Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 3F0788-21, Forwards Summary of Differences & Revised Program Statement & Justification Re Fire Protection Plan.Rev 4 to Fire Protection Plan Will Be Submitted by 880830 + (ML20151M105)
- IR 05000285/1997005 + (ML20151M107)
- ML20151M108 + (ML20151M108)
- ML20151M109 + (ML20151M109)
- ML20151M112 + (ML20151M112)
- ML20151M114 + (ML20151M114)
- ML20151M115 + (ML20151M115)
- 05000271/LER-1988-006, :on 880331,sealed Source Inventory & Leak Tests Not Properly Executed.Deficiencies Were Not Noticed by in Line Supervisor Due to Heavy Work Load.Procedure Has Been Properly Executed + (ML20151M118)
- ML20151M119 + (ML20151M119)
- ML20151M121 + (ML20151M121)
- ML20151M122 + (ML20151M122)
- ML20151M124 + (ML20151M124)
- ML20151M127 + (ML20151M127)
- ML20151M128 + (ML20151M128)
- 05000382/LER-1988-020, :on 880701,diesel Generator Fuel Oil Not Analyzed by Specific Procedure.Caused by Personnel Error. Tech Spec Change Requested to Require That Fuel Oil Quality Meet Specs ASTM-D975 But Not Require Tests + (ML20151M130)
- ML20151M131 + (ML20151M131)
- ML20151M132 + (ML20151M132)
- 05000325/LER-1988-016-01, :on 880617,determined That Mounting of Pressure Switches on Nuclear Svc Water Header Cooling Water Supply to Diesel Generators Not Seismically Qualified.Cause Undetermined.Mod Implemented + (ML20151M134)
- ML20151M135 + (ML20151M135)
- BSEP-88-0757, Amends & Updates 880527 Response on Engineering Work Request Program.Expected Date for Full Compliance Will Be 890212 & Addl Resources Have Been Approved to Assure That Future Milestones Will Be Met + (ML20151M137)
- ML20151M138 + (ML20151M138)
- ML20151M142 + (ML20151M142)
- ML20151M144 + (ML20151M144)
- ML20151M145 + (ML20151M145)
- ML20151M147 + (ML20151M147)
- ML20151M148 + (ML20151M148)
- ML20151M150 + (ML20151M150)
- ML20151M151 + (ML20151M151)
- IR 05000482/1997301 + (ML20151M152)
- ML20151M157 + (ML20151M157)
- HNP-97-209, Provides Proprietary Notification That Reactor Operator Fl Litten Has Been Reassigned from Position for Which Util Previously Certified Need for Reactor License.Info Withheld Per 10CFR2.790(a)(6) + (ML20151M159)
- ML20151M160 + (ML20151M160)
- ML20151M167 + (ML20151M167)
- ML20151M173 + (ML20151M173)
- DCL-88-095, Forwards Changes to Rev 16 of Physical Security Plan & Rev 2 to Training & Qualification Plan.Changes Withheld (Ref 10CFR73.21) + (ML20151M179)
- ML20151M182 + (ML20151M182)
- ML20151M184 + (ML20151M184)
- ML20151M188 + (ML20151M188)
- RBG-27698, Forwards Response to Violations Noted in Insp Rept 50-458/88-05 on 880208-12.Response Withheld (10CFR73.21) + (ML20151M190)
- ST-HL-AE-2740, Responds to NRC Bulletin 87-002, Fastener Testing to Determine Conformance W/Applicable Matl Specs. Lists of Suppliers & Mfgs from Which Safety & nonsafety-related Fasteners May Have Been Purchased Encl + (ML20151M193)
- IR 05000445/1984034 + (ML20151M195)
- 05000325/LER-1988-008, :on 880302,discovered That Generic Failure Mechanism Existed for Supply Fans of Diesel Generator Bldg Ventilation Sys.Caused by Excessive Start/Stop of Fans.Fan Rotors Replaced & Returned to Svc + (ML20151M198)
- ML20151M201 + (ML20151M201)
- ML20151M202 + (ML20151M202)
- IR 05000397/1988001 + (ML20151M205)
- ML20151M207 + (ML20151M207)
- TXX-4623, Responds to NRC Re Violations Noted in Insp Rept 50-445/84-34.Corrective Actions:Security Personnel & Quality Mgt Conducted Investigation of Completed Documents to Validate Signature of Inspectors + (ML20151M212)
- ML20151M213 + (ML20151M213)
- ML20151M215 + (ML20151M215)
- ML20151M219 + (ML20151M219)
- ML20151M222 + (ML20151M222)