Informs of Plans to Conduct Design Insp of Plant,Units 1 & 2 Facilities.Insp Scheduled for Periods 970203-0314
ML20132E260
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/19/1996
From: Berkow H
NRC (Affiliation Not Assigned)
To: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
References
NUDOCS 9612230186
Download: ML20132E260 (2)


Text

'

. Mr. D.N. Morey Vice-Presid; int - Farley Project h

S:uthern Nuclear Operating Company, Inc.

Post Office Box 1295 Birmingham, A!. 32501-1295

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANTS, UNITS I and 2 DESIGN INSPECTION

Dear Mr. Morey:

The purpose of this letter is to inform you of our plans to conduct a design inspection of the Farley Units I and 2 facilities. We have scheduled the inspection for the periods of February 3 through 7, 1997, February 17 through 28, 1997, and March 10 through 14, 1997, and your staff has indicated that there are no major conflicts with on-site activities during this period. The team leader and two team members will visit the site and corporate office between January 21 through 23, 1997, to complete the badging process for unescorted access and to collect documentation necessary for in-office review and on-site inspection. l Recent NRC inspections at nuclear power reactor facilities have identified ,

numerous findings where the plant configuration or operations were l inconsistent with the design basis, licensing basis, or the UFSAR. Therefore, '

the NRC has decided to perform design inspections at nuclear power reactor facilities utilizing Inspection Procedure (IP) 93801, " Safety System l Functional Inspection." Two systems will be selected for review during the )

inspection.

Mr. Roy K. Mathew, Team Leader, NRR, will interface with you and your staff regarding all matters related to this inspection. The inspection will be performed using a team of five engineers from Stone & Webster Engineering Corporation (SWEC) who have been contracted by the NRC for this purpose.

Mr. Robert Bradbury of SWEC who is part of the five person team will be the lead contractor engineer.

We will be in contact with your staff rega. ding additional details for the inspection. Should you have any questions, please contact Mr. Mathew at (301) 415-2965 or me at (301) 415-1485.

Sincerely, Original signed by Victor Nerses Herbert N. Berkow , Project Director Project Directorate II-2 930060

~

ojyision of a ,ctor projects _ ifri Office of Nuclear Reactor Regulation ,

cc: See attached list -

Distribution:

Docket File PUBLIC gg Q hh @

PSIB R/F RPZimmerman, NRR gig /g FPGillespie, NRR EWMerschoff, RII AFGibson, RII Charles Casto, RII ) ,Q

  • Previously concurred T. 7/MM'MW DOCUMENT NAME: G:\ ANN 0UNCE.FARL

(

Ts receive a copy of this document, indicate in thew = Copy wi) en res *E" = Copy with enclosures *N" = No copy 0FFICE DISP /NRR l , QIS hitRBY lO Di$R/NM lU DRPE/t(RR l_ l NAME RKMathew:smp JPNpf;1Ci'n RMGaHo HBt%k6h(L . fpt F 12/ @/96 12j @ 96 *~

DATE 12/16/96* 12//9/96 Dft b$ obo60348 FFICIAL RECORD COPY P PDR

" Mr. D.N. Moray '

t Vice-Presid:nt - Farley Project Southern Nuclear Operating Company, Inc.

Post Office Box 1295 i Birmingham, AL 3250bl295

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANTS, UNITS 1 and 2 DESIGN INSPECTION

Dear Mr. Morey:

The purpose of this letter is to inform you of our plans to conduct a design inspection of the Farley Units 1 and 2 facilities. We have scheduled the inspection for the periods of February 3 through 7,1997, February 17 through l 28, 1997, and March 10 through 14, 19)7, and your staff has indicated that  !

there are no major conflicts with on-site activities during this period. The '

team leader and two team members will visit the site and corporate office between January 21 through 23, 1997, to complete the badging process for unescorted access and to collect documentation necessary for in-office review

and on-site inspection.

1 Recent NRC inspections at nuclear power reactor facilities have identified l numerous findings where the plant configuration or operations were I inconsistent with the design basis, licensing basis, or the UFSAR. Therefore, the NRC has decided to perform design inspections at nuclear power reactor facilities utilizing Inspection Procedure (IP) 93801, " Safety System i Functional Inspection." Two systems will be selected for review during the inspection.

Mr. Roy K. Mathew, Team Leader, NRR, will interface with you and your staff regarding all matters related to this inspection. The inspection will be performed using a team of five engineers from Stone & Webster Engineering ,

Corporation (SWEC) who have been contracted by the NRC for this purpose, i Mr. Robert Bradbury of SWEC who is part of the five person team will be the lead contractor engineer.

We will be in contact with your staff regarding additional details for the inspection. Should you have any questions, please contact Mr. Mathew at (301) 415-2965 or me at (301) 415-1485.

Sincerely, Original signed by Victor Nerses Herbert N. Berkow , Project Director Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc: See attached list .

Distribution:

Docket File PUBLIC PSIB R/F RPZimmerman, dRR g gig /g FPGillespie, NRR EWHerschoff, RII AFGibson, RII Charles Casto, RII

  • Previously concurred T. WN4*IAV DOCUMENT NAME: G:\ ANN 0UNCE.FARL Te receive e copy of this document. Indcate in thew = Copy wi e res E* = Copy with enclosures *N* = No copy 0FFICE DISP /NRR , PIS PyMRBY Q l91$R/M lU DRPE/t(RR , l NAME RKMathew:smp WN pfkTn RP Ga}io MBlif)cWL . fat _.

'~

DATE 12/16/96* F 12/ Y/96 12; D96 12//9/96 OFFICIAL RECORD COPY

-