Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20135E838 + (ML20135E838)
- ML20135E839 + (ML20135E839)
- 05000423/LER-1996-045, Forwards LER 96-045-00,documenting Condition That Was Determined at Millstone Unit 3 on 961107.LER Submitted Pursuant to 10CFR 50.73(a)(2)(ii).Commitments Encl + (ML20135E840)
- ML20135E841 + (ML20135E841)
- ML20135E842 + (ML20135E842)
- ML20135E843 + (ML20135E843)
- IR 05000731/2008005 + (ML20135E844)
- ML20135E845 + (ML20135E845)
- ML20135E848 + (ML20135E848)
- AECM-85-0273, Responds to NRC Re Violations Noted in Insp Rept 50-416/85-22.Corrective Actions:Maint Work Order E53832 Issued to Replace Damaged Latch Bolt Retaining Screws on Secondary Containment Door 1A318 + (ML20135E849)
- ML20135E851 + (ML20135E851)
- IR 05000320/1985015 + (ML20135E852)
- ML20135E854 + (ML20135E854)
- ML20135E855 + (ML20135E855)
- 05000423/LER-1996-045-01, :on 961107,electrical Separation Design Conflict with FSAR Identified.Caused by Breakdown in FSAR Revision Process.Design Basis Will Be Revised to Identify Deviations from Reg Guide 1.75,Position C.6 + (ML20135E856)
- ML20135E857 + (ML20135E857)
- ST-HL-AE-5525, Provides Response to RAI Re SG Replacement.Specification 4R129NS1014,Rev a Encl + (ML20135E859)
- ML20135E860 + (ML20135E860)
- ML20135E861 + (ML20135E861)
- ML20135E862 + (ML20135E862)
- ML20135E863 + (ML20135E863)
- PNO-IV-85-047, on 850913,during Shutdown for Replacement of Seals on Two Reactor Contact Pumps,Main Steam Isolation Actuated.Caused by Personnel Error.Unit Will Be Shut Down for Approx 1 Wk.Press Release Will Be Issued by Licensee + (ML20135E865)
- ML20135E866 + (ML20135E866)
- ML20135E867 + (ML20135E867)
- ML20135E868 + (ML20135E868)
- ML20135E870 + (ML20135E870)
- ML20135E871 + (ML20135E871)
- ML20135E872 + (ML20135E872)
- ML20135E873 + (ML20135E873)
- ML20135E879 + (ML20135E879)
- ML20135E881 + (ML20135E881)
- ML20135E884 + (ML20135E884)
- GO2-96-236, Forwards Rev 33 to WNP-2 Physical Security Plan.Encl Withheld + (ML20135E887)
- ML20135E889 + (ML20135E889)
- PNO-I-96-088, on 961211,shipment Containing 64-Ci Ir-192 Radiography Source Missing in Transit.Licensee Will Continue Efforts to Locate Package Through Canadian Ofc.Region I Public Affairs Prepared to Respond to Media Inquiries + (ML20135E892)
- 05000413/LER-1985-049-01, :on 850807,inadvertent Isolation of Both Discharge Headers of Fire Protection (Ry) Pumps Occurred. Caused by Personnel Error.Correct Ry Header Isolated. Procedure 2-18 Revised + (ML20135E896)
- ML20135E900 + (ML20135E900)
- IA-96-354, Second Final Response to FOIA Request for Documents. Documents Listed in App D Partially Withheld (Ref FOIA Exemption 4) + (ML20135E900)
- ML20135E903 + (ML20135E903)
- ML20135E904 + (ML20135E904)
- ML20135E905 + (ML20135E905)
- ML20135E906 + (ML20135E906)
- NUREG-0908, Ack Receipt of 961030 Amend 41 to Physical Security Plan. Eleven Changes Did Not Meet Criteria of 10CFR50.54(p),two Changes Did Not Follow Acceptance Criteria of NUREG-0908 & 37 Changes Require Clarification + (ML20135E908)
- ML20135E909 + (ML20135E909)
- ML20135E910 + (ML20135E910)
- ML20135E911 + (ML20135E911)
- ML20135E912 + (ML20135E912)
- ML20135E913 + (ML20135E913)
- ML20135E919 + (ML20135E919)
- ML20135E922 + (ML20135E922)
- ML20135E923 + (ML20135E923)