Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137K836 + (ML20137K836)
- ML20137K838 + (ML20137K838)
- ML20137K841 + (ML20137K841)
- ML20137K843 + (ML20137K843)
- ML20137K846 + (ML20137K846)
- ML20137K847 + (ML20137K847)
- ML20137K850 + (ML20137K850)
- ML20137K851 + (ML20137K851)
- ML20137K854 + (ML20137K854)
- U-602714, Proposed Tech Specs Table 3.3.8.1-1 Re Loss of Power Instrumentation + (ML20137K856)
- ML20137K857 + (ML20137K857)
- ML20137K861 + (ML20137K861)
- ML20137K864 + (ML20137K864)
- ML20137K865 + (ML20137K865)
- IR 05000271/1985037 + (ML20137K868)
- U-600410, Forwards Description of Current & Proposed Fire Protection Program.Fire Protection Evaluation Rept & Safe Shutdown Analysis Will Be Incorporated Into FSAR Chapter 9 & Tech Specs Sections Will Be Deleted Before Fuel Load + (ML20137K870)
- 05000341/LER-1985-080, :on 851128,operator Failed to Place Radiation Monitor in Svc While Releasing Liquid Effluent.Caused by Operator Error & Supervisor Failure to Follow Procedures. Staff Counseled.Standing Order Issued + (ML20137K873)
- ML20137K874 + (ML20137K874)
- BSEP-97-0120, Application for Amends to Licenses DPR-71 & DPR-62,revising Definitions for ECCS Response Time,Isolation Sys Response Time & Reactor Protection Sys Response Time + (ML20137K877)
- ML20137K879 + (ML20137K879)
- ML20137K881 + (ML20137K881)
- ML20137K882 + (ML20137K882)
- 05000387/LER-1985-035, :on 851216,bus 10 Loads Transferred to Bus 20 Due to 230-kV Transmission Sys Fault.Fault Caused Momentary Loss of Power to Units 1 & 2.Units Stabilized & Affected Sys Restored + (ML20137K884)
- ML20137K885 + (ML20137K885)
- ML20137K888 + (ML20137K888)
- ML20137K889 + (ML20137K889)
- ML20137K892 + (ML20137K892)
- ML20137K893 + (ML20137K893)
- IR 05000528/1996009 + (ML20137K894)
- ML20137K898 + (ML20137K898)
- ML20137K899 + (ML20137K899)
- ML20137K902 + (ML20137K902)
- ML20137K904 + (ML20137K904)
- ML20137K906 + (ML20137K906)
- ML20137K907 + (ML20137K907)
- 05000334/LER-1985-020, :on 851209,during Meeting W/Westinghouse Discovered That Rate Trip Setpoints Nonconservative in Case of 5% Ramped Change.Caused by Misinterpretation of Mfg Bulletin.Procedure Revised,Channels Recalibr + (ML20137K908)
- ML20137K910 + (ML20137K910)
- 05000325/LER-1985-067, :on 851227,loss of Emergency Ac Bus E-1 During Channel Testing of Units 1 & 2 Degraded Voltage Relays. Caused by Procedural Weakness Leading to Actuation of Voltage Logic.Procedure Will Be Revised + (ML20137K913)
- ML20137K916 + (ML20137K916)
- ML20137K917 + (ML20137K917)
- IR 05000482/1985036 + (ML20137K919)
- ML20137K921 + (ML20137K921)
- ML20137K923 + (ML20137K923)
- CY-97-033, Supplements Response Provided by to NRC Confirmatory Action Ltr, Re Engagement of Independent Assessor to Assess Quality & Performance of Radiological Control Program & Its Implementation + (ML20137K925)
- IR 05000219/1985036 + (ML20137K926)
- ML20137K929 + (ML20137K929)
- IR 05000010/1985015 + (ML20137K933)
- ML20137K935 + (ML20137K935)
- ML20137K940 + (ML20137K940)
- ML20137K943 + (ML20137K943)
- ML20137K945 + (ML20137K945)