Summary of 980909 Meeting with NEI in Washington,Dc to Discuss Comments on Draft Rev 0 of NEI 98-03
ML20153F530
Person / Time
Issue date: 09/23/1998
From: Bergman T
NRC (Affiliation Not Assigned)
To: Essig T
NRC (Affiliation Not Assigned)
References
PROJECT-689 NUDOCS 9809290157
Download: ML20153F530 (5)


Text

. - -~

September 23, 1998 MEMORANDUM TO:

Thomts H. Essig, Acting Chiaf Generic Issues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation FROM:

Thomas A. Bergman, Senior Project Manager Origina1 Signed By:

Generic Issues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF MEETING HELD ON SEPTEMBER 9,1998, WITH 1

NEl TO DISCUSS STAFF COMMENTS ON DRAFT REVISION 0 OF l

NEl 98-03 On September 9,1998, the staff held a public meeting with the Nuclear Energy Institute (NEI) at NEi offices in Washington, D.C. The purl ose of this meeting was to discuss staff comments

' on Draft Revision 0 of NEl 98-03, " Guidelines for Updating Final Safety Analysis Reports,"

dated July 8,1998. The staff's comments were provided in a letter dated September 1,1998. lists the meeting participants.

NEl agreed to address the issues raised by the staff in the September 1,1998, letter. For only two issues did NEl propose substantively different solutions than those proposed by the staff.

These two issues concerned comments 28 and 37. Comment 28 addresses the use of the

- term " operating limits." NEl stated that NEl 98-03 would be probably be modified to delete use of the term, but that the guidance would retain language that normal operations and transients needed to be discussed in an updated final safety analysis report (UFSAR). Comment 37 concerned the extent to which temporary modifications needed to be included in a UFSAR. NEl

will propose as an alternative to only include in the UFSAR those temporary modifications for which no schedule has been established or that are planned to remain in place throughout the next periodic update cycle.

NEl stated that they expect to submit the Final Draft Revision 0 to the staff by September 30, 1998. NEl expressed that they desired to distribute Revision 0 at the October 19-20,1998, NEl's public workshop. The staff stated that they would attempt to provide addiional comments on the Final Draft Revision 0 in a time frame to support NEl's public workshop.

Project No. 689

Attachment:

As stated hh h h cc w/att: See next page

\\

\\

DISTRIBUTION: See attached page Document Name:g: tab \\msum0909 v,

SC:P[p OFFICE PM:PGEB M:aw FAk[ewicz WN@

,g NAME b

DATE 9 % /98 9/j3/98 -

OFFICIAL OFFICE COPY

~^

^

9909290157 990923 PDR RtWGP ERONUMRC PDR f(lo3 bM b%g ?N M1

___ _._.._ -._ _._ _..__ _. _ _._. - _.__ _ _.._ _.~._

q l

w ar j

I UNITED STATE 8 l

g

-]

NUCLEAR REGULATORY COMMISSION l'

WASHINGTON, D.C. 30eeH001 Septetbe 23.-1998 l.

MEMORANDUM TO: - Thomas H. Essig, Acting Chief

(

Generic Issues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation Thomas A. Bergman, Senior Project ManageM 'D FROM: Generic Issues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

.OF MEETING HELD ON SEPTEMBER 9,1998, WITH i

NEl TO DISCUSS STAFF COMMENTS ON DRAF l' REVISION 0 OF NEl 98-03 i

On September 9,1998, the staff held a public meeting with the Nuclear Energy Institute (NEI) at NEl offices in Washington, D.C. The purpose of this meeting was to discuss staff comments i

on Draft Revision 0 of NEl 98-03, " Guidelines for Updating Final Safety Analysis Reports,"

' dated July 8,1998. The staff's comments were provided in a letter dated September 1,1998.

l lists the meeting participants.

NEl agreed to address the issues raised by the staff in the September 1,1998, letter. For only two issues did NEl propose substantively different solutions than those proposed by the staff.

These two issues concerned comments 28 and 37. Comment 28 addresses the use of the term " operating limits." NEl stated that NEl 98-03 would be probably be modified to delete use of the term, but that the guidance would retain language that normal operations and transients.

needed to be discussed in an updated final safety analysis report (UFSAR). Comment 37 concerned the extent to which temporary modifications needed to be included in a UFSAR. NEl will propose as an alternative to only include in the UFSAR those temporary modificatbns for which no schedule has been established or that are planned to remain in place throughout the next periodic update cycle.

NEl stated that they expect to submit the Final Draft Revision 0 to the staff by September 30, 1998. NEl expressed that they desired to distribt% Revision 0 at the October 19-20,1998, NEl's public workshop. The staff stated that they would attempt to provide addiional comments on the Final Draft Revision 0 in a time frame to support NEl's public workshop.

Project No. 689

Attachment:

As stated cc w/att: See next page I

,-.c

..,-.7 e

Nuclear Energy Institute Project No. 689

_ cc:

Mr. Ralph Beedle

.Ms. Lynnette Hendricks, Director Senior Vice President Plant Support and Chief Nuclear Officer Nuclear Energy Institute Nuclear Energy Institute '

Suite 400 Suite 400 1776 i Street, NW 1776 l Street, NW Washington, DC 20006-3708 Washington, DC 20006-3708 Mr. Alex Marion, Director Charles Brinkman Programs ABB Combustion Engineering Nuclear Energy Institute 12300 Twinbrook Parkway Suite 400 Suite 330 1776 l Street, NW Rockville, MD 20852 Washington, DC 20006-3708 Mr. David Modeen, Director Engineering Nuclear Energy Institute Suite 400

.1776 i Street, NW Washington, DC 20006-3708 Mr. Anthony Pietrangelo, Director

- Licensing.

Nuclear Energy Institute Suite 400-1776 l Street,- NW

. Washington, DC 20006-3708 Mr. Nicholas J. Liparule, Manager Nuclear Safety and Regulatory Activities Nuclear and Advanced Te::hnology Division Westinghouse Electric Corporation P.O. Box 355 -

. Pittsburgh, Pennsylvania 15230 -

Mr. -Jim Davis, Director Operations Nuclear Energy Institute; Suite 400 -

1776 l Street, NW 4

-Washington, DC 20006-3708 e d

k 4

t

e

_4,'

2

1 Distribution
Mtg. Summary w/ NEl Ro UFSAR Guidance Dated September 23, 1998 Hard Conv n

toodolpile PUBLIC PGEB R/F '

OGC ACRS SMegruder :

' TBergman.

EMail

- SCollins/FMiraglia

' BSheron :

JRoe-DMatthews -

i 1

~ TEssig.

FAkstulewicz i

4

. TBergman i

EMcKenna GTracy, EDO l

i-l

  • l t

I-A

+

_.. _ _ _. _. -, _ _ ~. -. _ _ _.. _.. _. _. _ _. _ _ _......

.e

,i 4

.p,.

=.

List of Attendees I

k, Name.

Organization t.

. Frank Akstulewicz

' NRC LDon Anderson Northern States' Power Co -

' Russ Bell NEl Tom Bergman NRC.

Pat Burke Northern States Power Co Bob Cascarano -

Commonwealth Edison

- Nancy Chapman.

- SERCH/Bechtel

. Donald Chung :

Scientech/LIS Dor Crowe SNC Steve Frantz --

Morgan, Lewis Bockins, LLP

' Tom Harding -

RG&E-John Lee -

Virginia Power Stu Magruder NRC Larry'McDougal FPC Tony Pietrangelo-NE1 Doug Rosinski Winston & Strawn Ken Taplett -

STPNOC

~ Jenny Weil McGraw-Hill Russ Wenzl NPPD l

4 i

'/..

J

--}.,

m

.,/..h 4

m.

er sv 4 '

4

~

e

. Attachment 1

~

ii,

s i

e r-6

--v-'

., =

--m>--

  • - - - - -