Presents Core Flow Rate Test Results to Justify Change in Frequency of Flow Verification from 6 Months & within 90 Days Following Refueling,To Once Per Cycle & within 90 Days of Resumption of Power Operation Following Refueling
ML20147B119
Person / Time
Site: Crane Constellation icon.png
Issue date: 09/26/1978
From: Herbein J
METROPOLITAN EDISON CO.
To: Reid R
Office of Nuclear Reactor Regulation
References
NUDOCS 7810050174
Download: ML20147B119 (2)


Text

.

~/

/

l

/

2 'f7M

,/

a n

/

n,

_n,

/

METROPOLITAN EDISON COMPANY cueswun ar aenem pueuc ununes conpana rios,/

POST OFFICE 80X 542 READING, PENNSYLVANIA 19603 TELEPHONE 215 - 929-3601 September 26, 1978 G01 1k80

-s O

4 Director of ?Iuclear Reactor Regulation Attn:

R. W. Reid, Chief Operating Reactors Branch No. h U. S. Nuclear Regulatory Commission R

Washington, D. C.

20555

}

f i

Dear Sir:

Three Mile Island Nuclear Station, Unit 1 (TMT-1)

Operating License No. DPR-50 Docket No. 50-289 In Met-Ed's letter of April 8,1976 (Gol 0506), specifically in response to Question le of a set of questions from an NRC letter of March 29, 1976, con-cerning Cycle 2 Reload, Met-Ed committed to verifying core flow rate within 3 months following refueling and every 6 months + 30 days thereafter.

The purpose was to ensure that the core flow rate at 100% power remained above 106.5% of the design flow rate so that the analysis resulting in the pover/

flow trip and/or overpressure trip setpoints remained conservative.

The flow rate reported for Cycle 1 in GQL 0506 was approximately 1095.

Since that initial cccmitment, the core flow rate has been measured 9 times, varying between 109.5% and 111.1% o" Cycle 1 design flow.

A summary table is presented below.

Test Date

% of Cycle 1 Desien P_ov 6-15-76 110.hl 11-5-76 110.65 2-9-77 111.11 5-21-77 109.73 7-29-77 110.26 10-25-77 109.89 l-29-78 109.51 5-8-78 110.55 7-26-78 110.68 In view of the above results, Met-Ed proposes to change the frequency of flow verification tests to once per cycle, within 90 days of resumption of

$60l S *

w. w

/4 os#

g,o

R. W. Reid, Chief

_2-September 26, 1978 GQL 1h80 j

power operation following refueling. Met-Ed requests NRC approval of this proposed change.

1 Sincerely,

'/J.

. Herbein

', ', ' Vice President-Generation j

,/