DEC 181985
-
.
In Reply Refer To:
,
^
Docket: 50-267/85-31
'
,-
'
Public' Service: Company of Colorado
ATTN:
0.'R. Lee Vice President
t
-.
Electric Production
i?
. P. 0.: Box 840
~
l
Denver,; Colorado 80201-0840
,
,
Gentlemen:
s
This refers;to the inspection conducte'd by'Mr. M. E. Skow of this office during
.the period 0ctober 21-25, 1985, of activities authorized by NRC Operating
License DPR-34 for Fort St. Vrain, and to the discussion of our findings with
' -
Mr. Gahm and other members of you'r staff at the conclusion of the inspection.
.
- Areas examined during the inspection included a follow-up to NRC Inspection
Report 50-267/85-26.- Within these areas, the inspection consisted of selective
-examination of procedures and representative records, interviews with
personnel, and observations by the inspector. These findings are documented-in
'the enclosed. inspection report.
During this' inspection, it was found that certain of your activities were in
'
violation of NRC requirements.
Consequently, you are required to-respond to
these violations, in writing, in accordance with the provisions of Section 2.201
-
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
. Regulations. Your response'should be based on the specifics-contained in the
Notice of Violation enclosed with this letter. Those portions of the Notice of
.
Violation which are considered' closed in paragraph 3 of the enclosed report
need not:be included in your response.
u
We have also examined actions you have taken with regard to previously
-
identified inspection findings. Thestatusoftheseitemsisjdentifiedin
paragraph 3 of the enclosed report.
The. response. directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
I
f
f
4
[
E .g B/A
RPB[A
RPB ' j'!
ESktfw
JPJabdon
JEGaglf4 do
'
M /85
%\\ /85
1% /f
8601020484 851218
h'
ADOCK 05000267
\\ \\(
G
E
.-
. . _ .
- - .
_ . _
_ _ , . _ . . .
_ - - .
_
,
.-
r'
-
- .
~
> - 4-
q ig
~
- h
y
'
'
+
.-Public Service Company of' Colorado
-2-
,
.
~
' Shoul'd you have.any questions concerning this inspection, we will be pleased to
discuss them with you.
,
'
Sincerely,
.
Original Signed By
_
J. E. Ga8liardo
-
J. E. Gagliardo, Chief
.
Reactor Projects Branch
Enclosures:
-
'1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-267/85-31
-
cc.w/ enclosures:
J. W. Gahm, Manager, Nuclear
Production Division -
Fort-St. Vrain Nuclear Station
16805 WCR 191
~ Platteville, Colorado 80651
L.-Singleton, Manager, Quality
Assurance Division
(sameaddress)
-Colorado Radiation Control Program Director
bec to DMB (IE01)
-
-
.
bec-distrib'. by RIV:
~ , RPB
_ .
- DRSP.
'
- Resident Inspector
R. D. Martin, RA
, Section-Chief-(RPB/A) .
- RSB
'
$,
- Section Chief (RSB/ES)