Forwards Insp Rept 50-267/88-06 on 880229-0304.No Violations or Deviations Noted.One Unresolved Item Identified in Paragraph 2.d of Insp Rept
ML20151M729
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 04/18/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20151M733 List:
References
IEB-85-003, IEB-85-3, NUDOCS 8804250116
Download: ML20151M729 (3)


See also: IR 05000267/1988006

Text

'

'

'

APR i 81988

.

In Reply Refer To:

Docket:

50-267/88-06

Public Service Company of Colorado

ATTN:

Robert 0. Williams, Jr.

Vice President, Nuclear Operations

2420 W. 26th Avenue, Suite 15c

Denver, Colorado 80211

Gentlemen:

This refers to the inspection conducted by Mr. D. E. Norman of this office

during the period February 29 through March 4,1988, of activities authorized

by NRC Operating License DPR-34 for the Fort St. Vrain Nuclear Generating

Station, and to the discussion of our findings with you and other members of

your staff at the conclusion of the inspection.

Areas examined during the inspection included a review of your actions to

implement requirements of IE Bulletin 85-03.

Within these areas, the

inspection consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the NRC inspector.

The

inspection findings are documented in the enclosed inspection report.

Within the scope of the inspecticn, no violations or deviations were

identified.

One unresolved item isidentified in paragraph 2.d of the enclosed inspection

report.

We have also examined actions you hnve taken with regard to previously

identified inspection findings.

The status of these items is identified in

paragraph 3 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased

to discuss them wir.h you.

Sincerely,

@ gnLO Sgocd by

L. J. Callan, Director

Division of Reactor Projects

Enclosure:

Appendix - NRC Inspection Report

50-267/G8-06

cc:

(see next page)

f

RIV:RI*

AC:PSS*

D:DRS*

C:DRP/B

D:DRP h Reconcur

DENorman;df

RElreland

JLMilhoan

TWesterman

L Callan RElreland$

/ /88

/ /88

/ /88

f/)j/88

/g.:f/88 4/b/88

  • previously concurred

g(

8804250116 88041e

/h

PDR

ADOCK 05000267

O

DCD

.

.

,

,,

_

-_

. ._

.

.

.s.'

'

'

.

,

.

In Reply Refer To:

Docket:

50-267/88-06

.

Public Service Company of Colorado

ATTN:

Robert O. Williams, Jr.

Vice President Nuclear Operations

2420 W. 26th Avenue, Suite 15c

- '

Denver, Colorado 8021)

'

'

Gentlemen:

'

This refers to the inspection conducted by Mr. D. E. Norman of this office

,

during the period February 29 through March 4,1988, of activities authorized

-,

by NRC Operating License DPR-34 for the Fort St. Vrain Nuclear Generating

Station and to the discussion of our findings with you and other members of

your staff at the conclusion of the inspection.

t

Areas examined during the inspection included a review of your actions to

impicment requirements of IE Bulletin 85-03. Within these areas, the

inspection consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the NRC inspector.

The

inspection findings are documented in the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

Four unresolved items are identified in paragraphs 2.b, 2.c(2), and 2.d of the

enclosed inspection report.

We have also examined actions you have taken with regard to previously

identified inspection findings.

The status of these items is identified in

paragraph 3 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

j

L. J. Callan, Director

Division of Reactor Projects

Enclosure:

Appendix - NRC Inspection Report

1

50-267/88-06

.

cc:

(seenextpage)

[j RIV:RI

AC:PSS V

D:hilhoan

'8

.

C:DRP/B

D:LRP

Reconcur

M DENorman;df

RElreland

L

TWesterman

LJCallan RElreland

3 /2 9/88

3 /25/88

$ M /88

/ /88

/ /88

/ /88

'

i

j

l

r

-

-

-

.

.

..

.

.

.

-

. - . - - - _ .

.

o

-

r

. . ,

,'

-

.

-

,

.

.!

'

Public Service Company of Colorado

-2-

,

(

i

,

'

cc w/ enclosure:

'

Fort St. Vrain Nuclear Station

Manager, Nuclear Production Division

' !

16805 WCR 19)

.

Platteville, Colorado 80651

l

Fort St. Vrain Nuclear Station

~

P. Tomlinson, Manager, Quality

l

4

Assurance Division

i

(sameaddress)

!

~

Colorado Radiation Control P/ogram Director

l

6

Colorado Public Utilities Commission

-!

bec to DMB (IE01)

bec distrib. by RIV:

. , .

.

f

  • RRI

R. D. Martin, RA

  • SectionChief(DRP/B)
  • Project Engineer, DRP/B
  • RPSB-DRSS

Lisa Shea, RM/aLF

  • MIS System
  • RSTS Operator

!

'

  • K. Heitner, NRR Project Manager
  • RIV File

!

  • R. Hall
  • DRS

j

  • TSS
  • DRP

j

D. Powers

R. E. Ireland

  • D.

Nonnan

C. Berlinger, NRR

t

,

1

!

  • w/766

l

l

?

4

i

!

,

I

I

i

,

!

.

,

t

,,

_

,

_-- _ . _ , .

.-,

--_

- . , _ , , , ,

. , , , . . - - , . - - . ,

._w..c.__w-_.

p-.

__.

_,m

.4,

.