Advises That Portions of 861216 & 18 & 880107 & 29 Revs to Plant Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable.Util Instructed to Follow Previously Approved Plan for Noted Unacceptable Items
ML20195D048
Person / Time
Site: River Bend Entergy icon.png
Issue date: 06/15/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Deddens J
GULF STATES UTILITIES CO.
References
NUDOCS 8806230022
Download: ML20195D048 (2)


Text

..

J.N I 5192 In Reply Refer To:

Docket:

50-458 DOCUMENTCONTAINS SAFEGUARDS INFORMATION Gulf States Utilities ATTN: Mr. James C. Deddens Senior Vice President (RBNG)

P.O. Box 220 St. Francisville, Louisiana 70775 Gentlemen:

This is in response to your letters of December 16 and 18, 1986, and January 7 and 29, 1988, by which you transmitted changes to the River Bend Station (RBS)

Physical Security Plan (PSP). We have reviewed the information contained in the security plan revisions and have determined that portions of that plan are consistent with the provisions of 10 CFR 50.54(p) and are therefore acceptable.

However, as indicated in the enclosure, certain other portions are unacceptable because they decrease plan effectiveness or need clarification prior to acceptance. Accordingly, you are to follow your previously approved plan in regard to these items.

Resubmit corrected plan pages as appropriate to maintain plan continuity.

Should you want to pursue changing the security plan with respect to the unacceptable changes set forth in the enclosure, you should resubmit under the provisions of 10 CFR 50.90.

The enclosure to this letter contains Safeguards Information of a type specified by 10 CFR 73.21 and will be withheld from public disclosure.

If you have any questions concerning this matter, please contact Mr. A. B. Earnest at

17) 860-8146.

Sincerely, Original Signed By A. B. Beach L. J. Callan, Director Division of Reactor Projects t

Encisoure:

As stated

$ca cc:

(see next page)

MO 88 c v RI IS:RPSB C:P RPSB C:RPSB C:0RP/C D:

W

/.B st/jt RJE tt BMurray EJHeller LJQa lan

/j/ /88 4/g/88

,g /

88 4,//3/88 6/g/88 f

Casework Numbers 50-458/05-XA, 50-458/07-XA, and 50-458/08-XA 88 ENCLOSURE CONTAINS 1\\

DOCUMENT CONTAINS SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION UPON SEPARATION THIS l

o PAGE IS DECONTROLLED

Gulf States Utilities cc w/o Safeguards attachment:

Gulf States Utilities ATTN:

J. E. Booker, Manager-River Bend Oversight P.O. Box 2951 Beaumont, Texas 77704 Gulf States Utilities ATTN:

Les England, Director Nuclear Licensing - RBNG P.O. Box 220 St. Francisville, Louisiana 70775 Louisiana State University, Government Documents Department Louisiana Radiation Control Program Director bec w/ Safeguards Attachment and licensee's letters:

RIV Security File P. A. Starcher, RSGB/NRR Resident Inspector R. D. Martin, RA R. L. Bangart, DI.SS Security Inspector Chief, RPSB RPSB Security File pcc w/o Safeguards Attachment w/ licensee's letters:

/DMB(RG01)

DRP MIS Section Chief, DRP/C l

RIV Files l

RITS Operator R. E. Hall, DRSS l

Project Engineer, DRP/C W. Paulson, NRR Project Manager 50.54(p) Book l

DRS 1

l ENCLOSURE CONTAINS SARGMARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED l

l

~

^~

GULF STATES UTILITIES COMPANY arvta et No sf AtiON POST OFFICE Box 220 ST FRANCi$wttE LOVistA%4 70775 AAf A C00( 504 435 6044 346 6651 Deceber 18, 1986 RBG-25115 File Codes G15.4.1 Mr. Robert D. Martin, Regional Administrator U.S. Nuclear Regulatory Comtission 7

_, [j- "y 3 3 Pegion IV 4

611 Ryan Pla:'a Drive, Suite 1000 Arlington, ibxas 76011 OEC 2 3 E

Dear Mr. Martin:

L --

River Bend Station - Unit 1

~~

Docket No. 50-458 This letter addresses a prior transmittal of Pavision 5 to the River Bend Station Physical Security Plan (PSP) subnitted to Mr. Harold R.

Denton, Director of Nuclear Beactor Regulation, Washington, D.C. frun Mr. W. J. Cahill dated Novmber 25, 1985 (RBG-22709). The PSP, Pcvision 5,

should have been forwarded to the Regional Administrator, Region IV for consideration in accordance with 10CFR50.54(p) with a copy to NRR Washington, D.C.

The inappropriate transmittal was identified by Nuclear Regulatory Cmmission Region IV personnel during Inspection No. 86-38 conducted the week of Novmber 17, 1980. Since the inspector performed a review of Revision 5 to the PSP at that tine and subsequent revisions have been appropriately subnitted, Gulf States Utilities does not plan to resubnit Revision 5 at this time. Caments provided by the inspection regarding Revision 5 of the PSP have been addressed in Pavision 10 of PSP subnittal to you on Decmber 16,1986 (RBG-25093).

Please advise if we may be of further assistance in this natter.

Sincerely,

/,g[J.E. Booker M

Manager-River Bend Oversight River Bend Nuclear Group JEB/EIG/

cc: Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Fbgulatory Ccmnission Washington, D.C. 20555 1'I h -) N h

\\

w SAFEGUARDS INFORMATION S F -58cf p

sp. zea GULF STATES UTILITIES COMPANY RivEROEN0 0AfiON POSTOthCE801220 St F AANCisv1LLE Louisiana 70775 ARE A C00E 504 635 6094 346 8651

(

December 16, 1986 l

RBG-25093 File Nos. G9.5 Mr. Robert D. Martin, Regional Administrator g g f~' %

U.S. Nuclear Regulatory Commission 5

Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 g g g }Cf33 s t./

Dear Mr. Martin:

'~

River Bend Station - Unit 1 Docket No. 50-458 Enclosed are three copies (Nos. 35, 36 and 37) of Revision 10 to the River Bend Station Physical Security Plan.

Also provided as part of the enclosure is an "Explanation of Changes" to facilitate Staff review.

Information contained in these attachments is considered "Safeguards Information" pursuant to 10CFR73.21 and should be handled accordingly.

Sincerely,

/

W.

Cahill, J Senior Vice President River Bend Nuclear Group Enclosures cc:

Mr. Harold R. Denton, Director (Copy No. 34)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 THIS PAGE NOT SUBJECT TO PROTECTIVE REQUIREMENTS WHEN SEPARATED FROM MATERIAL CONTAINING SAFEGUARDS INFORMATION I

. ' Ifii i I ?.

SAFEGUARDS INFORMATION m

)

o.nl

s

,i Y

GULF STATES UTILITIES COMPANY awtR BENO ST Af TON PO$f C5fiCE 80x 220

$Y rp ANCl$VILLE LOVI$1ANA 70775 AR[ A C006 504 635 6094 346 6651 January 7, 1988 RBG-27,256 File Nos. G9.5, G12.23.4.2 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 JAN I 9 888 4

Gentlemen:

J River Bend Station - Unit 1 Docket No. 50-458 Enclosed are four copies (Nos. 10, 11, 12, and 14) of Revision 4, Pages 1, (RBS)

Safeguard Contingency Plan.

11, and 111 to the River Bend Station pages were changed to accurately reflect the record of Revisions for each page contained in the plan.

These changes do not decrease the These effective level of security at RBS.

Plan is considered "Safeguards Information" Information copied from the pursuant to 10CFR73.21 and should be handled accordingly.

S cerely, f

J. C. Deddens Senior Vice President River Bend Nuclear Group JCD/

Enclosures I

16 and 18)

Mr. Robert D. Martin, Regional Administrator (Copy Nos.

cc:

U.S. Nuclear Regulatory Commission

' g g 'g I

Region IV h, i 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 760A1

&\\k g gg Senior Resident Inspector THIS PAGE NOT SUBJECT TO PROTECTIVE REQUIREMENTS WH l

MATERIAL CONTAINING SAFEGUARDS INFORMATION i

W,, Y y l-t h

SAFEGUARDS INFORMATION awWe48 1

i'

SAFEGUARDS INFORMAT10N

'a GULF STATES UTILITIES COMPANY Rivt A Sth0 StADON POST OFFICE 801220 Si paAAcrSwtLt. Lout $ TAN A 73776 ARE A C00t 504 635 6094 346 8651 January 29, 1988 RBG-2 7, 3 60 File Nos. G9.5, C12.23.4.1 b b b bi.

'h 7

Director, Office of Nuclear Reactor Regulations U.S. Nuclear Regulatory Commission Attn: Document Control Desk FEB 3 1988 Washington, D.C. 20555 Gentlemen:

River Bend Station - Unit 1 Docket No. 50-458 Pursuant to 10CFR50.54(p), please find enclosed four copies (Nos. 10, 11, 12, and 14) of Revision 10 to the River Bend Station (RBS) Physical Security Plan (PSP).

Changes have been made to the PSP to accurateJy reflect current activities of the RBS Security Department. The changes do not involve unresolved safety questions nor do they decrease the effectiveness of the security program.

The PSP is considered "Safeguards Information" pursuant to 100FR73.21 and should be handled accordingly.

l Sincerely,

~

('

17 J.C. Deddens Senior Vice President River Bend Nuclear Group JCD/

ch

)

t,,

r,,<

f9r,

\\

(~ : bi Enclosures g'

1 cc:

Mr. Robert D. Martin, Regional Administrator (Copy Nos. 13 and 16)

U.S. Nuclear Regulatcry Con: mission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 Senior Resident Inspector (Copy No. 26) 1 THIS PAGE NOT SUBJECT TO PROTECTIVE REQUIREMENTS WHEN SEPARATED FROM l

MATERIAL CONTAINING SAFECUARDS INFORMATION l