Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20154N245 + (ML20154N245)
- ML20154N247 + (ML20154N247)
- ML20154N252 + (ML20154N252)
- ML20154N254 + (ML20154N254)
- ML20154N255 + (ML20154N255)
- 05000440/LER-1988-013, :on 880427,RWCU Sys Containment Isolation Occurred.Caused by Increase in Differential Flow Trip Setpoint &/Or Time Delay.Condition Under Evaluation & RWCU Flow Control Valves Engineering Design Change Initiated + (ML20154N256)
- ML20154N257 + (ML20154N257)
- 05000259/LER-1988-024-02, :on 880828,refueling Zone Isolation Occurred Due to Rupture of Diaphram Damper Actuator.Preventive Maint Frequency for Secondary Containment Isolation Dampers Will Be Increased to Once Every 24 Months + (ML20154N258)
- ML20154N259 + (ML20154N259)
- ML20154N260 + (ML20154N260)
- ML20154N261 + (ML20154N261)
- ML20154N264 + (ML20154N264)
- ML20154N265 + (ML20154N265)
- ML20154N266 + (ML20154N266)
- ML20154N267 + (ML20154N267)
- ML20154N268 + (ML20154N268)
- ML20154N269 + (ML20154N269)
- ML20154N270 + (ML20154N270)
- ML20154N272 + (ML20154N272)
- ML20154N275 + (ML20154N275)
- DD-86-02, Advises That Time for Commission to Review DD-86-02 Expired. Commission Declined Review.Decision Became Final Agency Action on 860307.Served on 860313 + (ML20154N276)
- ML20154N277 + (ML20154N277)
- ML20154N278 + (ML20154N278)
- HL-5686, Informs That Corrective Actions Relative to Thermo-Lag 330-1 Issues Are Complete + (ML20154N279)
- ML20154N280 + (ML20154N280)
- IR 05000354/1986002 + (ML20154N281)
- ML20154N283 + (ML20154N283)
- ML20154N284 + (ML20154N284)
- ML20154N286 + (ML20154N286)
- ML20154N288 + (ML20154N288)
- ML20154N289 + (ML20154N289)
- ML20154N290 + (ML20154N290)
- ML20154N291 + (ML20154N291)
- IR 05000029/1988099 + (ML20154N292)
- DCL-86-062, Updates 850222 Response to Allegation 1544 Re silver-brazed Fittings on Capillary Sys.Unit 1 Vol Control Tank Level Instrument (LT-112) Upgraded to Design Class 1B.Conclusions from Destructive Exam Apply + (ML20154N294)
- ML20154N298 + (ML20154N298)
- ML20154N299 + (ML20154N299)
- B12015, Forwards Changes to Initial Test Program,Per License Condition 2.C(10).Requirement for Reactor Trip Test at 50% Plateau & Ref to pseudo-ejected Rod Test Deleted & Note to Test 25 Added.Changes Will Be Included in FSAR Amend + (ML20154N300)
- ML20154N301 + (ML20154N301)
- IR 05000498/1988037 + (ML20154N302)
- ML20154N304 + (ML20154N304)
- ML20154N305 + (ML20154N305)
- ML20154N307 + (ML20154N307)
- ML20154N309 + (ML20154N309)
- ML20154N310 + (ML20154N310)
- ML20154N311 + (ML20154N311)
- 05000483/LER-1988-009, :on 880823,discovered That Excore Neutron Monitoring Sys Power Range Channels Not Surveilled Before Late Finish Time.Caused by Operator Error.Missed Surveillance Completed & Event Reviewed + (ML20154N312)
- 05000440/LER-1988-014, :on 880428,reactor Protection Sys (RPS) Actuation Occurred on Reactor Vessel High Level.Caused by Failure of Contacts to Close in Bypass Relay for RPS Channel A.Relay Replaced & Tested & Old Relay Returned for Analysis + (ML20154N314)
- ML20154N315 + (ML20154N315)
- ML20154N316 + (ML20154N316)
- ML20154N317 + (ML20154N317)