Text
.-
- peg'o, UNITED STATES
[
Te i
NUCLEAR REGULATORY COMMISSION 3
, p' &, JQ.l s
wAswiNGToN. o. c. 20sss NOV-6W MEMORANDUM FOR: Darrell G. Eisenhut, Director Division of Licensing FROM:
Vincent S. Noonan, Project Director Comanche Peak Technical Review Team
SUBJECT:
COMANCHE PEAK PROJECT STATUS Three weeks have pas' sed since I assumed responsibility for directing the regulatory activities relating to Comanche Peak. This memo summarizes recent major accomplishments., the status of significant issues, major activities being planned, and potential problem areas. A detailed schedule update of all Comanche Peak Action Items is being provided separately.
I.
Recent Accomplishments Reorganized the assignments of individuals associated with the project and added several individuals to the staff. The attached chart (Enclosure 1) summarizes the organization and assignments.
One additional staff member is still being sought to help with SSER effort.
Met with Applicants on October 19, 23, 1984 to discuss Applicants' Program Plan for Civil Electrical and Test Program issues.
Staff comments on plan are being prepared.
Requested that ASLB postpone additional hearings until TRT effort complete.
(Status re 10/19/84 and Motion for Postponement of Hearing of 10/23/84.)portof ASLB plans to hold hearings on 0. B. Cannon (Lipinsky Report) on 11/19 and Fuel Pool Liner Weld Travelers on 11/26.
Filed Staff Response to TUEC 50.57(c) Motion on November 2,1984.
Met with Regional Administrator and senior Region IV staff, toured facility and met with resident inspection staff (10/25-26/84).
Met with J. Ellis (CASE) on 10/2S/84 and S. Garde (GAP) on 11/1/84.
Additional meetings planned with J. Ellis on 11/7/84 (allegations feedback) and B. Garde on 11/8/84 (identify potential allegations).
II. Status of Sionificant Issues Alleger feedback effort for Civil / Electrical and Test Program areas is about one half complete. Various difficulties in locating individuals, individuals failing to show up for appointments, etc.
> sumarizes alleger feedback e
Darrell G. Eiserhut 2
NOV 6 1984 Civ'41/ Electrical / Test Program SSER development being affected by allegations feedback effort and discovery of omissions in several writeups.
Issue date is expected to be 11/20/84.
Coatings and paint debris evaluation awaiting applicant response and then still require short turnaround of NRR staff evaluation.
Results of staff position on coatings and integration of TRT effort dependent on this review, scheduled for completion 11/15/84.
Staff review of Cygna Reports are back in progross, with completion expected in late December. Phase 4 review expected after Cygna-makes additional submittal.
Developing ASLB " Panel" to respond to QA and intimidation issues.
Mechanical, Coatings and QA SSER' development going slower than anticipated.
Significant rewriting and editing effort is necessary.
Region IV inspection effort appears to be caught uu with facility completion.
Region about to issue first inspectica status letter pursuant to IE MC 94300.
III. Major Activities Planned Meetings with many of available allegers in Mechanical, Coatings, and QA areas during week of 11/12/84.
QA issues briefing to DL management on 11/20/84.
Meet with Applicants to present initial TRT findings in Coatings and Miscellaneous areas on 11/21/84.
Meet with Applicants to present initial TRT findings in Mechanical and QA areas on 12/6/84.
Continue efforts to meet with allegers, provide feedback and conduct reassessment, and update SSERs as required based on results of feedback interviews.
IV. potential Problem Areas Magnitude of staff effort to complete technical reviews, allegations closecut, and support hearings is greater than anticipated.
individuals associated with Comanche Peak have been and continu Most work overtime.
Alleger feedback interv'iews are revealing gaps in portions of some SSER writeups. Additional TRT effort will be needed. The amount of this effort is unknown, but could be significant.
Mmp G
Darrell G. Eisenhut 3
NOV 6 1934 Locating allegers, conducting face-to-face interviews, etc. involve trips to various parts of U.S., consume a significant amount of time, and require extensive coordination.
Staff review of IE Motions for Summary Disposition (Walsh/Doyle) is scheduled for completion in December, but may be impacted by resource limitations.
Eight OI investigations are in progress. The impact of this effort is still unknown. A major OI report, dealing with document control center issues, has not been issued.
Typing and secretarial support remains a challenge, and will continue to be so as we get closer to completing the SSER. -
t I will be available to discuss this memorandum at your convenience.
/ El
/
/
/*
Vi
.- n agram Director nche Pe chn' cal Review Team Division c Licensing cc:
J. Scinto E. Case R. Martin, RIV T. Novak E. Hayes, OI
~
h t
ll
.I l
4 fA 1
A kict NE ve s f Sil e oSCET l
I s
g g
C o
n r
C i
t P
R a
EAo S
T QC gR nE aS TS l8 l
.T eRh c C. T R
fEcs fS ei R -
aSMM e
S - - -
ro o
n t
8 n
i r e
l o v
l os
~
)
e i
pi T
L
~
o
.A l
pv P
y I d.
(
.A_
Tf_
i Q
)
- o D
l
)
a
/
T y
e sPt rah n
m e(t ens s
i i
e y T gl
~
u
.t r gh ya n
i n anc
.CW es
~
k w si2 t as D - -
~
om/
eti ce Pd1 rSF ahs rt g
.A(
c e..
Ct n T
~
C SAP cai C
~
MMt E
d n
J ena
.a
~
o yeal O
~
s CPC 1
R wfrt r.
si gc e
P e
nr nh roem d.
r K
ao agerpa a
u A
nt d u gP si g r
uae e.
s E
oc ZH1kl o
,o 6
L u
o P
oe 1 cer p
h Nr
~
4 l
_l
.AaRP c
E I
RR i
u o
.c JC b
n H
.D R
e E
C V
,N G
a!
r o
SM N
so A
ed h
M irn S
O
~t aa
).
o)
C uim d.
ne g
pl s o
am6 L
,n egs o
fi#
Ji el Dae l
et GW b,t R
v g
2E
.i S./S n
DC JR o
J( -
u 1S Y
o lv a.
J s
s g
s Cc 1
r e
n n
0 o
8
.i o
.l JE t
n t r i
f uw isa)t d1 o I
ti ecc E1 r t sH(A 0B es/7 A
o,iAD5.I h..
N V
L cWK ME0O gg o e
h
.P05F i
mr T
c A - - - -
f P n
a e
r Kt B
s
. e g
RT n
i sne l
e s
t c
l c
r e '. a '- e,
r i
a L
v fRw g
(y r rR e n
u eNi a.
B t
v Mnoe B c s
.PI tR
.i S - -
{
1 h!
Enciesure 2 ALLEGER FEEDBACK EFFORT Electrical Civil Test Total Allegations 53 56 19 Allegers to Contact 13 11 3
~
"Near" Site 6
5 2
Away from Site (or unknown) 7 6
1 Allegers' Contacted:
9 6
2' Personal Interview 1
0 Telephone Interview 3
Failed to Keep Appt.
3 Didn't want Interview 1
1 Telephone Interview Scheduled Personal Interview Scheduled 4
2 2
Allegers Not Located 3
4 Allegers Not Contacted yet 1
1 1
Allegers Requiring Followup 2
Allegers Requiring No Followup 1
- Includes 4 individuals from "T-Shirt" event, NOTE: Some allegers common to more than one area.
-~,