ML20132E241
| ML20132E241 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 07/11/1985 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20132E245 | List: |
| References | |
| NUDOCS 8508010749 | |
| Download: ML20132E241 (1) | |
See also: IR 05000414/1985023
Text
ypll0 cJ
's
,
f)(JL i i 1385
pike Power Company
V ATTN: Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT:
REPORT N0. 50-414/85-23
On June 24-27, 1985, NRC inspected activities authorized by NRC Construction
Permit No. CPPR-117 for your Catawba facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
.
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
i
Sincerely,
Original signed by V. Panciera
Virgil L. Brownlee, Chief
Reactor Projects Branch 2
Division of Reactor Projects
.
Enclosure:
Inspection Report No. 50-414/85-23
cc,w/ encl:
LRCL. Dick, Vice President - Construction
DC W. Hampton, Station Manager
bc.c-w/ encl:
tNRC Resident Inspector
cG ,; Johnson, ELD
'K. N. Jabbour, NRR
Document Control Desk
State of South Carolina
R
RII
RII
d4 '
omas:bhg
FJa
ARHerdt
7/g/85
7/{ 85
7/(/85
,
8508010749 850711
ADOCK 05000414
)
G
PDR.
gQ{
_
_ _ _
-
_
-