ML20153F491
| ML20153F491 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 09/22/1998 |
| From: | Geoffrey Edwards PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9809290146 | |
| Download: ML20153F491 (1) | |
Text
__.
x v
-PECO NUCLEAR escocoe,2,comgeev i
Nuclear Group Headquarters l_
A U, nit of PECO Energy 965 Chesterbrook Boulevard Wayne. PA 19087-5691 September 22,1998 Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 U.S. Nuclear Regulatory Commission ATTN: DocumentControlDesk Washington, DC 20555 Subject.
Peach Bottom Atomic Power Station, Units 2 and 3 Resgmse to Request for Additional Information Regarding Floor Response Spectra for Replacement Recirculation Piping Systems
References:
(1) Letter from Mohan C. Thadani, U.S. Nuclear Regulatory Commission (USNRC), to Garrett D. Edwards, PECO Energy Company, dated August 6,1998 (2) Telecon between USNRC (M. Thadani) and PECO Energy Company (J. Hufnagel) on September 22,1998
Dear Sir / Madam:
l Your Request for Additional Information (RAl) which was transmitted by the reference (1) letter requested a response within 45 days from its receipt. As agreed in the i
reference (2) telecon, PECO Energy Company will defer responding to your RAI until such time that it is determined that all requested information is required. Providing a complete response to your RAI, based on its current content, would require considerable time and expense.
If you have any questions, please contact us.
Ve truly yours, ll
__k Garrett D. Edwards Director-Licensing D
cc:
H. J. Miller, Administrator, Region I, USNRC A. C. McMurtray, USNRC Senior Resident inspector, PBAPS 9809290146 980922 PDR ADOCK 05000277 P
PDR J