Forwards Safety Insp & Operational Readiness Assessment Team Insp 50-278/85-41 on 851026-1206.No Violation Noted.Insp Conducted to Verify Establishment & Implementation of Programs to Restore Facility to Design Configuration
ML20136F430
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 12/31/1985
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20136F434 List:
References
NUDOCS 8601070375
Download: ML20136F430 (2)


See also: IR 05000278/1985041

Text

L

l

'

r

a

DEC 31 1985

Docket Nos. 50-278/DPR-56

Philadelphia Electric Company

ATTN: Mr. S. L. Daltroff

.Vice President

Electric Production

2301 Market Street

-Philadelphia, Pennsylvania 191C1

Gentlemen:

Subject:

Inspection 50-278/85-41

This transmits the findings of the routine safety inspection and an operational

readiness assessment team inspection by Messrs. J. H. Williams, T. P. Johnson,

J. P. Rogers, H. I. Gregg, and J. E. Beall on October 26 - December 6, 1985, at

the Peach Bottom Atomic Power Station, Unit 3, Delta, Pennsylvania. These

,

findings were based on observation of activities, interviews, measurements and

document reviews, and have been discussed with Mr. R. S. Fleischmann of your

staff.

Areas examined during this '.nspection are described in the NRC Region I Inspec-

tion Report which is enclosed with this letter. The purpose of this inspection

was to verify the establishment and implementation of programs to restore the

Unit 3 to its design configuration following extensive inspections and modifi-

cations, and to revise reactor operating information accordingly. Overall, we

have concluded that, when planned testing and closeout activities are completed,

when the RHR pumps are repaired and tested satisfactorily, when an acceptable

engineering evaluation is performed on snubbers, Peach Bottom Unit 3 can be

safely returned to power operation.

A copy of this letter and the enclosures are being placed in the NRC Public

Document Room.

Within the scope of this inspection, no violations were observed.

No reply

to this letter is required. .Your cooperation with us is appreciated.

Sincerely,

8601070375 851231

-

Samuel J. Collins, Chief,

PDR

ADOCK 05000278

Projects Branch 2, Division

O

PDR

of Reactor Projects

Enclosure:

NRC Region I Inspection Report No. 50-278/85-41

,

0,

5\\

o

,

.-

..

E me

1

.

Philadelphia Electric Company

2

DEC 31 1985

cc w/ enc 1:

R. S. Fleischmann, Manager, Peach Bottom Atomic Power Station

John S. Kemper, Vice President, Engineering and Research

W. H. Hirst, Director, Joint Generation Projects Department, Atlantic

Electric

Troy B. Conner, Jr., Esquire (Without Report)

Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire (Without Report)

Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)

W. M. Alden, Engineer in Charge, Licensing Section

Public Document Room'(PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

-

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/encls:

Region I Docket Room (with concurrences)

Senior Operations Assistant (w/o encis)

R. Gallo, DRP Section Chief

J..Wiggins, DRS

9. Geert , MAR LPM , BWR Lac.,Tqed 'be.* 1

RhRI

DR

y/jd/ms

D

D

hs

TJ5Bifton

R

o

ins

JWil

N

12/ 9 85

12/9 85

12

85

12/9 /85

0FFICIAL RECORD COPY

IR PB3 85-41 - 0002.0.0

12/26/85