Monthly Operating Rept for Apr 1985
ML20132E272
Person / Time
Site: Callaway 
Issue date: 04/30/1985
From: Goodenow R, Miltenberger S
UNION ELECTRIC CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
ULNRC-1090, NUDOCS 8507170666
Download: ML20132E272 (7)


Text

<-

MONTHLY OPERATING REPORT DOCKET NO.

50-483 UNIT NAME CALLAWAY UNIT 1 DATE Mr. 7, 1985 COMPLEIED BY R. R.

COODENOW TELEPHONE (314) 676-8460 PART A OPERATIONS

SUMMARY

APRIL 1985 Unit was shut down in Mode 4 prior to the beginning of the monti, to remove startup strainers from main turbine stop valves along with other miscellaneous maintenance work. On April 10, 1985 the reactor was in Mode 2, but not critical, when rod H-8 was determined inoperable on the bottom.. Reactor tripped later due a

to motor generator rod drive trippinst.

Reactor was restarted, and unit placed in service on April 11, 1985. Unit was on line the remainder of the month, i

PART B PORV AND SAFETY VALVE

SUMMARY

~

None i

f CA-#804 (507170666850430 05/09/84 R

ADOCK 05000483

\\

\\

QDP-ZZ-04204 PDR-Page 1 of 4

Part C AVERAGE DAILY UNIT POWER LEVEL 50-483 DOCKET NO.

UNIT Callaway DATE MAY 7, 1985 R. R. GOODENOW COMPLETED BY TELEPHONE (314) 676-8460 MONTH APRIL 1985 a

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(Mwe. Net) 0 1083 1

37 0

1051 2

3, 0

1085 3

3,.

0 1075 4

20 0

1089 5

21 0

1098 s

22 0

1079 7

23 0

1106 a

24 0

1101 g

3 10 0

2g 1090 194 1084 11 27 346 1096 12 g

779 1100 13 gg 1107 1100 14 15 1119 33 1s 1081 l

i 0 [0 84 Page 2 of 4 QDP-ZZ-04204

Part D OPERATING DATA REPORT

+

50-483

~

DoCxET NO.

Callaway UNIT DATE MAY 7, 1985 R. R. GOODENOW COMPLETED 8Y (314) 676-8460 TELEPHONE OPERATING STATUS 719 APRIL 1985 GROSB HOURS IN REPORTING PERICO:

1. REPORTING PERico:
2. CURRENTLY AUTHORrZED power LEVEL (Mwit:

max. oEPENo. CAPACITY tMw Nein: Not vet known 3411 oaSaGN ELECTRICAL RATING (Mws.%st):

1171*

  • At stretch reactor power level which is dRETR Effo tif AN $[ web: Perating license.
3. PowsNEvELYvEe
4. REASONS FOR RESTRICTICN (IP A4Yh THIS MONTM YR TO DATE CUMu(Aypy g 479.7 2512.3 2814.8
5. NUMSER OF MouRS REACTOR WAS CRITICAL 0

0 0

8. REACTOR RESERVE SMUTDow% MCums 471.2 2447.7 2750.2
7. Hour $ GENERATOR ON LINE 0
s. unit RESERvt SHUTDOWN Moums

.1.476.721 7.193.410 8.194.935

9. GROSS THERMAL ENERGY GENER ATED tMwM) 499,153 2,501,325 2,840,505 to. Gross ELECTRICAL ENERGY GENER ATED (MwMI..

474.058 2,368,822 2,691,845

11. NET ELECTRICAL ENERGY GENER ATID (MwM) 66.7%

87.3%

88.5%

12. REACTOR SERvlCE P ACTOR 66.7%

87.3%

88,57

13. REACTOR AV AILABILITY P ACTOR 65.5%

85.0%

86. 4 */

14 UNIT SERVICE P ACTom

15. UNIT AVAILAtlLITY P ACTOR 65.5%

85.0%

86.4?

NA NA NA

18. UNIT CAPACITY P ACTOR tussae MDCI 56.37*

7 0.1 '/

  • 7 7.1ar *
17. UNIT CAPACITY P ACTOR tusing Dw Mne 0.0%

5.2%

4.7%

18. UNIT PORCEO OUTAGE RATE
19. SMUTDowNS SCHEDULED QvtR NExT S MONTMS (TYPt. DAfr. AND OURATION QP EACMI: 'None
20. IF Swur powN AT END or REPORT PERICo. ESTtMATEo Daft or ETARTup:

1 l

t

  1. 804 CA/D9/84 05 Page 3 of 4 gap.ZZ-04204

o r

Part E DOCKET NO.

50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway I) ATE MAY 7, 198 5 COMI'LETED BY R. R. GOODENOW REPORT MONTH APRTI. 1985 TELEro'ONE (314) 6;6-8460 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO.

DATE S: SCHEDULED l HOURS)

REASON REDUCING FOWER CORRECTIVE ACTIONS / COMMENTS 7

850329 Scheduled 247.8 B

1 Planned outage to remove startup strainers on main steam stops and control intercept valves.

sumesARY:

CA-f804

  • 05/09/84 Page 4 of 4 QDP-ZZ-04204

n hN

- e*

UNION EtecTnic COMPANY CALLAWAY PLANT MAILING ADDRESS:

P. O. BOM S 30 PULTON, MO. 8 525 9 May 8, 1985 Director, Resource Management Nuclear Regulatory Connaission Washington, DC 20555 ULNRC-1090

Dear Sir:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT APRIL 1985 I

i The enclosed Monthly Operating Report for April 1985 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

1 s

^

S. E. Miltenberger Manager, Callaway Plant 1

Mir MET /WRC/RRG/drs Enclosure ec: Distribution attached J

e 9

t cc distribution for ULNRC-1090 4

with enclosures Mr. James C. Keppler Regional Administrator-

. 0ffice of Inspection & Enforcement U. S. Nuclear Regulat,ory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Director Office of Inspection & Enforcement U.~ C.' Nuclear Regulatory Commission

- Washington, DC 20555

]

NRC' Resident Inspector i

a 4

t u,

l W

' +

,_____-_.m_

m. m

'I

.,\\ : '

-/

bec distribution for ULNRC-1090 o

with enclosure,s Records Center

-Institute of Nuclear Power Operations

.' Suite 1500 1100 circle 75 Parkway

,i.

Atlanta, GA 30339

~ ! ?.

American Nucleac Insurers Library c/o Dottie Sherman The Exchange Suite 245 270 Farmington Avenue

)

Farmington, CT- 06032 D. F.

.chnell J. F. '%Laughlin 4

J. E. Bavis (Z40M0k)

R. L. *)wers i

D. W. Capone A. C. Passwater/D. E. Shafer/D. J. Walker C. A. Hughes j

W. R.-Campbell M. E. Taylor d

W. R. Robinson (QA Record)

R. R. Goodenow i

L. K. Robertson (NSRB) i SEM Chrono 3456-0021.6 Z40ULNRC G56.37 N. Date 6