ML20151M729
| ML20151M729 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 04/18/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| Shared Package | |
| ML20151M733 | List: |
| References | |
| IEB-85-003, IEB-85-3, NUDOCS 8804250116 | |
| Download: ML20151M729 (3) | |
See also: IR 05000267/1988006
Text
'
'
'
APR i 81988
.
In Reply Refer To:
Docket:
50-267/88-06
Public Service Company of Colorado
ATTN:
Robert 0. Williams, Jr.
Vice President, Nuclear Operations
2420 W. 26th Avenue, Suite 15c
Denver, Colorado 80211
Gentlemen:
This refers to the inspection conducted by Mr. D. E. Norman of this office
during the period February 29 through March 4,1988, of activities authorized
by NRC Operating License DPR-34 for the Fort St. Vrain Nuclear Generating
Station, and to the discussion of our findings with you and other members of
your staff at the conclusion of the inspection.
Areas examined during the inspection included a review of your actions to
implement requirements of IE Bulletin 85-03.
Within these areas, the
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the NRC inspector.
The
inspection findings are documented in the enclosed inspection report.
Within the scope of the inspecticn, no violations or deviations were
identified.
One unresolved item isidentified in paragraph 2.d of the enclosed inspection
report.
We have also examined actions you hnve taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 3 of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased
to discuss them wir.h you.
Sincerely,
@ gnLO Sgocd by
L. J. Callan, Director
Division of Reactor Projects
Enclosure:
Appendix - NRC Inspection Report
50-267/G8-06
cc:
(see next page)
f
RIV:RI*
AC:PSS*
D:DRS*
C:DRP/B
D:DRP h Reconcur
DENorman;df
RElreland
JLMilhoan
TWesterman
L Callan RElreland$
/ /88
/ /88
/ /88
f/)j/88
/g.:f/88 4/b/88
- previously concurred
g(
8804250116 88041e
/h
ADOCK 05000267
O
.
.
,
,,
_
-_
. ._
.
.
.s.'
'
'
.
,
.
In Reply Refer To:
Docket:
50-267/88-06
.
Public Service Company of Colorado
ATTN:
Robert O. Williams, Jr.
Vice President Nuclear Operations
2420 W. 26th Avenue, Suite 15c
- '
Denver, Colorado 8021)
'
'
Gentlemen:
'
This refers to the inspection conducted by Mr. D. E. Norman of this office
,
during the period February 29 through March 4,1988, of activities authorized
-,
by NRC Operating License DPR-34 for the Fort St. Vrain Nuclear Generating
Station and to the discussion of our findings with you and other members of
your staff at the conclusion of the inspection.
t
Areas examined during the inspection included a review of your actions to
impicment requirements of IE Bulletin 85-03. Within these areas, the
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the NRC inspector.
The
inspection findings are documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
Four unresolved items are identified in paragraphs 2.b, 2.c(2), and 2.d of the
enclosed inspection report.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 3 of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
j
L. J. Callan, Director
Division of Reactor Projects
Enclosure:
Appendix - NRC Inspection Report
1
50-267/88-06
.
cc:
(seenextpage)
[j RIV:RI
AC:PSS V
D:hilhoan
'8
.
C:DRP/B
D:LRP
Reconcur
M DENorman;df
RElreland
L
TWesterman
LJCallan RElreland
3 /2 9/88
3 /25/88
$ M /88
/ /88
/ /88
/ /88
'
i
j
l
r
-
-
-
.
.
..
.
.
.
-
. - . - - - _ .
.
o
-
r
. . ,
,'
-
.
-
,
.
.!
'
Public Service Company of Colorado
-2-
,
(
i
,
'
cc w/ enclosure:
'
Fort St. Vrain Nuclear Station
Manager, Nuclear Production Division
' !
16805 WCR 19)
.
Platteville, Colorado 80651
l
Fort St. Vrain Nuclear Station
~
P. Tomlinson, Manager, Quality
l
4
Assurance Division
i
(sameaddress)
!
~
Colorado Radiation Control P/ogram Director
l
6
Colorado Public Utilities Commission
-!
bec to DMB (IE01)
bec distrib. by RIV:
. , .
.
f
- RRI
R. D. Martin, RA
- SectionChief(DRP/B)
- Project Engineer, DRP/B
- RPSB-DRSS
Lisa Shea, RM/aLF
- MIS System
- RSTS Operator
!
'
- K. Heitner, NRR Project Manager
- RIV File
!
- R. Hall
- DRS
j
- TSS
- DRP
j
D. Powers
R. E. Ireland
- D.
Nonnan
C. Berlinger, NRR
t
,
1
!
- w/766
l
l
?
4
i
!
,
I
I
i
,
!
.
,
t
,,
_
,
_-- _ . _ , .
.-,
--_
- . , _ , , , ,
. , , , . . - - , . - - . ,
._w..c.__w-_.
p-.
__.
_,m
.4,
.