ML20151M184
| ML20151M184 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 04/20/1988 |
| From: | Cockfield D PORTLAND GENERAL ELECTRIC CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NUDOCS 8804220277 | |
| Download: ML20151M184 (1) | |
Text
.
SAFEGUARDS '!':-UR. : AY!ON n== Portland General Electric Coiripany summ.
David W. Cockheid Vice President, Nuclear April 20, 1988 Trojan Nuclear Plant Docket 50-344 License NPF-1 U.S. Nuclear Regulatory Comission ATTN: Document Control Desk Washington DC 20555 l
l
Dear Sir:
Security Plan Revision 20 In accordance with the provisions of Part 50.54(p) of Title 10 of the Code of Federal Regulations [10 CFR 50.54(p)] changes to the Security Program at the Trojan Nuclear Plant, as described in the Trojan Security Plan, PGE-1017, have been implemented. Our evaluation has determined that these changes do not decrease the safeguards effectiveness of the Security Program. is a detailed description of the changes, along with a dis-cussion of the reasons for making the changes. Attachment 2 consists of four copies of the replacement pages for the Trojan Security Plan.
Another two copies are being forwarded to the Regional Administrator, Region V.
Attachments 1 and 2 contain Safeguards Information of a type specified in 10 CFR 73.21.
Sincerely, b
Attachments c:
Mr. John B. Martin (2)
Regional Administrator, Region V U.S. Nuclear Regulatory Comission Mr. William Dixon State of Oregon Department of Energy csr-,'
l lh),
u.x b 8804220277 880420 I
PDR ADOCK 05000344 F
DCD 1215W D wn Exc Pm m Ovyn 972N l
l