ML20133B606
| ML20133B606 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 07/30/1985 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20133B608 | List: |
| References | |
| NUDOCS 8508060221 | |
| Download: ML20133B606 (2) | |
See also: IR 05000295/1985020
Text
Fj
yg
w-
..
'
'
'JUL 3 0 $85
Docket No. 50-295
Docket No. 50-304
Commonwealth Edison Company
ATIN:
Mr. Cordell Koed
Vice President
Post Office Box 767
Chicago, IL 60690'
Gentlemen:
This refers to the routine safety inspection conducted by NRC inspectors
F. R. Dunaway, M. M. Holzmer, L. E. Kanter and J. N. Kish of this
-
office on May 30, 1985 through July 1, 1985 of activities at the Zion
Nuclear Generating Station, authorized by Licenses No. DPR-39 and No. DPR-48
and to the discussion of our findings with Mr. Ken Graesser at the conclusion
of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas,'the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
with NRC rcquirements, as specified in the enclosed Appendix. A written
response is required. ' Additionally, two instances were noted where changes
were mada of the facility, one administrative and one technical, for which
Technical Specification changes were not sought prior to implementation.
Neither change had any impact on the safe operation of the facility; however,
we are concerned with your departure from established processes and as such
request.that in your response to the violation that you separately address
the issue raised in paragraph 11 of the attached report.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)
will be placed in the NRC Public Document Room.
The responses directed by this letter (and the accompanying Notice) are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
h
295
O
\\
-
--- - -- - - ----
-
- - - - -
- - - - ---.
---
-- E A
'
-.
- -
..
Commonwealth Edison Company
2
We will gladly' discuss any questions you have concerning this inspection.
Sincerely,
C. E. Norelius, Director
Division of Reactor Projects
Enclosures:
1.
Appendix, Notice
of Violation
2.
Inspection Reports
No. 50-295/85020(DRP);
No. 50-304/85021(DRP)
cc w/ enclosures:
D. L. Farrar, Director
of Nuclear Licensing
K. L. Graesser, Station
Superintendent
DMB/ Document Control Desk-(RIDS)
Resident Inspector, RIII
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
Mayor, City of Zion
RIII
RIII
RIII
RIII
Y
[N
Suer [mann/jp JF$l{cd
W.[ n
wrigitt
-
t -
Nor ius
- ""4"5
07JO9785
7l,,4fg(
af
7/N/ff