ML20153F481

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 880612-0715.Violation noted:below-noted Plant Const Activity Conducted W/O Use of Controlled Copy of Vendor Manual VM-TM-1024 in Work Package
ML20153F481
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 08/26/1988
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20153F462 List:
References
50-289-88-13, NUDOCS 8809070312
Download: ML20153F481 (1)


Text

, ._

(

APPENDIX A NOTICE OF VIOLATION GPU Nuclear Corporation Docket No. 50-289 Three Mile Island, Unit 1 License No. OPR-50 During an NRC inspection conducted between June 12 - July 15,1988, one violation of NRC requirements was identified. In accordance with the "General Statement of  ;

Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C, the violation is set forth below.

The 10 CFR Part 50, Appendix B, Criteria V1, "Document Control," and the lic-ensee's NRC-approved Operational Quality Assurance Plan, Revision 1-00, Sec-tion 3.2.1, and ANSI-18.7-1976, Section 5.2.15 require that measures shall assure that documents, including changes, are reviewed for adequacy and ap-proved for release...and are distributed to...the location where the pre-2 scribed activity is performed. The Administrative Procedure No. 1065, "Vendor Document Control," Revision 2, Section 5.0, requires use of controlled manuals t for construction activities.

Contrary to the above, between June 23 and 24,1988, the below-noted plant construction activity was conducted without the use of the controlled copy of the vendor manual (VM-TM-1024) in the work package. The Job Order No.

A25A-V1214 was the "Replacement of Fan Blades on the AH-E-95 A & B Fans,"

(part of the control building ventilation system). As a result, the fan blades were improperly torqued and the incorrect fan hub was described in the installatic' instructions.

j This is a Severity Level IV violation.

I Pursuant to the provision of 10 CFR 2.201, GPU Nuclear Corporation is hereby re-J quired to submit to this office, within thirty days of the date of the letter transmitting this notice, a written statement or explanation in reply, including

for each violation
(1) the corrective steps which have been taken and the results 1

achieved; (2) the corrective steps which will be taken to avoid further violations; and, (3) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending this response time. ,

1 i

i 0FFICIAL RECORD COPY DL50-289/88 0003.0.0 eso9070312 Geos26 08/03/88 PDR ADOCK05oOoyS? g O

,