'. Dave Morey (
Southern Nuclear
- Vice President
~ OptratiIg Compa:y -
farley Project :
. P0. Box 1295 Birmingham. Alabama 35201'
-l Tel 205.992.5131 i
I October 15, 1998 SOUTHERN COMPANY Energy to Serve YourWorld" Docket Nos.: 50-348' 10 CFR 50.54 50-364 U.S; Nuclear Regulatory Commission ATTN: Document Control Desk -
' Washington, DC 20555 Joseph M. Farley Nuclear Plant Revision to Response to Generic Letter 97-04," Assurance of Sufficient Net Positive
' Euction Head For Emergency Core Cooling And Containment Heat Removal Pumos" Ladies and Gentlemen:
. NRC Generic Letter 97-04 requested addressees to provide information pertaining to the i
L L
- ECCS and containment spray pump NPSH calculations for the recirculation mode. The 90-
. day actions were completed by Southern Nuclear Operating Company (SNC), and the requested information was transmitted by SNC letter dated December 30,1997,
- As a result of this information request, SNC identified needed changes and enhancements to i
the' existing calculations. By letter dated June 1,1998, SNC revised the December 30,1997,-
SNC response to Generic Letter 97-04 to denote the changes to the existing calculations.
Subsequent to the June 1,'1998 submittal, SNC was informed of an error by the vendor in
. performance test data for the spare charging pump. This error has resulted in a change to the required NPSH for the charging pump as documented in the June 1,1998 submittal. The performance testing of the' spare charging pump with the corrected data establishes a required NPSH'of 94 feet at 712 gpm versus the required NPSH of 50 feet at 710 gpm previously
- reported. Adequate margin still exists for the charging pumps as the available NPSH was L
j determined to be 166 feet at a flow of 708 gpm.
t Respectfully submitted,
\\ O f} 771ou Dave Morey l
l KBK/ cit:9704sh. doc
[
cc: Mr. L. A. Reyes, Region II Administrator Mr. J. I. Zimmerman, NRR Project Manager Mr. T. P. Johnson, FNP Plant Sr. Resident Inspector F ~ ~