ML20137K879

From kanterella
Jump to navigation Jump to search

Application for Amend to Licenses NPF-9 & NPF-17,authorizing Use of Exemptions Re Type Band C Tests.Proposed Changes to Tech Specs,Justification,Safety Analyses & 850924 Request for Exemption Encl.Fee Paid
ML20137K879
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 01/21/1986
From: Tucker H
DUKE POWER CO.
To: Harold Denton, Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML20137K881 List:
References
TAC-59796, TAC-59797, TAC-60601, TAC-60602, NUDOCS 8601240262
Download: ML20137K879 (3)


Text

Dam POWER COMMY l'.O. HOX WlillO CHAltLOTTE. N.C. 215242 IIAL B. TCCKER trtrenowe po4) a n>4 m3 anua

==un-January 21, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Attention:

Mr. B.J. Youngblood PRR Directorate No. 4

Subject:

McGuire Nuclear Station Docket Nos. 50-369 and 50-370 Technical Specification Amendment for Containment Penetration Leakage Testing

Dear Mr. Denton:

Attached are proposed license amendments to Facility Operating Licenses NPF-9 and NPF-17 for McGuire Nuclear Station Units 1 and 2, respectively.

The proposed change would allow the utilization of (NRC approved) exemp-tions to 10 CFR 50, Appendix J relating to type Band C tests.

The change itself is administrative in nature and does not constitute an exemption request.

Attachment I contains the proposed changes to the Technical Specifications; contains a Justification and Safety Analyses in support of the proposed change; Attachment 3 provides a determination that the proposed changes would not involve any significant hazards consideration as defined by 10 CFR 50.92.

This request involves one application for amendment to McGuire's Technical Specifications. Accordingly, pursuant to 10 CFR 170.21, a check for $150.00 is enclosed.

Please review and approve by March 3, 1986 to support the current test cycle. Duke Power presently has a Request for Exemption from 10 CFR 50 Appendix J Requirement pending. A copy of this request is attached (Attachment 4) to this proposal for informational purposes.

Please feel free to contact us if you require any additional information.

Very truly yours, C

set b Q

~

Hal B. Tucker 8*

[

N l

Attachments sff gr,afd39Y 8601240262 860121 PDR ADOCK 05000369 p

PDR

Harold R. Denton January 21, 1986 Page 2 Dr. J. Nelson Grace, Regional Administrator xc:

U.S. Nuclear Regulatory Coc: mission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30323 Mr. W.T. Orders Senior Resident Inspector McGuire Nuclear Station Mr. Dayne Brown, Chief Radiation Protection Branch Division of Facility Services Department of Human Resources P.O. Box 12200 Raleigh, North Carolina I

1 l

l l

i

Harold R. Denton January 21, 1986 Page 3 i

I t

I T

l I

HAL B. TUCKER being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the.part of said Company to sign and file with the Nuclear Regulatory Commission this revision to the McGuire t

Nuclear Station License Nos. NPF-9 and NPF-17 and that all state =ents and l

matters set forth therein are true and correct to the best of his knowledge.

I I

l 8M

/

Hal B. Tucker Vice President 1

Subscribed and sworn to before me this 21st day of January, 1986

(~

A? I

' YAA 0cm l M atary Public' / '/

s11111.* t9 i

e ~jkzqf.t.b.!!.$y,'p.

.s,1 tw-E J ;;. 0 T n 1

My Commission Expires:

n 2

p.

~

,.3

,1,..,

.J-3 e ', * (7 p (1C /.$

% Y **.

' *E

s,

%;.b

/, p) 79

'...... C t...... '

j o

i 4

4 L

b r

4

__~

-,.. ~ _, _ _ - ~.

.,m.

,_.m-.