Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000254/1998013 + (ML20153F471)
- RBG-28592, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-458/85-67.Corrective Actions:Revised Procedures Addressing Escort Control of Visitors within Protected Area to Enhance Assignment of Responsibility + (ML20153F472)
- IR 05000341/1988001 + (ML20153F474)
- ML20153F475 + (ML20153F475)
- 05000413/LER-1986-007, :on 860121,during Unit Startup in Mode 2,main Feedwater Pump Turbine (Cfpt) 1A Tripped,Resulting in Automatic Start of motor-driven Auxiliary Feedwater Pump 1B. Caused by Low Vacuum in Condenser + (ML20153F476)
- ML20153F478 + (ML20153F478)
- ML20153F481 + (ML20153F481)
- ML20153F482 + (ML20153F482)
- ML20153F483 + (ML20153F483)
- 05000155/LER-1988-007-01, :on 880629,plant Heat Balance Calculation Determined Reactor Power to Be 45.3% in Preparation for Power Range Monitor Calibr.Caused by Insufficient Gain & Sensitivity Adjustment of GE Monitors + (ML20153F485)
- IR 05000289/1988013 + (ML20153F487)
- ML20153F489 + (ML20153F489)
- ML20153F491 + (ML20153F491)
- ML20153F492 + (ML20153F492)
- 05000295/LER-1985-037, :on 851012,high Alarm Received from Lake Discharge Tank Oa Radiation Monitor During Tank Ob Release Into Canal 2.Auto-closure of Valve to Secure Flow to Canal Failed.Alarm Caused by Failed Detector Tube + (ML20153F494)
- ML20153F495 + (ML20153F495)
- 05000388/LER-1986-002, :on 860122,HPCI Sys Shut Down During Quarterly Flow Surveillance Test.Caused by Leak of Approx 5 Gpm in Pressure Control Valve 2F035 Due to Tear in Main Diaphragm. Diaphragm Replaced.Test Completed + (ML20153F496)
- ML20153F497 + (ML20153F497)
- ML20153F498 + (ML20153F498)
- ML20153F499 + (ML20153F499)
- ML20153F500 + (ML20153F500)
- ML20153F501 + (ML20153F501)
- ML20153F502 + (ML20153F502)
- NLS8800438, Forwards Proposed Operator Licensing & Requalification Exam Schedule Format for Plant,Per Generic Ltr 88-13 + (ML20153F503)
- ML20153F506 + (ML20153F506)
- ML20153F507 + (ML20153F507)
- ML20153F509 + (ML20153F509)
- L-98-179, Requests Withdrawal of Operating Licenses for Listed Individuals,As of 981006,per 10CFR50.74.Individuals No Longer Have Need to Maintain RO or SRO Licenses + (ML20153F511)
- ML20153F512 + (ML20153F512)
- ML20153F514 + (ML20153F514)
- ML20153F515 + (ML20153F515)
- ML20153F516 + (ML20153F516)
- ST-HL-AE-2767, Final Deficiency Rept Re Cracking of ESF Diesel Generator Heads.Initially Reported on 880801.Precautions Added to ESF Diesel Generator Instruction Manual to Ensure Engine Timing Checked Out Prior to Operation Following Maint + (ML20153F517)
- ML20153F519 + (ML20153F519)
- ML20153F521 + (ML20153F521)
- ML20153F522 + (ML20153F522)
- 05000271/LER-1988-010, :on 880802,cable Penetration Area Sys Control Valve Failed to Automatically Operate Upon Receipt of Trip Signal.Caused by Personnel Error.Personnel Counselled in Determining Equipment Operability & Control + (ML20153F529)
- ML20153F530 + (ML20153F530)
- ML20153F531 + (ML20153F531)
- ML20153F533 + (ML20153F533)
- ML20153F535 + (ML20153F535)
- ML20153F538 + (ML20153F538)
- ML20153F539 + (ML20153F539)
- ML20153F541 + (ML20153F541)
- 05000528/LER-1986-009, Corrected Ltr Revising Util Tracking Number Forwarding LER 86-009-00 Re Failure to Isolate Waste Gas Holdup Sys + (ML20153F542)
- ML20153F543 + (ML20153F543)
- ML20153F548 + (ML20153F548)
- ML20153F549 + (ML20153F549)
- B12844, Rev 0 to Spent Fuel Pool Capacity Expansion Project Description & Sar + (ML20153F551)
- ML20153F552 + (ML20153F552)
- ML20153F553 + (ML20153F553)