Responds to Util Reaffirming Commitment to Check Auxiliary Feedwater Piping Temp Once Per Shift,Per Generic Ltr 88-03.Commitments Acceptable.Generic Issue 93 Considered Resolved
ML20151M138
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/12/1988
From: Wagner D
Office of Nuclear Reactor Regulation
To: Fay C
WISCONSIN ELECTRIC POWER CO.
References
REF-GTECI-093, REF-GTECI-NI, TASK-093, TASK-93, TASK-OR GL-88-03, GL-88-3, IEB-85-001, IEB-85-1, TAC-67260, TAC-67261, NUDOCS 8804220252
Download: ML20151M138 (2)


Text

.

April 12, 1988 Docket Nos. 50-266 DISTRIBUTION:

4 and 50-301 Luocket files,- NRC & Local PDRS PDIII-3 r/f~

KPerkins GHolahan PKreutzer DWagner OGC-WF1 EJordan JPartlow Mr. C. W. Fay, Vice President ACRS(10)

PDIII-3 Gray File Nuclear Power Departhent L01shan Wisconsin Electric Power Company 231 W. Michigan Street, Room 308 Milwaukee, Wisconsin 53201

Dear Mr. Fay:

SUBJECT:

RESPONSE TO GENERIC LETTER 88-03 (TACS 67260 AND 67261)

On February 17, 1988, the staff issued Generic Letter 88-03, "Resolution of Generic Safety Issue 93, Steam Binding of Auxiliary Feedwater Pumps." This generic letter resolved Generic Issue 93 by continuing the recommendations of IE Bulletin 85-01.

Specifically, you were requested to:

1.

Maintain procedures to monitor fluid conditions within the auxiliary feedwater (AFW) system each shift during times the system is required to be operable. This monitoring is to ensure that fluid temperature at the AFW pump discharge is maintained at near ambient temperature.

2.

Maintain procedures for recognizing steam binding and for restoring the AFW system to operable status should steam binding occur.

In a letter dated March 23, 1988, you reaffirmed your comitment to (1) check AFW piping temperature once per shift, and (2) maintain a procedure addressing the recognition of potential and actual steam binding and restoration actions.

In accordance with Generic Letter 88-03, these commitments are acceptable, and we consider Generic Issue 93 resolved for Point Beach.

Sincerely,

/s /

David H. Wagner, Project Manager Project Directorate III-3 Division of Reactor Projects - III, IV, V and Special Projects cc: See next page l

Office:

LA P III-3 3

PD/PDIIIL Surname:

P tzer 0 Wagner /tg KferkinsQ

/d88 04 /12/88 (M/[l/88 Oate:

f 8804220252 880412 ADOCK050%6 PDR P

Mr. C. W. Fay Point Beach Nuclear Plant Wisconsin Electric Power Company Units 1 and 2 cc:

Mr. Bruce Churchill, Esq.

Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W.

Washington, DC 20037 Mr. James J. Zach, Manager Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Town Chairman Town of Two Creeks Route 3 Two Rivers, Wiscons'n 54241 Chairman Public Service Commission of Wisconsin Hills Farms State Office Building Madison, Wisconsin 53702 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 799 Roosevelt Road Glen Ellyn, Illinois 60137 Resident Inspecter's Office U.S. f;uclear Regulatury Commission 6612 Nuclear Road Two Rivers. Wisconsin 54241 l