ML20151M202
| ML20151M202 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 07/26/1988 |
| From: | Gallagher J PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Rossi C Office of Nuclear Reactor Regulation |
| References | |
| IEB-87-002, IEB-87-2, NRCB-87-02, NRCB-87-2, NUDOCS 8808040390 | |
| Download: ML20151M202 (18) | |
Text
- - - _ _ _ - - _ _ -
1, e ' ' f PHILADELPHI A ELECTRIC COM PANY 2301 MARKET STREET P.O. BOX 8699 PHIL ADELPHI A, PA 19101 (215) 841 $001 NRCB 87-02 JOSEPH W. G A LL AGHER nJE'ill'.'7v'.7..
July 26, 1988 Docket Nos. 50-352 50-353 Mr. Charles E. Rossi, Director Division of Operational Events Assessment Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Attn Document Control Desk Washington, DC 20555
Subject:
NRC Bulletin 87-02, Supplements 1 and 2 Fastener Testing to Determine Conformance with Applicable Material Specification
Dear Mr. Rossi:
NRC Bulletin 87-02 requested that all holders of operating licenses or construction permits for nuclear power reactors submit information regarding the identity of the suppliers and manufacturers of safety-related fasteners selected for testing.
Subsequently, and as indicated in NRC Bulletin 87-02, Supplement 1, and later clarified in NRC Bulletin 87-02, Supplement 2, the NRC requested information regarding the identity of all vendors from which safety-related and nonsafety-related ferrous fasteners may have been purchased.
The supplemental bulletins delineated two actions to be taken by the licensees.
These actions are restated below along with the Philadelphia Electric Company response.
Action 1:
.... addressees shall provide the following information concerning the procurement of fasteners:
1.
A list of the suppliers and manufacturers from which safety-related ferrous fasteners 1/4 inch in diameter or greater may have been purchased, within the past 10 g-f years, including addresses.
For those fasteners 8808040390 880726 l
PDR ADOCK 05000352 O
i,.*
r'.
Mr. Charles E. Rossi, Director
.Paga 2 purchased from fastener suppliers and/or original equipment manufacturers, any available information that identifies the manufacturer or sub-tier supplier of the fasteners also should be provided."
Response
Safety-related material for use at Limerick Generating Station may be purchased in three ways: 1) by the Station, 2) by PECo Construction, 3) or by Bechtel Power Corporation /Bechtel Construction Inc. Purchasing Departments.
Safety-related material for use in Unit 2, while in construction, is purchased only by Dechtel Power Corporation /Bechtel Construction Inc. Purchasing Departments.
Safety-related material, purchased by Philadelphia Electric Company for use at Limerick Generating Station, Unit 1, is only obtained from approved suppliers and manufacturers listed in the Philadelphia Electric Company approved Evaluated Suppliers List (ESL). yrovides a listing of names and addresses of suppliers and manufacturers from which Philadelphia Electric Company procured safety-related ferrous fasteners.
The attached listing was obtained by a review of the ESL records from the Unit 1 completion date through June, 1988.
In addition to this review, a listing of suppliers and manufacturers based on issued purchase order records was also obtained from Philadelphia Electric Company Purchasing l
Department.
Such listing was used to compare and verify the accuracy of the information provided in Attachment 1.
t In cases where material was transferred after Unit 1 i
completion or purchased by Bechtel for Philadelphia Electric Company use or original installation, Attachment III provides the listing of names and addresses of suppliers and manufacturers from which Bechtel Power Corporation /Bechtel Construction, Inc. obtained safety-related ferrous fasteners.
Attachment III is also applicable for safety-related material used or purchased by Bechtel for use in Limerick Generating Station, Unit 2.
Action 2:
"Por nonsafety-related fasteners the same information as requested in the first two sentences of item 1, above, except that: a) the time of interest is for fasteners procured in the last 5 years and b) the search of available records in this case should include purchase orders unless the licensee utilizes approved vendor lists or qualified supplier lists in procuring nonsafety-related fasteners."
Response
Nonsafety-related material for Limerick Generating Station is also purchased by the methods described in the Action 1 response, with the exception that material is not being exclusively obtained from the Evaluated Suppliers List.
,- i Mr. Charles E. Rossi, Director Paga 3 Attachment II provides the listing of names and addresses of suppliers and manufacturers from which Philadelphia Electric Company procured nonsafety-related ferrous fasteners in addition to the ESL.
Tne provided listing was obtained by the Philadelphia Electric Purchasing Department through a review of existing records of issued 1
purchase orders.
Attachment IV corresponds to the portion of material transferred or purchased by Bechtel for Philadelphia Electric use in Unit 1 or original installation.
Attachment IV is also applicable for material used or purchased by Bechtel for use in Limerick Generating Station, Unit 2.
If you have any questions or require additional information, please do not hesitate to contact us.
/D~ L o
ery truly yours, Attachments cc Addressee W. T.
Russell, Administrator, Region I, USNRC T. J. Kenny, USNRC Senior Resident Inspector
o gA COMMONWEALTH OF PENNSYLVANIA ss.
COUNTY OF PHILADELPHIA J. W. Gallagher, being first duly sworn, deposes and says:
That he is Vice President of Philadelphia Electric Company; i
that he has read the foregoirg response to NRC Bulletin 87-02, "Fastener Testing to Deterr.ine Conformance with Applicable Material Specifications" tre Limerick Generating Station Units 1 and 2 and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information.and belief.
I.
Y 0 4-14_-
V u
Vice President Subscribed and sworn to M
before me this $ ' day d<j, 1988 of v
/
()/)
- $f $._,
Notary Public mmcm A. x*ES W
~ k SW
,,, m
- r PHILACELPHIA ELECTRIC COMPIJW LIMERICK GENERATING STATION, UTCT 1 SUPPLIERS AND MANUFACTURERS FOR SAFETY-RELATED FERROUS FASTENEM
RESPONSE
T.9 NRC COMPLI ANCE BULLETIN 87-02 SUPPLEMENTS 1 AND 2 A'i'rACHMENT I
!!EET 1 OF 3
i PHILADELPHIA ELECTRIC COMPANY LIMERICK GENERATING STATION, UNIT 1 SUPPLIERS AND MANUFACTURERS FOR.
SAFETY-RELATED FERROUS FASTENERS As required by NRC Compliance Bulletin 87-02, Supplements-1 &.2, the following constitutes the list of suppliers and Manufacturers from which Philadelphia Electric Company purchased safety-rclated ferrous fasteners:
VELAN VALVE CORPORATION Avenue "C" Griswold Industrial Park Williston~, VT 05495 COLT INDUSTRIES Fairbanks Morse Division 701 Lawton Avenue Beloit, WI 53511 ANCHOR DARLING VALVE COMPANY P.
O. Box 400 701 First Street Williamsport, PA 17701 ATWOOD AND MORRILL COMPANY 285 Canal Street Salem, MA 01970 ROSEMOUNT INC.
291 Great Valley Pkway Malvern, PA 19355 LIMITORQUE CORPORATION P.
O. Box 11318 5114 Woodall Road Lynchburg, VA 24502 G"NERAL ELECTRIC COMPANY Group Maschellmac Office Complex 1000 First Avenue King of Prussia, PA 19406 INGERSOLL RAND COMPANY Pump Parts Regional Services P.
O. Box 3565 Scranton, PA 18505 GENERAL ELECTRIC COMPANY ATTN:
Order Services - M/C 847 175 Curtner Avenue San Jose, CA 95125 ATTACHMENT I SHEET 2 OF 3
~.
SMITH-KOCH INC.
2536 S.
59th Street Philadelphia, PA 19143 I & I SLING CO.
2626 Market Street Aston, PA 19014 HENRY STEWART CO.
1121 North Delaware Avenue Philadelphia, PA 19125 ROSEMONT INC.
P. O. Box 35129 Minneapolis, MI 543561 HENRY VOGT P. O. Box 1918 1000 West Ormsly Avenue Louisville, KY 40201 BECHTEL WESTERN POWER COMPANY P. O. Box 3965 San Francisco, CA 94105 PAUL MONROE HYDRAULIC-1701 West Sequoia Avenue Orange, CA 92667 CHEMTRON FIRE SYSTEMS 1000 Governor Highway University Park, ILL 60466 TERRY TURBINE 111 Presidential Blvd.
Suite 237 Bala-Cynwyd, PA 19004 BYRON' JACKSON-PUMP DIVISION BORG-WAGNER CORPORATION 200 Ocean Gate Long Beach, CA 90007 BECHTEL WESTERN POWER COMPANY AND BECHTEL CONSTRUCTION INC.
P.
O.
Box A - Sanatoga Branch 1610 Medical Drive Pottstown, PA 19464 A'ITACHMENT I SHEET 3 OF 3
A b
PHILADELPHIA ELECTRIC COMPANY LIMERICK GENERATING STATION, UNIT 1 SUPPLIERS AND MANUFACTURERS FOR NON-SAFETY-RELATED FERROUS FASTENERS
RESPONSE
E NRC COMPLIANCE BULLETIN 87-02 SUPPLEMENTS 1 AND 2 ATTACHMElE II SHEET 1 OF 3
PHILADELPHIA ELECTRIC COMPANY LIMERICK GENERATING STATION ~, UNIT 1 SUPPLIERS AND MANUFACTURERS FOR NON-SAFETY-RELATED FERROUS FASTENERS As required by NRC-Compliance Bulletin 87-02, Supplements 1 and 2, the following constitutes the list of Suppliers and Manufacturers from which Philadelphia Electric Company purchased non-safety-related ferrous fasteners:
FEGELY, J.
& SON INC.
West High Street P. O. Box 619 Pottstown, PA 19464 LAMAN LOESCHE SUPPLY CO.
302 Moore Street Philadelphia, PA 19148 HERRON ASSOCIATES INC.
810 C. Dickerson Road P. O.
Box 1518 North Wales, PA 19454 SHUR-KUT SUPPLY CORPORATION 241 Woodland Avenue P. O. Box 119 Morton, PA 190700119 GENERAL ELECTRIC COMPANY Group Maschellmac Office Complex 1000 First Avenue King of Prussia, PA 19406 GENERAL ELECTRIC COMPANY ATTN:
Order Services - M/C 847 San Jose, CA 95125 ALLIED NUT AND BOLT CO.
P. O. Box 670 King of Prussia, PA 19406 SUPERIOR INDUSTRIAL SUPPLIERS, INC.
P. O. Box 773 l
Wrightstown, PA 18940 MOTIVE SUPPLIERS 106 West Clearfield Street Philadelphia, PA 19133 A-1 PIPE CO.,
INC.
P. O. Box 347 Primos, PA 19018 l
ATTACHMENT II SHEET 2 OF 3
1
)
1.
WELDERS SUPPLY INC.
4501 North >Howard Street Philadelphia, PA 19140 BAILEY CONTROLS C/O Eastern Control 55 West Avenue Wayne, PA. 19087 BECHTEL WESTERN POWER COMPANY P. O. Box.3965 San Francisco, CA 94105 GENERAL ELECTRIC COMPANY Support-Services.Section 158 Gaither Drive Mount Laurel, NJ 08054 BECHTEL WESTERN POWER COMPANY AND BECHTEL CONSTRUCTION INC.
P.
O. Box A - Sanatoga Branch 1610 Medical Drive Pottstown, PA 19464 b
L i
I l-ATTACHMENT II
~
SHEET 3 OF 3 l-
PHILADELPHIA ELECTRIC COMPANY LIMERICK GENERATING STATION, UNITS 1 & 2.
SUPPLIERS AND MANUFACTURERS FOR SAFETY-RELATED FERROUS FASTENERS
RESPONSE
E NRC COMPLIANCE BULLETIN 87-02 SUPPLEMENTS 1 AND.2 ATTACHMENT III s
SHEET 1 OF 5
PHILADELPHIA ELECTRIC COMPANY LIMERICK GENERATING STATION, UNITS 1 &-2 SUPPLIERS AND MANUFACTURERS FOR SAFETY-RELATED FERROUS FASTENERS As required by NRC Compliance Bulletin 87-02, Supplements 1.and 2, the following constitutes the list of' Suppliers and Manufacturers from.which Bechtel Power Corporation /Bechtel Construction Inc. purchased safety-related ferrous fasteners:
A & G ENGINEERING II, INC.
4640 E.
LaPalma Ave.
Anaheim, CA 92807 ALLIED NUT AND BOLT CO.
520 Hertzog Blvd.
P. O. Box 670 King of Prussia, PA 19406 ANDERSON GREENWOOD CO.
P. O. Box 297326 Houston, TX 77297 HUCK MANUFACTURING CO.
8001 Imperial Drive P.
O.
Box 8117 Waco, TX 76714 C. B. IVES & CO. INC.
601 7routon Rd.
King of Prussia, PA 19406 C. B.
IVCS & CO. INC.
P. O. Box-7777-W4440 Philadelphia, PA 19175 C. B.
IVES & CO. INC.
P. O. Box 13953 Philadelphia, PA 19101 CARDINAL IND. PRODUCTS P. O. Box 101278 Atlanta, GA 30392 CHICAGO TUBE & IRON 2531 W.
48th St.
Chicago, IL 60632 ATTACHMENT III SHEET 2 OF 5
d co '
l POWER ENGINEERING P. O. Box 605 Framingham, MA 01701 CONSOLIDATED PIPE SUPPLY Drawer T-325 Nashville, TN 37244 CONSOLIDATED POWER P. O. Box 421 Furlong, PA: 18925-BETHLEHEM STEEL P. O. Box 7788-1677 Philadelphia, PA 19182-0216
.DRILLCO IND., LTD P. O. Box 6205 10-05 35th-Ave.
Long Island, NY 11106 DuBOSE STEEL 1 P.
O.
Box 1098 Highway 24 Roseboro, NC. 28382 TARGET ROCK 1166 E. Broadhollow-Rd.
East Farmingdal, NY 11735 GENERAL ELECTRIC 1515 Market Street Philadclphia, PA.
19102 CARPENTER' TECHNOLOGY 235 New York Drive Ft. Washington, PA 19034 GEORGIA POWER CO.
P. O. Box 282 Wyansboro, GA 30830 CUSTOM ALLOY Rout 513 Califon, NJ 07830 HARDWARE SPECIALITIES INC.
48-75 36th St.
Long Island, NY 11101 HUB, INC.
.P. O. Box 102591 68 Annex Atlanta, GA 30368 ATTACHMENT III SHEET 3 OF 5
, -., -.,, _ ~
a McJUNKIN CORP.
P.'O.
Box 513 Charleston, WV 25322 MEDEDITH-CORP.
PVN Steels 460. Hillside Ave.
Hillside, NJ 07025 RADNOR ALLOYS 950 South 4th Street Harrison, NJ.07029 NOVA MACHINE PRODUCTS P. O. Box 30287 Middleburg, OH 44130 NPS INDUSTRIES P. O. Box 40000 Dept. 470 Hartford, CT 06151 PACIFIC SCIENTIFIC l
P.
O.~ Box 15721 Baltimore, MD 21263 PACIFIC SCIENTIFIC 1100 E. W. Highway Silver Springs, MD 20910 i
PACIFIC SCIENTIFIC 1346 S.
State College Blvd.
Anaheim, CA 92803 l
PACIFIC SCIENTIFIC Kin-Tech Division Dept. 0181 Los Anagoles, CA 90084-0181 WESTINGHOUSE ELEC. CORP.
P. O. Box 340172P Pittsburgh, PA 15264 CARDINAL INDUSTRIES P. O. Box 1430 Highway 460 Grundy, VA 24614 R.E.C. CORP.
47 Cedar St.
New-Rochelle, NY 10801 ATTACHMENT III SHEET 4 OF 5
HUCK MANUFACTURING CO.
85 Grand St.
Kingston, NY 12401 HUCK MANUFACTURING CO.
P. O. Box 77849 Detroit, MI 48277 McJUNKIN CORP.
Dept. L300P Pittsburgh, PA 15264 ATTACHMENT III SHEET 5 OF 5
~
PHILADELPHIA ELECTRIC COMPANY LIMERICK GENERATING STATION, UNITS 1 & 2 SUPPLIERS AND MANUFACTURERS FOR NON-SAFETY-RELATED FERROUS FASTENERS
RESPONSE
T,_O_
NRC COMPLIANCE BULLETIN 87-02 SUPPLEMENTS 1 AND 2 ATTACHMENT IV SHEET 1 OF 3
PHILADELPHIA ELECTRIC. COMPANY LIMERICK GENERATING STATION, UNITS 1 & 2 SUPPLIERS AND MANUFACTURERS FOR NON-SAFETY RELATED FERROUS FASTENERS As required by NRC Compliance.Bulletin 87-02, Supplements 1 and 2, the.following constiti?cs-the list.of. Suppliers.and Manufac-turers-from which Bechtei Power Corporation /Bechtel Construction Inc. purchased non-safety related ferrous. fasteners:
B & G MANUFACTURING CO.
P. O. Box 269 3067 Unionville, Pike Hatfield, PA 19440 CLENDENIN BROTHERS 4309 Erdman Ave.
~ Baltimore, MD 21213 EXCELL TOOL 1 Bay St.
Sterling, NJ- 07980 FASTENING PRODUCTS CO.
Price & Pine.Sts.
Holmes, PA 19043 GENERAL COPPER &. BRASS 414 MacDude Blvd.
Collingdale, PA 19023 GESIPA-CO.
P. O. Box 5068 610 Plum St.
Trenton, NJ 03638 NELSON STUD E.
28th & Toledo Ave.
Lorraine, OH-44055 PARKER SEAL 10567 Jefferson Blvd.
Culver City, CA 90232 PARKER-HANNIFIN i
C/O Mid Atlantic Inst.
P. O.' Box 2825 York, PA 17405 ATTACHMENT IV SHEET 2 OF 3
~
e,a a'
h Plc DESIGN P. O. Box 1004 Benson Rd.
Middleberry, CT 06762 ROBROY INDUSTRIES 1445 S. Penna. Ave.
P. O. Box 218 Morrisville, PA 19067-0218 SKELLY BOLT CORP.
P. O.
Box 583 Burlington, NJ 08016 SOUTHCO FASTENERS 210 H. Brinton Lake Rd.
Concordville, PA 19331 SPECIAL SECTIONS INC.
2266 Tillotson Ave.
Bronx, NY 10475 SPS TECH Highland Ave.
Jenkintown, PA 19046 TEXAS BOLT 3233 W.
11 St.
P. O. Box 1211 Ilouston, TX 77251 ATTACHMENT IV SHEET 3 OF 3