 + (ML20195D069)
- ML20195D071 + (ML20195D071)
- ML20195D074 + (ML20195D074)
- ML20195D076 + (ML20195D076)
- 05000327/LER-1988-019, :on 880424,reactor Trip Signal Generated from Electromagnetic Interference.Caused by Welding Machine Operating at High Frequency Near Source Range Nuclear Instrument Cabling.Signals Can Be Bypassed + (ML20195D077)
- ML20195D078 + (ML20195D078)
- ML20195D079 + (ML20195D079)
- RBG-44690, Forwards 120-day Response to NRC GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment + (ML20195D080)
- ML20195D081 + (ML20195D081)
- IR 05000275/1970001 + (ML20195D082)
- ML20195D083 + (ML20195D083)
- ML20195D084 + (ML20195D084)
- ML20195D087 + (ML20195D087)
- ML20195D089 + (ML20195D089)
- ML20195D090 + (ML20195D090)
- ML20195D093 + (ML20195D093)
- ML20195D097 + (ML20195D097)
- B17491, Submits Revised Response to Violations Noted in Insp Rept 50-336/98-202.Corrective Actions:Test Plan for Pdcr 2-065-95 Was Revised to Incorporate Design Requirements + (ML20195D098)
- ML20195D100 + (ML20195D100)
- ML20195D101 + (ML20195D101)
- ML20195D103 + (ML20195D103)
- PNO-II-86-035, on 860511,partial Loss of Power & Initiation of Train B Safety Injection Occurred When Station Battery 1-B Removed from Svc.Caused by Failure of Adjusted Battery Chargers to Pick Up Load.Power Restored + (ML20195D104)
- ML20195D107 + (ML20195D107)
- U-600585, Documents Justification That Fire in Vicinity of Valves Listed in Section 3.5.1.2,Paragraph 2 of Safe Shutdown Analysis Will Not Prevent Plant Shutdown + (ML20195D108)
- A98053, Forwards Change Instructions for Update to Zion UFSAR, Rewritten to Reflect Permanent Defueled Condition of Plant. & DSAR, + (ML20195D109)
- ML20195D110 + (ML20195D110)
- IR 05000458/1986012 + (ML20195D111)
- ML20195D112 + (ML20195D112)
- ML20195D114 + (ML20195D114)
- ML20195D115 + (ML20195D115)
- ML20195D116 + (ML20195D116)