Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20132E214 + (ML20132E214)
- 05000293/LER-1985-014, :on 850615,unplanned Reactor Scram Occurred Due to MSIV Isolation of High Water Level.Caused by Personnel Error.Personnel Counseled + (ML20132E216)
- 05000309/LER-1996-037, :on 961114,leaking P-29C Gland Cooling Check Valve Was Observed.Caused by Sticking Check Valve in Gland Cooling Water Supply Line to Pump.Affected Check Valves Have Been Replaced + (ML20132E218)
- ML20132E220 + (ML20132E220)
- ML20132E222 + (ML20132E222)
- ML20132E223 + (ML20132E223)
- ML20132E224 + (ML20132E224)
- ML20132E225 + (ML20132E225)
- ML20132E226 + (ML20132E226)
- ML20132E227 + (ML20132E227)
- ML20132E229 + (ML20132E229)
- ML20132E230 + (ML20132E230)
- ML20132E231 + (ML20132E231)
- ML20132E235 + (ML20132E235)
- ML20132E238 + (ML20132E238)
- ML20132E239 + (ML20132E239)
- ML20132E240 + (ML20132E240)
- ML20132E241 + (ML20132E241)
- ML20132E242 + (ML20132E242)
- ML20132E244 + (ML20132E244)
- ML20132E245 + (ML20132E245)
- ML20132E246 + (ML20132E246)
- 05000244/LER-1985-011, :on 850411,reactor Trip Occurred During Attempts to Trip Main Turbine Manually.Caused by Low Condenser Vacuum & Reactor Power Being Above P-7.Inquiry Re Reactor Trip Train Design Undertaken + (ML20132E247)
- ML20132E249 + (ML20132E249)
- ML20132E252 + (ML20132E252)
- IR 05000414/1985023 + (ML20132E253)
- ML20132E254 + (ML20132E254)
- ML20132E257 + (ML20132E257)
- PY-CEI-NRR-0355, Provides Final Update of Equipment Qualification Issues for Closing Out Outstanding Issue 4.All Equipment within Scope of 10CFR50.49 Qualified & All Active safety-related Pumps & Valves Qualified for Operability.Test List Encl + (ML20132E258)
- ML20132E260 + (ML20132E260)
- ML20132E261 + (ML20132E261)
- ML20132E263 + (ML20132E263)
- ML20132E270 + (ML20132E270)
- ML20132E271 + (ML20132E271)
- ML20132E272 + (ML20132E272)
- ML20132E273 + (ML20132E273)
- ML20132E274 + (ML20132E274)
- ML20132E277 + (ML20132E277)
- ML20132E278 + (ML20132E278)
- ML20132E279 + (ML20132E279)
- ML20132E280 + (ML20132E280)
- ML20132E281 + (ML20132E281)
- 3F0985-25, Forwards Response to NRC 850826 Request for Addl Info for 5 of 11 Criteria Summarized in Interim Safety Evaluation Re post-accident Sampling Sys (NUREG-0737,Item II.B.3) + (ML20132E282)
- IR 05000416/1985021 + (ML20132E283)
- ML20132E284 + (ML20132E284)
- ML20132E285 + (ML20132E285)
- ML20132E287 + (ML20132E287)
- ML20132E288 + (ML20132E288)
- ML20132E289 + (ML20132E289)
- ML20132E290 + (ML20132E290)
- ML20132E291 + (ML20132E291)