Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151X476 + (ML20151X476)
- ML20151X477 + (ML20151X477)
- ML20151X478 + (ML20151X478)
- ML20151X480 + (ML20151X480)
- ML20151X481 + (ML20151X481)
- ML20151X482 + (ML20151X482)
- IR 05000324/1987043 + (ML20151X485)
- ML20151X486 + (ML20151X486)
- ML20151X487 + (ML20151X487)
- NUREG-1117, Forwards Draft NUREG-1117, SER Re Restart of Davis-Besse Nuclear Power Station, Per Response to NRC & Info Submitted W/Course of Action.Schedule for Resolution of Open Issues Listed in Section 1 Requested + (ML20151X489)
- ML20151X490 + (ML20151X490)
- ML20151X492 + (ML20151X492)
- ML20151X493 + (ML20151X493)
- ML20151X496 + (ML20151X496)
- ML20151X497 + (ML20151X497)
- ML20151X498 + (ML20151X498)
- ML20151X500 + (ML20151X500)
- 05000352/LER-1988-027, :on 880721,control Room Ventilation Sys Isolated on Channel D High Chlorine Concentration Signal During Heavy Rain Storm.Caused by Rainwater in Contact W/ Chlorine Analyzer Probe.Mod Implemented + (ML20151X502)
- ML20151X503 + (ML20151X503)
- ML20151X505 + (ML20151X505)
- 05000498/LER-1988-045, :on 880719,reactor Trip on Over Temp/Delta Temp Occurred.Caused by Personnel Error.Detailed Instructions on Qualified Display Processing Sys Reset to Applicable Procedures & Technicians Trained + (ML20151X508)
- AECM-88-0156, Final Special Rept on Events Re Interaction of Activities Associated W/Units 2 & 1,including Control of Chlorine Stored in Unit 2 Controlled Area & Leakage of Const Water Sys in Control Bldg + (ML20151X509)
- ML20151X511 + (ML20151X511)
- ML20151X512 + (ML20151X512)
- 05000312/LER-1988-009, :on 880721 & 25,penetrations Failed Acceptance Criteria & Did Not Receive Hourly Fire Watch & Penetrations Breached,Respectively.Caused by Personnel Error & Procedure Complexity.Procedure to Be Replaced + (ML20151X515)
- ML20151X516 + (ML20151X516)
- ML20151X517 + (ML20151X517)
- ML20151X518 + (ML20151X518)
- ML20151X519 + (ML20151X519)
- ML20151X523 + (ML20151X523)
- ML20151X524 + (ML20151X524)
- ML20151X525 + (ML20151X525)
- ML20151X528 + (ML20151X528)
- ML20151X529 + (ML20151X529)
- ML20151X532 + (ML20151X532)
- ML20151X534 + (ML20151X534)
- IR 05000369/1988022 + (ML20151X538)
- ML20151X542 + (ML20151X542)
- ML20151X547 + (ML20151X547)
- PNO-I-88-082, on 880812,loss of Offsite Electrical Power Occurred.Cause Not Stated.Inspector Will Be on Site on 880815 to Review Status of Facility + (ML20151X549)
- ML20151X550 + (ML20151X550)
- ML20151X551 + (ML20151X551)
- ML20151X552 + (ML20151X552)
- ML20151X554 + (ML20151X554)
- ML20151X555 + (ML20151X555)
- ML20151X558 + (ML20151X558)
- AECM-88-0093, Forwards Remaining Implementation Dates for Safety Issues Mgt Sys Inadvertently Omitted from + (ML20151X560)
- PNO-IV-98-039, on 980914,informed Region IV Staff That Source Disconnect & Possible Extremity Exposure Had Occurred. Licensee RSO Sent Addl Personnel to Site,Including Supervisor & Source Recovery Initiated + (ML20151X561)
- ML20151X564 + (ML20151X564)
- ML20151X565 + (ML20151X565)
- ML20151X566 + (ML20151X566)