ML20136F450

From kanterella
Jump to navigation Jump to search
Advises of Change to Commitment Made in Response to Noncompliance Noted in Insp Rept 50-341/85-21.Completion of Update to Plant Drawings Associated W/Engineering Design Package 1996 Delayed Until 860228
ML20136F450
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/27/1985
From:
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20136F426 List:
References
VP-85-0227, VP-85-227, NUDOCS 8601070382
Download: ML20136F450 (1)


Text

c , # -

, *,. _ V * - yg g*

axina,oper or. .

. Forms-2 N Iso BE E"p!',*V.,

November 27, 1985 VP-85-0227 Mr. James G. Keppler

. Regional Administrator

-Region III'

.U..S.-Nuclear Regulatory Commission 799 Roosevelt. Road Glen Ellyn,' Illinois 60137

Dear.Mr.'Keppler:

Reference:

(1) Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43 (2) Letter, W.H. Jens to J.G. Keppler

' June 19, 1985, NE-85-0396 1

Subject:

Amended _ Detroit Edison Response Insoection Report 50-341/85021 The purposelof this letter is to. inform you of change to a

~

commitment Detroit Edison made in response to an item of noncompliance contained in Inspection Report No.

i 50-341/85021.

In the response to item 85021-01 (Reference 2), Detroit Edison committed to update plant drawings associated with Engineering Design Package (EDP) 1996 after completion'of the EDP. The drawings were to be updated by November 30,

.1985.

Currently, EDP-1996 is scheduled to be as-built complete

.before' reactor'startup. Updating of plant drawings will

' follow.in accordance with procedure. This activity is scheduled to be completed by' February 28, 1986.

If you have any questions regarding this matter, please contact Mr. Joseph E. Conen, (313) 586-5083.

Sincerely,

-l [ ,Jh cc: P..M. Byron G. C. Wright USNRC Document Control-Desk l Washington, D.C. 20555 8601070382 851231

^ " 9 E*

I

. $" DEC 4 1985 b