November 27, 1985 VP-85-0227 Mr. James G. Keppler
. Regional Administrator
-Region III'
.U..S.-Nuclear Regulatory Commission 799 Roosevelt. Road Glen Ellyn,' Illinois 60137
Dear.Mr.'Keppler:
Reference:
(1)
Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43 (2)
Letter, W.H. Jens to J.G. Keppler
' June 19, 1985, NE-85-0396 1
Subject:
Amended _ Detroit Edison Response Insoection Report 50-341/85021 The purposelof this letter is to. inform you of change to a commitment Detroit Edison made in response to an item of
~
noncompliance contained in Inspection Report No.
50-341/85021.
i In the response to item 85021-01 (Reference 2), Detroit Edison committed to update plant drawings associated with Engineering Design Package (EDP) 1996 after completion'of the EDP.
The drawings were to be updated by November 30,
.1985.
Currently, EDP-1996 is scheduled to be as-built complete
.before' reactor'startup.
Updating of plant drawings will
' follow.in accordance with procedure.
This activity is scheduled to be completed by' February 28, 1986.
If you have any questions regarding this matter, please contact Mr. Joseph E. Conen, (313) 586-5083.