,8 UNITED STATES g
NUCLEAR REGULATORY COMMISSION 5
j WASHINGTON, D C,20555
...../
)
COMMONWEALTH EDISON COMPANY DOCKET N0. 50-295 ZION NUCLEAR POWER STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 111 License No. DPR-39 1.
The Nuclear Regulatory Comission (the Comission) has found that:
1 A.
The applications for amendment filed by the Comonwealth Edison Company (the licensee), dated December 24, 1987 and modified February 11, 1988, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.
There is reasonable assurance: (1)thattheactivitiesauthorizedby this amendment can be c)nducted without encangering the health and safety of the public, a id (11) : hat such actevities will be conducted in compliance with the Comissd.on's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to tha health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and d i applicable requirements have been satisfied.
2.
Accordingly, the license is amended by c.hanges to the Technical Specifi-cations as indicated in the enclosure to this license amendment and para-graph 2.C.(2) of the Facility Operating License No. DPR-39 is hereby a.Ntnded to read as follows:
$$bDb
[
P
5 i
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No,111, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Daniel R. Muller, Director Project Directorate III-2 Division of Reactor Projects - !!I, IV, V and Special Projects
Enclosure:
Changes to the Technical Specifications Date of Issuance:
April 6, 1988 j
e p sstou f
UNITED STATES
,?>
NUCLEAR REGULATORY COMMISSION E
j WASHINGTON, D. C. 20M5
%...../
COMMONWEALTH EDISON COMPANY DOCKET N0. 50-304 EONNUCLEARPOWERSTATION,U:41T 2 AMENDMENT TO FACILITY OPERATINb LICENSE f
Amendment No. 100 License No. OPR-48 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment filed by the Comonwealth Edison Company (the licensee), dated December 24, 1987 and modified February 11, 1987, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Comission; C.
There is reasonable assurance: (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (11) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specif1-cations as indicated in the enclosure to this license amendment and para-graph 2.C.(2) of the Facility Operating License No. DPR-48 is hereby amended to rer.J as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendrnent No.100, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This amendrent is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Daniel R. Muller, Director Project Directorate III-2 Division of Reactor Projects - III, IV, Y and Special Projects
Enclosure:
Changes to the Technical Specifications Date of Issuance: April 6,1988
ATTACHMENT TO LICENSE AMENDMENTS I
AMENDMENT NO.111 FACILITY OPERATING LICENSE NO. DPR-39 AMENDMENT NO. 100 FACILITY OPERATING LICENSE N0. DPR-48 DOCKET NOS. 50-295 AND 50-304 Revise Appendix A as follows:
REMOVE INSERT 74f 74f 74f1 74f1 74f2 i
i SURVEILLANCE REQUIREMENI
~
LIN111NG CONDITION FOR OPERATION 6.
Plugging or Repajr Limit means the Imperfection depth at or beyond which the tube shall be repaired (ie. sleeving) or removed from service by plugging because it may become unserviceable prior to the next inspection and is t 40% of the nominal tube wall thickness.
Plugging Limit for sleeves means:
l Combustion Engineering Sleeves 8
for the area in the upper weld jolat, any a.
imperfection produced by degradation shall be plugged unless it can he clearly demonstrated by a qualif\\ed NDE technique that the imperfection is < 33% of the nominal wall thickness for I.D.
Imperfections or < 40% thickness of the tube for 0.0. imperfections.
b.
for the area below the upper weld joint any imperfection 2 33% of the nominal sleeve thickness shall be plugged; for the area of the tube behind the sleeve c.
and above the upper weld joint, any imperfection produced by degradation shall be plugged unless it can be clearly demonstrated by. a quallfled NOE technique a
that the imperfection is < 40% of the nominal wall thickness.
Westinghouse Electric Corporation Sleeves d.
for the area of the tube behind the sleeve, above and locluding the upper joint, any imperfection produced by degradation shall be plugged unless it can be clearly demonstrated by a quallfted NDE technique that the imperf ection is < 40%
of the nominal wall thickness.
14I AMENDMENT NOS. 111, 100 17010/17040
i SURVEILLANCE REQUIREMENI LIMITING CONDITION FOR OPERATION for the entire length of the sleeve, any e.
imperf ection > 31%. of the nominal sleeve thickness shall be plugged.
l f.
for the area of the tube behind the lower joint, any imperfection produced by degradation shall be plugged unless it can be clearly demonstrated by a quallfled,NDE l
technlaue that the Imperfection is < 40%
of the no.ilnal wall thickness.
7.
Unserviceable describes the condition of a tube if it leaks or contains a defect large enough to affect its structural integrity in the event of an Operating Basis Earthquake, a loss-of-coolant accident, or a steam fine or feedwater line break as specified in 4.3.1.B.3.0 above.
Tube Inspection means an inspection 8.
of the steam generator tube from the point of entry (hot leg side) completely around the U-bend to the top support of the cold leg.
Sleeve Inspection means an inspection of the '
g.
sleeved portion of the tube.
Combustion Engineering Welded Sleeve This inspection will include the upper a.
weld which forms the new pressure boundary and the sleeve material below the upper weld.
Westinghouse Electric Corp. Mechanical Sleeve i
This inspection will include the entire b.
length of sleeve material.
i AMENDMENT N05.111,100 74f1 12030/17040
^
SURVEILLANCE REQUIREMENT LIMITING CONDITION FOR OPERATION
- 10. Repaired Tube means a tube that has undergone a process that re-establishes its serviceability.
1he sleeving process utilized shall be one of the following:
The Combustion Engineering welded sleeve a.
process as described in Report CEN-331-P.
Revision 1-P.
b.
The Westinghouse Electric Corporation mechanical sleeve process as described in, Report WCAP-11669.
s AMENDMENT NOS. 111, 100 74f2 12030/12040
.