Forwards Updated List,Including Revised Completion Dates,Of Activities Initiated Prior to NRR Reorganization.Branch Chiefs in New BWR Organization Identified.Ser Inputs Needed from Reviewers to Support 860307 Fuel Load Date
ML20137K847
Person / Time
Site: Clinton Constellation icon.png
Issue date: 01/17/1986
From: Butler W
Office of Nuclear Reactor Regulation
To: Hulman G, Lainas G, Liaw B
Office of Nuclear Reactor Regulation
References
NUDOCS 8601240242
Download: ML20137K847 (4)


Text

-

"n.1' 1 7 1986 5(j>

l! Gl.

!!EMORANDUM FOR: Those on Attached List FR0ft:

Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing

SUBJECT:

CLItiTON POWER STATION: COMPLETION OF LICEhSING ACTIVITIES IllITIATED PRIOR TO NRR REORGANIZATION - REVISION 1 The cnclosure, which you previously received by memorandum dated January 3, 1986, has been updated to include revised completion dates.

In addition, the Branch Chiefs in the new BWR organization to whom the revicwers under the old organiza-tion are required to provide SER inputs have been identified.

Please note that the SER inputs from the reviewers identified in the enclosure are needed to support a March 7, 1986 fuel load date.

If you have any questions, contact the Clinton Licensing Project Manager Byron Siegel (x28344).

Copies of this memorandum are also Leing sent to the current supervisors of the Clinton reviewers to assure they are aware of the continuing cornitments some of their staff have in support of the Clinton project.

0 !f nd P mi by Walter R. Butler, Director BWR Project Directorate No. 4 Division of BUR Licensing

Enclosure:

As stated DISTRIBUTION (Docket. File; SWest NRC'PDR hWagner Local PDR PHearns PDf4 Reading AMasciantonio BSiegel LRuth EHylton Alee RKendall JLonbardo JLazevnick RPichumani Allotafrancesco JLEE AGarg RLi DYue RKirkwood KParczenski Weinke CPtan DTerao 8601240242 S(.0177 PDR ADOCK 05000461 E

PDR PDirhf PD#4/D BS,ie'g'el :l b WButler g

01/jp'/86 01/g /06

1 rau 8

UNITED STATES 8

NUCLEAR REGULATORY COMMISSION o

j wAsHincrow o.c.2osss e

JAN 17 1986 MEMORANDUM FOR: Those on Attached List FROM:

Walter R. Butlar, Director BWR Project Diiectorate No. 4 Division of BWR Licensing

SUBJECT:

CLINTON POWER STATION: COMPLETION OF LICENSING ACTIVITIES INITIATED PRIOR TO NRR REORGANIZATION - REVISION 1 The enclosure, which you previously received by memorandum dated January 3,1986, has been updated to include revised completion dates.

In addition, the Branch Chiefs in the new BWR organization to whom the reviewers under the old organiza-tion are required to provide SER inputs have been identified.

Please note that the SER inputs from the reviewers identified in the enclosure are needed to support a March 7, 1986 fuel load date.

If you have any questions, contact the Clinton Licensing Project Manager Byron Siegel (x28344).

Copies of this memorandum are also being sent to the current supervisors of the Clinton reviewers to assure they are aware of the continuing connitments some of their staff have in support of the Clinton project.

Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing

Enclosure:

As stated f

e e

Addressees - Memorandum dated JAff 1 7 1986 G. Lainas. Assistant Director for Technical Support, DBL B. D. Liaw, Chief Engineering Branch, DBL G. Hulman, Chief Plant Systems Branch, DBL M. Srinivasan, Chief Electrical, Instrumentation & Control Systems Brar.ch, DBL L. Phillips, Acting Chief Reactor Systems Branch, DBL D. Vassallo, Chief Facility Operatior.s Branch, DBL

0. Pcrr, Chief Electrical, Instrumentation and Control Systems Branch, DPWR-B F. Rosa, Chief Electrical Instrumentation and Control Systems Branch, DPWR-A J. Milhoan, Chief Plant Systems Branch, PWR-T, M. Williams, Chief Technical Assistance Management Branch W. Johnston, Chief Engineering Branch, PWR-B R. Bosnak, Chief Engineering Issues Branch, DSR0 O

o e

5 LICENSING ACTIVITIES IMITIATED PRIOR TO NRR REORGANIZATION REVIEWERS CLINTON SER OR MAN HRS REQ'D COWL.

8WR ORGAP.IZATION hAME SSER SECTION SL'SJECT 5 COMPLETE TO COMPL.

DATE 8R CHIEF / SECT LDR R. Ke'ndall Coupliancewith10CFR50.62(ATWS) 5 7

2/15/86 Srinivasan SSER 2-7.2.3.3 Self Test System 90 8

2/15/86 SER 7.4.3.1 Remote Shutdown. Compliance GOC 19 70 15 2/15/86 SER 7.7.3.1 Control Systems Failures From HELS 5

60 2/15/86 SSER 2-7.3.3.7 Design Changes to 80P Valves for LOCA 85 2

2/15/86 SER 15.2.187.2.3.1 ATWS Recirculation Pump Trip 95 2

2/15/86 J. Lazevnick CAT Inspection - Cable Separation 85 32 1/31/86 Srinivasan Issues Resulting From Site Review 20 30 Change in Scope in Voltage Verification Test 85 30 1/31/86 A. Notafrancesco SER 6.2.7 H Control - Preliminary Analysis Review 40 100 1/31/86 Hulman/Kudrick 2

A. Garg (Total) 1/31/86 D. Yue 1/15/86 K. Parczenski 1/15/86 C. Tan 1/15/86

5. West SER 9.5.1.4 Auto. Fire Detection in Safety Related Areas 85 20 1/31/86 SER 9.5.1 Safe Shutdown Anal / Fire Protection Eval. Rpt 75 120 1/31/06 Use of Other Than Rigid Steel Conducts 50 5

1/15/86 N. Wagner SER 3.6.1 HEL8/MELS Flooding 60 10 1/31/86 Hulman/Campe SER 3.6.1 MEL8 Contairment Spray 60 10 1/31/86 CAT Inspection - Floor Grating 25 30 1/31/86 P. Hearns SER 3.6.1 Analysis of Piping Failures Outside Contairment to 1/31/96 Hulman/Campe A. Masciantonio SER 3.11 Equipment Qualification of Elect 8 Mechanical Equip.95 40 Liaw/LaGrange L. Ruth SER 6.2.1.8 Suppression Pool Hydrodynamic Loads 9G 16 1/31/86 Hulman/Kudrick SER 6.2.1.9 Humphrey Containment Issues 90 16 1/31/86 A. Lee SER 3.10 SQRT 90 16 1/31/86 Hulman/LaGrange SSER 1-22

. Equipment Seismic Assessment Progree 60 30 1/31/86 J. Lombardo SER 3.10 PVORT 85 60 1/31/86 Hulman/LaGrange R. Pichumani SER 3.6.2 Jet Impingement & Pipe Rupture Analysis 80 60 1/15/86 Vassallo SER 3.9.2 Review Results of Testing Program (Vibr.,

Thermal. Dynamic) 0 W. Meinke 00CM 85 10 1/31/86 Hulman/Campe J. Lee Review Revised FSAR Section 11.4 10 80 2/15/86 Hulman/LaGrange SER 11.4.1 PCPandComplianceProgram(10CFR61) 10 80 2/15/86 SER 12.3.1 Provide Initial Leak Rate Test Results 0

R. Li SER 3.9.6 & 5.2.4 IST 0

2/15/86 Hulman/LaGrange D. Terao SSER 1-22 Equipment ';etsmic Assessment Program 0

40 1/31/86 Liaw C. P. Tan SSER 6.2.1.8 Survey Grand Gulf Inplant Tests of SRV's 90 1/15/86 Liaw/Hazelton

  • 30 Days from Receipt of Information from Applicant