Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000261/1978016 + (ML20147B049)
- ML20147B050 + (ML20147B050)
- ML20147B053 + (ML20147B053)
- ML20147B054 + (ML20147B054)
- ML20147B055 + (ML20147B055)
- ML20147B057 + (ML20147B057)
- 05000338/LER-1978-085-03, /03L-0 on 780830:Testing of Quench Spray Pump 1-QS-P-1B Showed Pressure Drop of Over 10psi on the Suction Line During Oper,Caused by Wooden Dam in Piping. (Encl to 7810030071) + (ML20147B060)
- ML20147B061 + (ML20147B061)
- ML20147B062 + (ML20147B062)
- ML20147B064 + (ML20147B064)
- ML20147B065 + (ML20147B065)
- 1CAN028804, Monthly Operating Rept for Jan 1988 + (ML20147B066)
- ML20147B067 + (ML20147B067)
- ML20147B068 + (ML20147B068)
- ML20147B070 + (ML20147B070)
- PNO-V-88-013A, on 880114,reactor Bldg Overpressurization Occurred.Investigation Revealed That High/Low Pressure Trip Circuit for Train B Fan Trip Circuit Inoperable.Licensee Continuing Investigation to Determine Root Cause + (ML20147B072)
- ML20147B075 + (ML20147B075)
- ML20147B077 + (ML20147B077)
- ML20147B078 + (ML20147B078)
- ML20147B080 + (ML20147B080)
- ML20147B081 + (ML20147B081)
- ML20147B083 + (ML20147B083)
- ML20147B087 + (ML20147B087)
- ML20147B088 + (ML20147B088)
- ML20147B092 + (ML20147B092)
- ML20147B093 + (ML20147B093)
- ML20147B094 + (ML20147B094)
- ML20147B095 + (ML20147B095)
- ML20147B096 + (ML20147B096)
- IR 05000277/1987036 + (ML20147B097)
- ML20147B098 + (ML20147B098)
- ML20147B099 + (ML20147B099)
- ML20147B100 + (ML20147B100)
- ML20147B101 + (ML20147B101)
- ML20147B102 + (ML20147B102)
- ML20147B104 + (ML20147B104)
- B12808, Provides Addl Info Requested at Meeting & Informs Staff of Status of Repairs to Thermal Shield.Summary of Evaluations Conducted in Conjunction W/Thermal Shield Repairs Encl + (ML20147B106)
- ML20147B107 + (ML20147B107)
- ML20147B108 + (ML20147B108)
- PY-CEI-NRR-0775, Responds to 871107 Request for Addl Info Re post-maint Testing.Requirements Met by Performance of Appropriate Surveillance Following Completion of post-maint Work + (ML20147B109)
- ML20147B115 + (ML20147B115)
- ML20147B116 + (ML20147B116)
- ML20147B117 + (ML20147B117)
- ML20147B119 + (ML20147B119)
- ML20147B120 + (ML20147B120)
- 05000316/LER-1978-062, Forwards LER 78-062/03L-0 + (ML20147B121)
- ML20147B123 + (ML20147B123)
- 05000316/LER-1978-862-03, /03L-0 on 780613:during Mode 1 Oper AB Emergencey Diesel Generator Was Inoper from 2110 Hours on Available.Due to Defective Diodes.(Encl to + (ML20147B126)
- ML20147B131 + (ML20147B131)
- ML20147B133 + (ML20147B133)
- ML20147B134 + (ML20147B134)