Interim Deficiency Rept CP-85-35 Re Inadequate Bolting Matl & Fastener Tension for Cable Tray Clamps.Initially Reported on 861021.Evaluation of Corrective Action Completion Dates to Continue.Next Rept Will Be Submitted by 880727
ML20151X565
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/27/1988
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-85-15, CP-85-35, TXX-88410, NUDOCS 8805040183
Download: ML20151X565 (1)


Text

__

u o

MEE Lo

  1. TXX-88410

~

=

Fi e J 10110 t

C C

903.9 7t# ELECTRIC Ref.#10CFR50.55(e) y,$'",h{g April 27,1988 U. S. Nuclear Regulatory Commission Attn:

Document Control Oesk Washington, D.C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET N05, 50-445 AND 50-446 CABLE TRAY HANGER DESIGN SDAR:

CP-35-35 (INTERIM REPORT)

REF:

SDAR:

CP-83-15. "CABLE TRAY CLAMPS" Gentlemen:

On October 21, 1986, we notified you by our letter logged TXX-6048 of a deficiency involving cable tray hanger design which we deemed reportable under the provisions of 10CFR50.55(e). Our latest report on this issue, l9gged TXX-88147, was submitted January 25, 1988.

This report is submitted to update the corrective action completion schedule for this issue (which includes the issue regarding inadequate bolting material and fastener tension for cable tray clamps - SDAR: CP-83-15).

We are continuing to evaluate the corrective action completion dates and anticipate submitting our next report by July 27, 1988.

Very truly yours, if/Jc W. G. Counsil DAR/grr c-Mr. R. D. Martin, Region IV Resident inspectors, CPSES (3) t P

8805040183 880427 Sy l

PDR ADOCK 05000445 S

DCD 19 MM North Ohva Street iB 81 Ekilas Teses 73.'01 i

-