Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20154N284 + (ML20154N284)
- ML20154N286 + (ML20154N286)
- ML20154N288 + (ML20154N288)
- ML20154N289 + (ML20154N289)
- ML20154N290 + (ML20154N290)
- ML20154N291 + (ML20154N291)
- IR 05000029/1988099 + (ML20154N292)
- DCL-86-062, Updates 850222 Response to Allegation 1544 Re silver-brazed Fittings on Capillary Sys.Unit 1 Vol Control Tank Level Instrument (LT-112) Upgraded to Design Class 1B.Conclusions from Destructive Exam Apply + (ML20154N294)
- ML20154N298 + (ML20154N298)
- ML20154N299 + (ML20154N299)
- B12015, Forwards Changes to Initial Test Program,Per License Condition 2.C(10).Requirement for Reactor Trip Test at 50% Plateau & Ref to pseudo-ejected Rod Test Deleted & Note to Test 25 Added.Changes Will Be Included in FSAR Amend + (ML20154N300)
- ML20154N301 + (ML20154N301)
- IR 05000498/1988037 + (ML20154N302)
- ML20154N304 + (ML20154N304)
- ML20154N305 + (ML20154N305)
- ML20154N307 + (ML20154N307)
- ML20154N309 + (ML20154N309)
- ML20154N310 + (ML20154N310)
- ML20154N311 + (ML20154N311)
- 05000483/LER-1988-009, :on 880823,discovered That Excore Neutron Monitoring Sys Power Range Channels Not Surveilled Before Late Finish Time.Caused by Operator Error.Missed Surveillance Completed & Event Reviewed + (ML20154N312)
- 05000440/LER-1988-014, :on 880428,reactor Protection Sys (RPS) Actuation Occurred on Reactor Vessel High Level.Caused by Failure of Contacts to Close in Bypass Relay for RPS Channel A.Relay Replaced & Tested & Old Relay Returned for Analysis + (ML20154N314)
- ML20154N315 + (ML20154N315)
- ML20154N316 + (ML20154N316)
- ML20154N317 + (ML20154N317)
- ML20154N318 + (ML20154N318)
- ML20154N320 + (ML20154N320)
- ML20154N322 + (ML20154N322)
- ML20154N324 + (ML20154N324)
- ML20154N327 + (ML20154N327)
- ML20154N330 + (ML20154N330)
- ML20154N337 + (ML20154N337)
- ML20154N340 + (ML20154N340)
- B12009, Forwards Addl Info Re 851206 Proposed Tech Spec Change Allowing Sleeving of Steam Generator Tubes as Repair Option, in Response to 860221 Request.Special Local Ventilation in Steam Generator Repair Area Provided + (ML20154N341)
- ML20154N342 + (ML20154N342)
- ML20154N343 + (ML20154N343)
- ML20154N344 + (ML20154N344)
- 05000440/LER-1988-015, :on 880430,reactor Scram Occurred Due to Reactor Water Level of Less than Level 3.Caused by Procedural Deficiency.Operating Procedure Revised,Operators Involved Counseled & Operators Trained Re Events Sequence + (ML20154N345)
- ML20154N346 + (ML20154N346)
- ML20154N348 + (ML20154N348)
- ML20154N349 + (ML20154N349)
- ML20154N350 + (ML20154N350)
- ML20154N352 + (ML20154N352)
- ML20154N353 + (ML20154N353)
- ML20154N354 + (ML20154N354)
- ML20154N358 + (ML20154N358)
- ML20154N359 + (ML20154N359)
- ML20154N363 + (ML20154N363)
- ML20154N364 + (ML20154N364)
- SVP-98-315, Responds to NRC Re Violations Noted in Insp Repts 50-254/97-23,50-265/97-23,50-254/98-11 & 50-265/98-11. Corrective Actions:Extended Shutdown for Both Units Was Conducted for Approx One Reactor Year + (ML20154N370)
- IR 05000412/1986004 + (ML20154N371)
- RA-98-065, Application Requesting Termination of QA Program Approval 0891 for Shipment of 239 Plutonium-Beryllium Neutron Sources + (ML20154N373)