ML20136F430
| ML20136F430 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 12/31/1985 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20136F434 | List: |
| References | |
| NUDOCS 8601070375 | |
| Download: ML20136F430 (2) | |
See also: IR 05000278/1985041
Text
L
l
'
- r
a
DEC 31 1985
Docket Nos. 50-278/DPR-56
Philadelphia Electric Company
ATTN: Mr. S. L. Daltroff
.Vice President
Electric Production
2301 Market Street
-Philadelphia, Pennsylvania 191C1
Gentlemen:
Subject:
Inspection 50-278/85-41
This transmits the findings of the routine safety inspection and an operational
readiness assessment team inspection by Messrs. J. H. Williams, T. P. Johnson,
J. P. Rogers, H. I. Gregg, and J. E. Beall on October 26 - December 6, 1985, at
the Peach Bottom Atomic Power Station, Unit 3, Delta, Pennsylvania. These
,
findings were based on observation of activities, interviews, measurements and
document reviews, and have been discussed with Mr. R. S. Fleischmann of your
staff.
Areas examined during this '.nspection are described in the NRC Region I Inspec-
tion Report which is enclosed with this letter. The purpose of this inspection
was to verify the establishment and implementation of programs to restore the
Unit 3 to its design configuration following extensive inspections and modifi-
cations, and to revise reactor operating information accordingly. Overall, we
have concluded that, when planned testing and closeout activities are completed,
when the RHR pumps are repaired and tested satisfactorily, when an acceptable
engineering evaluation is performed on snubbers, Peach Bottom Unit 3 can be
safely returned to power operation.
A copy of this letter and the enclosures are being placed in the NRC Public
Document Room.
Within the scope of this inspection, no violations were observed.
No reply
to this letter is required. .Your cooperation with us is appreciated.
Sincerely,
8601070375 851231
-
Samuel J. Collins, Chief,
ADOCK 05000278
Projects Branch 2, Division
O
of Reactor Projects
Enclosure:
NRC Region I Inspection Report No. 50-278/85-41
,
0,
5\\
o
,
.-
..
E me
1
.
Philadelphia Electric Company
2
DEC 31 1985
cc w/ enc 1:
R. S. Fleischmann, Manager, Peach Bottom Atomic Power Station
John S. Kemper, Vice President, Engineering and Research
W. H. Hirst, Director, Joint Generation Projects Department, Atlantic
Electric
Troy B. Conner, Jr., Esquire (Without Report)
Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)
Raymond L. Hovis, Esquire (Without Report)
Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)
W. M. Alden, Engineer in Charge, Licensing Section
Public Document Room'(PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
-
NRC Resident Inspector
Commonwealth of Pennsylvania
bec w/encls:
Region I Docket Room (with concurrences)
Senior Operations Assistant (w/o encis)
R. Gallo, DRP Section Chief
J..Wiggins, DRS
9. Geert , MAR LPM , BWR Lac.,Tqed 'be.* 1
RhRI
DR
y/jd/ms
D
D
hs
TJ5Bifton
R
o
ins
JWil
N
12/ 9 85
12/9 85
12
85
12/9 /85
0FFICIAL RECORD COPY
IR PB3 85-41 - 0002.0.0
12/26/85