Forwards Ninth Fire Protection Mods Progress Rept,Including Description of Safe & Alternative Shutdown Mods & Update of Penetration Sealing & Fire Damper Programs,Per 830225 Commitment.Previous Rept Submitted Sept 1985
ML20137K850
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 01/17/1986
From: Boyer V
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Bernero R
Office of Nuclear Reactor Regulation
References
NUDOCS 8601240243
Download: ML20137K850 (17)


Text

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101

v. s. so vra m s: 84i.4 soo SR. VICE PRESIDENT Nuc'E AR mwER January 17, 1986 Docket Nos. 50-277 50-278 Mr. Robert M. Bernero Division of Boiling Water Reactor Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

SUBJECT:

Peach Bottom Atomic Power Station Fire Protection Modifications Progress Report REFERENCES : (1) Letter, J. W. Gallagher to D. G. Eisenhut, dated February 25, 1983 (2) Letter, J. W. Gallagher to H.L. Thompson, Jr., dated September 24, 1985

Dear Mr. Bernero:

Philadelphia Electric Company, in the Reference (1) letter, proposed to submit Peach Bottom's Fire Protection Modifications Progress Report to the NRC every four months starting in May, 1983.

This letter includes: The ninth Modifications Progress Report (Attachment 1); (I) a progress report addressing safe shutdown modifications; (II) a progress report addressing alternative shutdown modifications; (III) an update of the penetration sealing program; and (IV) an update of the fire damper program.

I. Safe Shutdown Modifications III.G.2 The attached modification progress report (Attachment 1) indicates that eight modifications have been completed since the last report dated Septeraber, 1985. All other modifications, with the exception of the modifications discussed below, are progressing on schedule.

8601240243 860117 PDR 8f ADOCK 05000277 F pop ,f L

.

  • Mr. Robnrt M. Bernero January 17, 1986 Page 2
1. The unavailability of qualified thermal-magnetic type breakers to replace several of the 480 volt motor control center magnetic trip-only circuit breakers continues to delay completion of the breaker replacement modifications 1029J, K, and L. Several breaker vendors were contacted, and their qualification test reports were reviewed and rejected.

In all cases, the test temperatures did not envelope our HELB/LOCA qualification requirements. PECo is presently performing a re-analysis in an attempt to reduce the number of breakers requiring environmental qualification at high ambient temperatures. Efforts are also underway to refine the HELB/LOCA temperature profiles in an attempt to reduce the maximum required temperatures of the profiles.

2. A modification that was scheduled to be completed by the end of the Unit 2 outage was not completed because the new equipment was not available at the time of the last diesel generator outages. This modification involves the replacement of selected ground overcurrent relays. The modification will be done during the next diesel generator outages scheduled for the Summer of 1986.

II. Alternative Shutdown Modifications III.L The attached modification status report indicates that progress is continuing on schedule for the Alternative Shutdown Modifications with the exception of Mod 1353I:

Emergency Lighting and Communications. This modification provides the lighting and communications needed for Unit 3 Alternative Control S*ations. This modification originally had an expected completion date of December 31, 1985. The present status of the mod is that engineering and design of the lighting portion is complete; materials are ordered and some have been received; construction start is awaiting remaining materials; and the design of the communication portion is just beginnning.

The delay in these mods does not degrade Peach Bottom's fire protection capabilities since these emergency lighting and communication features are not needed until Alternative Shutdown capability is provided. The new completion date in the attached report is 2E00 (87) when all Alternative Shutdown systems will be operational.

l L -

  • Mr. Robert M. Bernero Jcnuary 17, 1986 Page 3 III. Penetration Seal Program III.M Installation of penetration seals to satisfy the requirements of Section III.M of Appendix R is complete.

Final inspection of four barriers remains.

IV. HVAC D ampe r P rog ram III .G . 2 A. Installation The installation of three-hour qualified dampers in ventilation ducts penetrating safe shutdown barriers is continuing. The following tabulation provides a status of the fire damper program:

Unit 3 Unit 2 Common Total Qualified 11 8 15 34 Complete 16 14 16 46 Exemption 17 20 24 61 Requested To Do 0 4 5 9 Total 44 46 60 150

2. Six of the remaining nine dampers are in various stages of installation. We expect to complete this program by March, 1986.

If you have any questions regarding this matter, please do not hesitate to contact us.

Very truly yours, f-Attachments cc: T. P. Johnson, Resident Site Inspector NRC Document Control Deck L-- _ _ _ _ _ _ _ _ _ _ _ ____ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Attachment 1 Page 1 of 14 January, 1986

.PBAPS Fire Protection Mod Progress Report Revised to Account for Proposed Alternative Shutdown Sys tem (Thi s Repor t Supersedes the May, 1985 Report)

Key: 2-EOO means " Unit 2 - End of Next Ref ueling Outage" N/A - Not Applicable Expected Mod Description Status Completion Dates Mod. No.

Raroute .ZD201024K and Complete Completed 1029B ZD201027B th.e n encapsulate in Fire Zone 4-4C.

Encapsulate 4 raceways No e ncapsulation N/A in Fire Zone 4B. necessary.

Encapsulate 3 Complete Completed 1029A raceways in Fire Zone 4-4 C - Z A2 D855 ZA2M001, ZA2 D417 Raroute ZD201024K in Complete Completed 1029B Fire Zones 6-5E a nd 6-5G.

Fix ZA3Ol827A (reroute Complete Completed 1029B in Fire Zone ll-12C) .

Encapsulate Raceway encapsula- Completed 1029A ZB3M002 in tion complete.

Fire Zone ll-12C.

Encapsulate ZA2M417; Complete Completed 1029A ZB3D002 in Fire Zone 11-75.

Encapsulate conduits Complete Completed 1029A Z A2 B1249, ZC2 B1247 and ZA2B143 in Fire Zone 50-78 A.

t.

. Attachmont 1 Page 2 of 14 January, 1986 Expected Mod Description Status Completion Dates Mod. No.

Encapsulate conduits Complete Completed 1029A ZC3B137, ZC3B15 0 and Junction Box J17 in Fire Zone 50-78 A.

Encapsulation 1/2 SSA Complete Completed 1029A Rnceways in Fire Zone 5 0-78 B.

Encapsulate ZB3D1802A, Complete Completed 1029A B and ZD3DD01E in Fire Zone 31-118.

Encapsulate ZD3DD01E Complete Completed 1029A in Fire Zone 32-119.

Rolocate battery chargers Complete Completed 1029C 3B D03 & 3DD0 3, then 1029A encapsulate ZB3BD01E in Fire Zone 32-120.

Encapsulate OG03H Complete Completed 1029A and ZA2AG1213 in Fire Zone 35-122.

Radesign 2A1706R - Complete Completed 1029A oncapsulate OGO3H

, and ZA2 AG121B in Fire Zone 37-124.

Redesign 2A1603R - Complete Completed 1029 D oncapsulate ZB2BD01E in 1029A Fire Zone 32-125.

R21ocate battery charger Complete Completed 1029C 2DDO3, then 1029A oncapsulate related cables in Fire Zone 39-126.

Encapsulate ZB2BD01E, Encapsulation N/A ZBOB6143C and unnecessary due ZB2Bil22A in fire Zone to new saf e shutdown 39-126. strategy and field i survey results.

l Encapsulate Complete Completed 1029A Z A2 A15 05A in Fire Zone 40-127.

L

5. -

Attachmont 1 Paga.3 of 14 January, .1986 Expected Mod Description Status Completion Dates Mod. No.

Encapsulate ZB2D1802A, Complete Completed 1029A B 'end ZB2BD01E in Fire Zone .41-128.

Encapsulate ZA2B1249, Complete Completed 1029A ZA2B14 3 and ZC2B1247 in Fire Zone 50-130.

Rsdesign Complete Completed 1029D cables 2 A1603J, K, L, 2A1706J, K, L-in Fire Zones43-132, 44-133,45-134 and 46-135 as required.

Encapsulate ADS /CS Complete Completed 1029A raceways in Fire Zone 11-147.

Upgrade penetration seals Final inspection 2-Cons tr. Complete 1110 to required ratings as of four barriers 3-Completed previously committed in r emai ns .

oorrespondence from J. W. Gallagher to D.G. Eise nhut dated 10/14/81.

Change the settings on Complete Completed 2-1029G die following 4kV Units 2 & 3 3-1029H circuit breakers:

Unit 2-152-15 05, 152-1705, 152-1806:

Unit 3-152-15 05 . . .

152-1806.

Change the settings on Complete Completed 3-lO29H the 480V load center Units 2 & 3 2-1029G circuit breakers:

Unit 2-1013 ... 1322; Uni t 3-1212 . . 1114.

Rsplace the following Qualified End of first 2-1029J, 480V motor control center breakers unavail- outage, commencing magnetic-only circuit able. PEco perfo rm- af ter material 1029K ,

becakers with thermal ing analysis. to availability. 3-lO29L magnetic circuit breakers: j us ti fy a change to design requir eme nts .

L _- _ - - - - -

' Atttchm:nt 1 Page 4 of 14 January, 1986 Expected Mod Description Status Completion Dates Mod. No.

Unit 2-3671 .. 2851 Common-495 5, 5 05 5, 6131 Unit 3-3851 .. 6033.

( Ac previously committed to in correspondence f rom S. L. Daltrof f to D. G.

Eice nhut , d ated January 12, 19 83.)

Add new ground overcurrent Complete Completed 1029M relays to the f ollowing 4kV circuit breakers:

Unit 2-152-1606 and 152-1709.

R place the existing Design 2-First Equipment 1029N ground overcurrent relays complete. Outage; Scheduled for the following 4kV Relays for 1986, circuit breakers: d eli ve red .

Unit 2; 152-1606 and 152-1704.

Add eight-hour battery Complete Completed 1029R power supply capability (Alternative to the Emergency Lighting shutdown Syatem in the f ollowing system design locations: Main Control will add Ro om , Remote Shutdown additional Panels, Cable Spreading areas.)

Room (selected locations),

Four Emergency Switchgear Ro oms , HPSW P' mp bays and tho f ifth b3y in the DG Building.

Provide a water curtain Complete Completed 10290 in the west carridors of reactor building, elev.

135; Units 2 and 3.

System Automation Complete Completed 1029U of Wate r Curtain in the Wes t Corridors of rc. actor building.

Icolate the corridor Complete Completed 1029S behind the emergency cwitchgear rooms.

L

Attachnont 1 Page 5 of 14 J anua ry, 1986 Expe cted Mod Description Status Completion Dates Mod. No.

Provide dikes fo r Complete Completed 1029T Eaorgency Load Canters on elevation 16 5, Units 2 and 3.

Provide smoke detectors Complete Completed 1029W in Fire Zones50-78A and 5 0-82 since the zones have a fixed coabus tible loading cnd no existing smoke dctection sys tem.

Provide smoke detectors Complete Completed 1029W in Fire Zones 2-70, ll-72E,11-72F, and 11-74 cince the zones have a f ixed combus tible loading and no exis ting emoke detection sys tem.

Provide line type heat Complete Completed 1029W dete cto rs in cable tray in Fire Zone 29-108 since tho area has a fixed combus tible loading and no existing fire detection sys tem.

Provide smoke detectors Complete Completed 1029W in Fire Zones 26-7 6 and 22-77 due to the possibility of transient combustibles in these zones .

Reroute conduit ZB2 D785 Complete Completed 1029B outside of Fire Zones50-78B and 50-78W l

Encapsulate ZA2 A1506A Complete Completed 1029A in Fire Zone 50-131.

Encapsulate raceways Complete Completed 1029A ZA2M16 5 and ZA2M166 in the nordi hal f of Fire Zone 6-5H.

Encapsulate raceway Completion not N/A 1029A ZB3P315 in the south necessary due to hal f of the Fire Alt. Shutdown Zone 13-13 H. Mods.

L--

, Attcchmsnt 1 Page 6 of 14 J anua ry, 1986 l Expected Mod Description Status Completion Dates Mod. No.

R; route 201019B, F Complete Completed 1029B cnd encapsulate new Zone 5-5H.

I Reroute ZB202074A Design complete. Completed 1029B j

No encapsulation necessary.

R; route ZA2 B5 944A Complete Completed 1029B f rom Fire Zone 11-72B.

l l

Install a single Complete Completed 1029W l cmoke detector in tho drywell access hatch areas of both units, Fire Zones 6-2 2 and 13-28.

l Tha detectors are

. to be tied into existing

! loops on 135' of the Rx Bldgs.

l Encapsulate ZD2P219 Complete Completed 1029A in Fire Zone 4-6.

Encapsulate ZA2LO75 Complete Completed 1029A I in Fire Zone 5-7.

l l Encapsulate ZD3 LOO 4 Complete Completed 1029A in Fire Zone 12-15.

Install a single Complete Completed 1029W cmoke detector in Fire Zone ll-6 5C.

Tho detector is to be ticd into the existing loop on 91 ' -6 " of the Rcdwaste Bldg.

, In3 tall 3-hour 9 d ampe rs 3/1/86 1309

! rated fire dampers remain to in HVAC ducts be ins talled.

penetrating fire barriers.

In3 tall battery charger Complete Unit 3 - Completed 1029B

! cross-tie feeds. Units 2 &3 Unit 2 - Com71eted l These cross-tie feeds

! will be encapsulated ca required.

L

Attcchmont 1 Page 7 of 14 January, 1986 Expected Mod Description Status Completion Dates Mod. No.

Encapsulate ZA2M416 Complete Completed 1029A in Fire Zone 6-5H.

Encapsulate cable Complete Completed 1029A ZD2B3983A in Fire '

Zone 38-125.

Reroute ZD3 D489 See listing Completed 1029A in Fire Zone for Fire Zone '32-119. 31-118. ZD3 D4 89 to be rerouted to avoid encap-sulation, design complete.

Encapsulate ZB3M149 in Complete Completed 1029A i Fire Zone 31-118. l Encapsulate ZB3M149 Complete Comple ted 1029A I in Fire Zone 33-120.

Rolocate B and D Relocation complete. Completed 1029B l Dicsel Ge nerato r MCC Encapsulation focds, complete, j Encapsulate ZC3 D481 Complete Comple ted 1029A cnd ZC3D482 in Fire Zone 34-121.

l Encapsulate ZA2 D641 Complete Completed 1029A in Fire Zone 35-122.

Encapsulate ZC3 D481 Complete Completed 1029A  !

and ZC3D482 in Fire l Zone 36-123.

l Encapsulate ZA2 DG41 Complete Completed 1029A in Fire Zone 37-124.

Encapsulate ZC2A484 Complete Completed 1029A I in Firo Zone 48-144.

Reroute 5 cables in Design complete. 2-Completed 1029B Fire Zone 6-5H - Installation ZC2B3814A ZC201228A, B; scheduled.

ZC2012300, C.

Rcroute ZC201228B Design complete. 2-Completed 10298 cnd ZC201230B in Installation Fire Zone 6-5J. scheduled.

' Attachmont 1 Page 8 of 14 January, 1986 Expected Mod Description Status Completion Dates Mod. No.

R; route 4 cables in Complete 2-Completed 1029B Fire Zone 25-72A - Units 2 &3 3-Completed ZC201221B; ZC201230B ZD301227B; ZD301229B Rcroute 5 cables in Complete 3-Completed 1029B Fire Zone 6-13H ZD3B3952A; ZD301227A, B; Z D3012 29 B, C.

Rcroute ZD301227B Complete 3-Completed 1029B cnd ZD301229B in Fire Zone 6-13J.

Reroute 12 cables in Complete 2-Completed 1029B Fire Zone 28-78H Units 2 &3 3-Completed (Ccble Spreading Room)

R; route 6 cables in Unit 2 design 2-Completed 1029B Fire Zone 29-108 complete. 3-Completed (Mein Control Room) Uni t 3 complete except for circuit switchover.

In3 tall 2 addi- Complete Completed 1029W tional smoke detectors in Fire Zone 50-78A to provide area cove rage.

ROroute SRV/ ADS Unit 2 - 2-EOO (87) 1029B cables to facilitate work on 3-Completed cof e shutdown (linked hold until to 1352G(U2) & 13543G Unit 3 (U3)). work is complete.

Ur.it 3 -

Installation in progress.

Provide control room Uni t 2 - 2-EOO (87) 1029E indication for 6 work on 3 -EOO process variables and hold until 4 cystem diagnos tics Unit 3 Non-outage - Complete for each Fire Area. is complete.

Unit 3 - Design Complet e Installation in progress.

  • Attachmont 1 Page 9 of 14 J anuary, 1986 Expe cted Mod Description Status Completion Dates Mod. No.

ALTERNATIVE SHITFDOWN M0DIFICATIONS Provide new panels to Common & Uni t 3- 2-EOO (87) 1351A be established as the complete.

niternative control stations for the B and D cafeguard channel diesel ge nerato rs .

Establish alternative Common & Uni t 3- 2-EOO (87) 1351A controls and indication complete.

for the B&D saf eguard chennel diesel generators at new panels identi fied above.

Provide alternative Unit 3 work Uni t 3 work 1351A control and indication is complete. complete.

for 4kv circuit breakers 20A1606, 2 A1807, 30A1606, Uni t 2 work and 30 A1807. 2 -EOO (8 7)

Provide alternative status Uni t 3 work Uni t 3 work 1351A indication for 4kv circuit is complete. complete.

breakers 20A1601, 20A1604, 20A1608, 20A1801, 2 0A1802, Uni t 2 wo rk 201 A1803, 20 A1804, 20 A1805, 2 -EOO (8 7) 20A1808, 30A1601, 30A1602, 30 A160 3, 30 A160 4, 30 A160 7, 30 A1608, 30A1609, 30A1801, 30 A1803, 30 A1808 and 30A1809.

Provide alternative bus Uni t 3 work Unit 3 work 1351A voltage indication for 4kv is complete. complete.

bus 20 A16, 20A18, 30 A16, Unit 2 work and 30A18. 2-EOO (87)

Provide a linear heat Design in 6/30/86 1351B dotection system in progress.

the cable trays in fire crea 25.

Provide reroutes of two Complete Completed 1351C circuits required to onsure alternative shutdown capability fo r Unit 3 and conmon plant sys tems.

Attcchmont 1 Page 10 of 14 J anua ry, 1986 Expected Mod Description Status Completion Dates Mod. No.

Provide encapsulation of C omr '.e te Completed 1351C circuits required to ensure alternative shutown

! capability fo r Unit 3 cnd common plant sys tems.

Provide encapsulation and Identification of 2-EOO (87) 1351C roroutes as required to encapsulations and cuppo rt alternative shut- reroutes is in down capability for pro gr es s .

Uni t 2 sys tems.

Provide alternative Uni t 2 .

2-EOO (87) 1351D control and breaker e qui pme nt is o tatus indi cation involved wi th for the 4kv circuit mod. Design br cake r f o r the B in progress.

cafeguard channel ESW Materials pump (20A1603) . o rde red.

Provide a new panel to Uni t 2 work - 2-EOO (87) 1352A catablish an alternative Design started.

control station for the Unit 2 HPCI s ys t em . The n2w panel will also house equipme nt for mods 1352B, 1352C, 1352 D, 135 2G and 1352H.

Ectablish alternative Uni t 2 work - 2-EOO (87) 1352A 4

controls and indication Design started.

for the Uni t 2 HPCI oystem at the panel identi fied above.

E3tablish alternative Uni t 2 work - 2-EOO (87) 1352B diagnos tic instrumenta- Design started.

tion for Uni t 2 citernative shutdown sya tems at the Uni t 2 HPCI ACS.

Provide alternative Unit 2 work - 2-EOO (87) 1352C control and breaker Design started.

Ototus indication for for the 4kv circuit brcaker for the Unit 2 B cafeguard channel RilR pump (20A1602) .

I -

l -

. Attachment 1 Page 11 of 14 j January, 1986 i

i Expected Mod Description Status Completion Dates Mod. No.

s Establish necessary Unit 2 work - 2-EOO (87) 1352C citernative controls and Design started.

indication for the Unit 2B

! RHR valves at the Unit 3  :

HPCI ACS panel provided by i Mod 1352A.

I Provide isolation of Unit 2 work - 2-EOO (87) 1352C j control circuits for Design started.

Uni t 2 RER MO-17 o r l MO-18 valve. that cannot

! be subjected to spurious t i operations. ,

I i Provide alternative Unit 2 work - 2-EOO (87) 1352D ,

control and breaker Design started.

s tatus indication for ths 4kv circuit breaker j fo r the Uni t 2 B saf e-1 guard channel HPSW

! pump (20A1607) . -

i j Establish necessary Uni t 2. work - 2-EOO (87) 1352D

citernative controls and Design started.
indication for the Unit 2B ,

i HPSW valves at the i i Uni t 2 HPCI ACS panel  !

j provided by Mod 1352 A.

Provide alternative Uni t 2 work - 2-EOO (87) 1352E

control and breaker status Design started.

i' indication for Unit 2 4kv emergency circuit breakers 20A1605 and 20A1806 that feed 4kv/480v load centers.

} Provide alternative Uni t 2 work - 2-EOO (87) 1352F i DC power panels & feeds fo r Design started.

} control and motive l power fo r Unit 2 i 4 citernative shutdown i o ys t ems .

l Provide alternative Unit 2 work - 2-EOO (87) 13520 i controls fo r Design started.

1 Unit 2 safety relief valves (S RV's) A, B,  !

& K and nitrogen isolation

i. volves A & B at the Uni t 2 HP CI ACS .

l

, Attcchmont 1 Page 12 of 14 January, 1986 Expected I Mod Description Status Completion Dates Mod. No.

l Provide two alternative Uni t 2 work - 2-EOO (87) 1352G control stations for the Design started.

trcnsfer/ isolation switches needed for alternative control of ADS.

E3tablish Unit 2 Uni t 2 work - 2-EOO (87) 1352H citernative process Design started.

tonitoring ins trumenta-tion at the Unit 2 HPCI ACS.

1 Provide emergency Uni t 2 work - 2-EOO (87) 1352I lighting fo r Unit 2 Design started .

citernative control ototions and routes access and egress fo r th o A CS ' s .

Provide communi:ations Unit 2 work - 2-EOO (87) 1352I between alternative Design started.

control stations.

Provide a new panel Design complete. 3-EOO 1353A to establish an alterna- Mate rials delivered.

tive control station Final checkout for the Unit 3 IIPCI is in progress.

cya tem. The mw panel will also house equipment for mods 1353B, 1353C, 1353D, 1353G and 1353H.

Establish alternative Design complete. 3-EOO 1353A controls and indication Materials delivered.

fo r the Uni t 3 IIPCI Final checkout cystem at the panel is in progress.

idonti fied above.

Provide alternative Design complete. 3-EOO 1353B dicgnos tic instrumenta- Mate rials delivered.

tion for Unit 3 Final checkout citernative shutdown is in progress.

Oys tems at the Unit 3 IIPCI ACS.

Provide alternative Complete Completed 1353C control and breaker a tetus indication for the 4kv circuit breaker for the Unit 3 D saf e-guced channel R!iR pump (30A1802).

~

. Attcchmont 1 Page 13 of 14 January, 1986 Expected Mod Description Status Completion Dates Mod. No.

j Ectablish necessary Design complete. 3 -EOO 1353C controls & indication for Materials delivered.

tho Unit 3D R!iR valves Final checkout et th e U nit 3 HP CI ACS is in progress.

panel provided by Mod 1353A.

Provide isolation of Complete Completed 1353C control circuits fo r Unit 3 RHR valve MO-17 thct cannot be subjected to spurious operations.

Provide alternative Complete Completed 1353D control and breaker otetus indication for the 4kV circuit breaker fo r the Uni t 3, D saf e-gucrd channel IPSW pump

( 30A180 4) .

Establish necessary Design complete. 3-EOO 1353D controls & indication fo r Materials delivered.

tho Unit 3D IPSW valves Final checkout et th e Uni t 3 HP CI ACS is in progress.

panel provided by Mod 1353A.

Provide alternative Complete Completed 1353E control and breaker status indication for Unit 3 4kv emergency circuit becaker 30A1605 and 30A1806 that feed 4kv/480v load centers.

Provide alternative Complete Completed 1353F DC power panel & feeds for control power for Unit 3 alternative chutdown sys tems.

Provide alternative complete Completed 1353G l controis fo r Unit
3 safety relief valves (S RV's ) A, B, and K end nitrogen isolation volves A & D at the Unit 3 IPCI ACS provided by Mod 1353A.

0 '

s'. Attachment 1 Page 14 of 14 t January, 1986 ,

i Expected Mod Description Status Completion Dates Mod. No.

! Provide two alternative Complete completed 1353G

] control stations for the l transfer / isolation switches l necded for alternative l control of ADS. l Establish Unit 3 Design complete. 3-EOO 1353H citernative process Materials available. i nonitoring instrumentation Final checkout  :

ct the Unit 3 HPCI ACS. is in progress. i i Provide emergency Design complete. 2-EOO (87) 1353I d

lighting for Unit 3 Materials ordered.

. alternative control sta-

! tions and ;outes of access  !

l and egr es s fo r the ACS 's .  ;

! This is non-outage work. i

! Provide communications Design in 2-EOO (87) 1353I .

j between alternative progres s .

I control stations. This 10 non-outage work.

l l