Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151M632 + (ML20151M632)
- TXX-4659, Deficiency Rept CP-85-43 Re Inconsistency in Temp Between FSAR Normal Operating & Environ Equipment Qualification Ranges.Initially Reported on 850920.HVAC Sys Studied to Assess Room Heat Loads & Equipment Recertified Accordingly + (ML20151M634)
- 05000352/LER-1985-088, :on 851112,spurious half-scram Signal on Reactor Protection Sys Channel B Occurred Along W/Isolation of Various Nuclear Steam Supply Shutoff Subsystems of Undervoltage Relay + (ML20151M638)
- ML20151M640 + (ML20151M640)
- ML20151M641 + (ML20151M641)
- ML20151M644 + (ML20151M644)
- ML20151M650 + (ML20151M650)
- TXX-4658, Deficiency Rept CP-85-46 Re Unacceptable Pressurizer Surge Line Interactions Involving Potential LOCA & Damage to Secondary Side Lines.Initially Reported on 851029.Addl Analyses Will Be Completed Prior to Fuel Load + (ML20151M653)
- ML20151M655 + (ML20151M655)
- ML20151M658 + (ML20151M658)
- W3P88-0987, Forwards Annual Repts for 1987 for Louisiana Power & Light, Inc,New Orleans Public Svc Co & Middle South Utils,Inc + (ML20151M659)
- ML20151M666 + (ML20151M666)
- TXX-4657, Initial Deficiency Rept CP-85-52 Re Structural Integrity of Support Sys for Cable Tray Hangers.Initially Reported on 851218.Verification & Insp Activities Will Be Accomplished by Fuel Load + (ML20151M667)
- ML20151M669 + (ML20151M669)
- ML20151M670 + (ML20151M670)
- ML20151M671 + (ML20151M671)
- ML20151M680 + (ML20151M680)
- ML20151M682 + (ML20151M682)
- 05000352/LER-1985-091, :on 851120,during Startup,Valve Operator for Outboard Isolation Valve of Standby Liquid Control Sys Deenergized in Open Position to Allow Preventive Maint on Valve Operator.Caused by Personnel Error + (ML20151M683)
- ML20151M687 + (ML20151M687)
- ML20151M689 + (ML20151M689)
- ML20151M690 + (ML20151M690)
- 05000373/LER-1985-069-01, :on 851130,LMS-FP-15, Monthly Insp of Tech Spec Fire Hose Stations Not Performed within Time Interval Specified by Tech Specs.Caused by Personnel error.LMS-FP-15 Completed & Foremen Reprimanded + (ML20151M692)
- 05000368/LER-1985-024, :on 851119,insp of 1-inch Expansion Gaps Between Auxiliary Bldg Floors & Reactor Bldg Wall Revealed That Sealing Matl Suffered Physical Degradation.Fire Watch Posted.Work on Sealing Gap Initiated + (ML20151M693)
- ML20151M697 + (ML20151M697)
- ML20151M698 + (ML20151M698)
- TXX-4656, Initial Deficiency Rept CP-85-49 Re Unevaluated Fluid Transient in Two Main Steam Piping Sys.Initially Reported on 851206.Piping Sys Will Be Redesigned to Include Sloping & Addl Drain Pots + (ML20151M700)
- ML20151M701 + (ML20151M701)
- ML20151M709 + (ML20151M709)
- ML20151M710 + (ML20151M710)
- B12978, Forwards Addl Info Re Testing of Struthers-Dunn Relays as Isolation Device for Output Circuits of Facility ATWS Mitigation Sys Actuation Circuitry,In Response to NRC 880718 Request + (ML20151M712)
- ML20151M716 + (ML20151M716)
- ML20151M718 + (ML20151M718)
- ML20151M720 + (ML20151M720)
- ML20151M723 + (ML20151M723)
- ML20151M724 + (ML20151M724)
- ML20151M726 + (ML20151M726)
- ML20151M729 + (ML20151M729)
- ML20151M732 + (ML20151M732)
- IR 05000267/1988006 + (ML20151M736)
- ML20151M737 + (ML20151M737)
- ML20151M739 + (ML20151M739)
- ML20151M740 + (ML20151M740)
- ML20151M742 + (ML20151M742)
- ML20151M743 + (ML20151M743)
- ML20151M746 + (ML20151M746)
- U-601217, Responds to Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping. Revised Inservice Exam Program Plan Encl + (ML20151M747)
- 05000298/LER-1985-019, :on 851127,primary Containment Isolation Sys Group III Isolation Challenged.Caused by RWCU Nonregenerative HX High Outlet Temp of 140 F.Operating Procedure 2.2.65 Revised + (ML20151M750)
- ML20151M759 + (ML20151M759)
- ML20151M761 + (ML20151M761)
- ML20151M769 + (ML20151M769)