ML20151M108
| ML20151M108 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 07/28/1988 |
| From: | Virgilio M Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20151M111 | List: |
| References | |
| NUDOCS 8808040318 | |
| Download: ML20151M108 (5) | |
Text
.
[
o UNITED STATES g
[
g NUCLEAR REGULATORY COMMISSION E
WASHINGTON, D C. 20555
%,.....j DETROIT EDISON COMPANY WOLVERINE POWER SUPPLY COOPERATIVE, INCORPORATED DOCKET NO. 50-341 FERMI-2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 23 License No. NPF-43 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by the Detroit Edison Company (the licensee) dated November 20, 1987, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities euthorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Opeaating License No. NPF-43 is hereby amended to read as follows:
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.23, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.
DECO shall.,;e rate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
8808040310 080728 PDR ADOCK 050 4l U
P
..-..= -
t g.
J 3.
This license amendment is effective as'of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION l
b MartinJ.Vihiio, Director Project Directorate III-1 Division of Reector Projects - III, IV, V & Special Projects
Attachment:
Changes to the Technical Specifications Date of Issuance: July 28, 1988 i
1 e
1 s-m....
..,r---
v-,-
.,w,,
,,.---ww.-,
.,,.- m -,, _-- me+
--..-,,-.r,,.,.
,,w-,m.----,
.. -9.-7--e
4 ATTACHMENT TO LICENSE AMENDMENT NO. 23 FACILITY OPERATING LICENSE NO. NPF-43 DOCKET NO. 50-341 Replace the following page of the Appendix "A" Techaical Specifications with the attached page.
The revised page is identified tg Amendment number and contains a vertical line indicating the area of change.
The corresponding overleaf page is also provided to maintain document completeness.
REMOVE INSERT 3/4 3-77 3/4 3-77 i
i e
N 4
m
.,,,.._..~__,_,,____,,-,,-..r,.
,,.,, _ _ ~ _. _
._m_._
..~..
TA3LE 3.3.7.12-1 (Continued) 5 RADI0 ACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION 9
MINIMUM CHANNELS E
INSTRUMENT OPERABLE APPLICABILITY ACTION m
4.
TUR8INE BLDG. VENTILATION MONITORING SYSTEM a.
Noble Gas Activity Monitw 1
121 b.
Iodine Sampler 1
122 c.
Particulata Sampler 1
122 d.
Sampler Flow Rate Monitcr 1
123 5.
SERVICE BUILDING VENTILATION MONITORING SYSTEM g
y a.
Noble Gas Activity Monitor 1
121 b.
Iodine Sampler 1
122 c.
Particulate Sampler 1
122 d.
Sampler Flow Rate Monitor 1
123 e
eM
~
TABLE 3.3.7.12-1 m
,, j RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION E
MINIMUM CHANNELS M
INSTRUMENT OPERABLE APPLICA3ILITY ACTION ro 1.
REACTOR BUILDING EXHAUST PLENUM EFFLUENT MONITORING SYSTEM a.
Noble Gas Activity Monitor -
Providing Alarm 1
121 b.
Iodine Sampler 1
122 c.
Particulate Sampler 1
2 122 w
d.
Sampler Flow Rate Monitor 1
123 N
w 2.
OFFGAS MONITORING SYSTEM (At the 2.2 minute j
delay piping) a.
Hydrogen Monitor 1
124 j
b.
Noble Gas Activity Monitor 1
126 1
3.
STANDBY GAS TREATMENT SYSTEM a.
Noble Gas Activity Monitor -
Providing Alarm 1
125 5
I b.
Iodine Sat.11er 1
122 3
c.
Particulate Sampler 1
122
,E d.
Sampler Flow Rate Monitor 1
123 i
e i
t
-l e
- -, - -