ML20147B055

From kanterella
Jump to navigation Jump to search
Environ Tech Spec Violation Rept 78-7 Informing of Failure to Perform Monthly Functional Surveillance Test at Reactor Bldg Stack Radiation Monitor in July Because of Routing Error.Test Will Be Issued Directly to Elec Maint Dept
ML20147B055
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 09/21/1978
From: Hammond E
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To: Harold Denton
Office of Nuclear Reactor Regulation
References
DAEC-78-404, NUDOCS 7810020243
Download: ML20147B055 (2)


Text

,-.

S IOWA EtscTaic LIGHT AND POWER COMPANY DUANE ARNOLD ENERGY CENTER P.

O.

Box 351 Cedar Rapids, Iowa 52406 September 21, 1978 DAEC 404 Mr. Harold Denton, Director Office of Nuclear Reactor Regulation U.

S.

Nuclear Regulatory Commission 1717 H Street NW Washington, D.

C.

20545 Re:

Duane Arnold Energy Center

Subject:

Environmental Technical Specification Violation Report 78-7 File:

A-ll7

Dear Mr. Denton:

This report is submitted in accordance with the requirements of Appendix B to Operating License DPR-49, Specification 3.3.1.C.5.

Problem on September 11, 1978 it was determined that the monthly functional I

surveillance test of the reactor building stack radiation monitor l

was not performed in July.

The surveillance test was to be done l

on July 26, 1978 and was not done until the suisequent test on August 24, 1978.

Investigation The surveillance test was not done due to an apparent routing error.

The test is normally distributed by the surveillance coordinator to the radiation protection department and then routed to the electrical maintenance department which actually performs the test.

For some unknown reason the test was not in the electrical maintenance surveillance test file until the August tests were issued.

This same problem was identified in ETSV Report 78-6.

Corrective Action In order to help preclude routing errors, the surveillance test will be issued directly to the electrical maintenance department.

In addition, the test will be listed on the electrical maintenance monthly surveillance test issuance list.

(0,

0 i0J

's

Mr. Harold Denton Page 2 September 21, 1978 When the test was performed on August 24, 1978 the reactor building i

stack radiation monitor was found to be operable.

This report has been reviewed and approved by the Duane Arnold Energy Center Operations Committee and Safety Committee.

Very truly yours, Wb J Ellery L.

Hammond Chief Engineer Duane Arnold Energy Center ELH/JVS/nf cc: