Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133B559 + (ML20133B559)
- ML20133B561 + (ML20133B561)
- ML20133B562 + (ML20133B562)
- ML20133B563 + (ML20133B563)
- ML20133B564 + (ML20133B564)
- ML20133B565 + (ML20133B565)
- ML20133B566 + (ML20133B566)
- ML20133B567 + (ML20133B567)
- ML20133B568 + (ML20133B568)
- ML20133B569 + (ML20133B569)
- ML20133B570 + (ML20133B570)
- ML20133B571 + (ML20133B571)
- ML20133B572 + (ML20133B572)
- ML20133B573 + (ML20133B573)
- ML20133B575 + (ML20133B575)
- IA-85-271, Responds to FOIA Request for Records Since Jan 1985, Evidencing Request by Individual or Group of Work Stoppage, Licensing Investigation or Other Related Investigation of Plant.Je Putenney 850128 Ltr Encl + (ML20133B579)
- ML20133B579 + (ML20133B579)
- ML20133B580 + (ML20133B580)
- 05000482/LER-1985-064, :on 850902,reactor Trip,Turbine Trip,Steam Generator Blowdown & Sample Isolation,Feedwater Isolation & Auxiliary Feedwater Actuation Occurred as Result of lo-lo Water Level in Steam Generator 2 + (ML20133B581)
- ML20133B584 + (ML20133B584)
- ML20133B585 + (ML20133B585)
- ML20133B589 + (ML20133B589)
- 05000245/LER-1996-046-02, Forwards LER 96-046-02.Util Commits to Modify Procedure for Performing Local Leak Rate Test on Vacuum Breaker to Include Testing of Shaft Packing & Stuffing Box + (ML20133B591)
- ML20133B592 + (ML20133B592)
- ML20133B593 + (ML20133B593)
- ML20133B595 + (ML20133B595)
- ML20133B596 + (ML20133B596)
- ML20133B598 + (ML20133B598)
- ML20133B602 + (ML20133B602)
- AECM-84-0192, Clarifies Response to Question Written in Transcript of Commission 840320 Briefing Re Development of Tech Specs. Util Comparing Tech Specs to Fsar,Ser & Present Version of STS + (ML20133B604)
- ML20133B606 + (ML20133B606)
- ML20133B608 + (ML20133B608)
- ML20133B610 + (ML20133B610)
- ML20133B611 + (ML20133B611)
- 05000528/LER-1985-065, :on 850829,moisture Buildup in Sample Line from Gaseous Radwaste Surge Tank to Associated Sample Point Prevented Sampling of Tank.Caused by Design Problem.Design Mod Will Be Installed + (ML20133B612)
- ML20133B614 + (ML20133B614)
- ML20133B615 + (ML20133B615)
- ML20133B616 + (ML20133B616)
- ML20133B619 + (ML20133B619)
- 05000293/LER-1985-026, :on 850830,during QA Audit of Operations, Failure to Perform Instrument Check of 28-volt Control Rod Position Indicating Lights Indicated.Caused by Inadequate Surveillance Procedure.Procedure Modified + (ML20133B620)
- IR 05000530/2007001 + (ML20133B621)
- ML20133B622 + (ML20133B622)
- ML20133B623 + (ML20133B623)
- PNO-IV-97-001, on 970102,notice Was Received Re Accumulated whole-body Exposure to Radiographer Assistant Which Exceeded Annual Limit of 5,000 Mrem During CY96.Cause of Exposure Unknown.Associated Safety Equipment Was Inspected + (ML20133B624)
- SNRC-1199, Forwards Rev 5 to Local Offsite Radiological Emergency Response Plan,Including Procedures,App a & App B Agreement Ltrs.Requests FEMA Review Rev 5,per NRC-FEMA MOU + (ML20133B625)
- 05000293/LER-1985-025, :on 850901,reactor Scram Occurred When Insulator in Switchyard Arced to Ground & Disintegrated. Caused by Salt Buildup Resulting from Storm.Insulator Replaced & Washdown Procedures Reviewed + (ML20133B626)
- ML20133B630 + (ML20133B630)
- ML20133B633 + (ML20133B633)
- ML20133B635 + (ML20133B635)
- ML20133B636 + (ML20133B636)
- ML20133B637 + (ML20133B637)