Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20136F378 + (ML20136F378)
- ML20136F380 + (ML20136F380)
- ML20136F381 + (ML20136F381)
- ML20136F383 + (ML20136F383)
- ML20136F384 + (ML20136F384)
- ML20136F387 + (ML20136F387)
- ML20136F389 + (ML20136F389)
- ML20136F391 + (ML20136F391)
- ML20136F392 + (ML20136F392)
- ML20136F393 + (ML20136F393)
- ML20136F394 + (ML20136F394)
- ML20136F396 + (ML20136F396)
- ML20136F399 + (ML20136F399)
- ML20136F401 + (ML20136F401)
- ML20136F403 + (ML20136F403)
- ML20136F404 + (ML20136F404)
- IR 05000267/1985024 + (ML20136F406)
- ML20136F406 + (ML20136F406)
- ML20136F409 + (ML20136F409)
- ML20136F411 + (ML20136F411)
- 05000336/LER-1997-005, Forwards LER 97-005-00 Which Documents Event That Occurred at Mnps,Unit 2 on 970204.Commitments Made,Listed + (ML20136F413)
- IR 05000320/2010031 + (ML20136F414)
- ML20136F417 + (ML20136F417)
- ML20136F418 + (ML20136F418)
- 05000482/LER-1997-004, :on 970206,failed to Accurately Perform Containment Integrated Lrt.Caused by Incorrect start-up Procedure.Revised Applicable Procedures & Performed Required Lrt + (ML20136F420)
- ML20136F421 + (ML20136F421)
- 05000336/LER-1997-005-02, :on 970204,inservice Test Instrumentation Did Not Meet Ansi/Asme Chapter XI Requirements.Caused by Inadequate Administrative Structure for IST Program. Procedure to Administer IST Program Was Implemented + (ML20136F422)
- ML20136F423 + (ML20136F423)
- ML20136F426 + (ML20136F426)
- ML20136F429 + (ML20136F429)
- ML20136F430 + (ML20136F430)
- ML20136F434 + (ML20136F434)
- ML20136F436 + (ML20136F436)
- IR 05000278/1985041 + (ML20136F438)
- ML20136F440 + (ML20136F440)
- ML20136F441 + (ML20136F441)
- ML20136F444 + (ML20136F444)
- ML20136F445 + (ML20136F445)
- ML20136F448 + (ML20136F448)
- JAFP-97-0085, Responds to NRC Re Violations Noted in Insp Rept 50-333/96-08.Corrective Actions:Operating Procedures OP-13 & OP-13B Have Been Revised to Include Precaution Statements Re Potential for Water Hammer & Equipment Damage + (ML20136F449)
- ML20136F450 + (ML20136F450)
- 05000423/LER-1997-016, :on 970206,piping Supports for Portions of RHR Sys in Condition Inconsistent W/Design Installation Details.Caused by Improper Installation of Spacer During Initial Const Activities.Restored Piping Supports + (ML20136F454)
- ML20136F458 + (ML20136F458)
- ML20136F459 + (ML20136F459)
- ML20136F463 + (ML20136F463)
- ML20136F465 + (ML20136F465)
- IR 05000443/1985031 + (ML20136F466)
- ML20136F467 + (ML20136F467)
- 05000423/LER-1997-018, :on 970208,determined Plant Operated in Conditions Prohibited by 3 Different Ts.Caused by Interpreting TS for Intent Rather than Compliance W/Spec.Ts &/Or Bases Will Be Revised + (ML20136F468)
- ML20136F469 + (ML20136F469)
- ML20136F471 + (ML20136F471)