Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000259/LER-1985-011-01, :on 850411,control Circuit Fuse Blew,Causing Partial Initiation of Primary Containment Isolation Sys. Caused by Failure of Relay 16AK72 Coil.Coil Replaced.New Fuse Installed.Recurrence Control Not Required + (ML20117J609)
- ML20117J619 + (ML20117J619)
- ML20117J639 + (ML20117J639)
- 05000302/LER-1995-028, :on 951213,operation Was Outside Design Due to Personnel Errors & Inadequate Documentation of Borated Water Storage Tank Vacuum Breaker Capacity.Initiated Work Request to Remove & Inspect DHV-69 + (ML20117J640)
- ML20117J653 + (ML20117J653)
- ML20117J656 + (ML20117J656)
- ML20117J675 + (ML20117J675)
- ML20117J676 + (ML20117J676)
- ML20117J689 + (ML20117J689)
- W3P85-1263, Forwards marked-up Page 14.2-136 of Amend 18 to FSAR, Reflecting Changes in Test Subsection 14.2.12.3.31 Re Control Sys Checkout.Megawatt Demand Setter Deleted as Test Prerequisite Because Plant Design Does Not Have Setter + (ML20117J693)
- ML20117J711 + (ML20117J711)
- ST-HL-AE-1239, Forwards Listed Attachments Describing Details of 850326-29 Review Meetings Re Instrumentation & Controls Design Features & Program Implementation,Including Agenda,List of Attendees,Handouts & Action Items + (ML20117J716)
- ML20117J732 + (ML20117J732)
- LIC-96-0075, Submits Rev 12 to Fort Calhoun Station Site Security Plan. Encl Withheld + (ML20117J750)
- W3P85-1277, Forwards Nonproprietary & Proprietary Revised Emergency Plan Procedures,Including EP-2-010, Notification & Communication & EP-2-061, Emergency Environ Monitoring. Proprietary Procedures Withheld + (ML20117J757)
- ML20117J767 + (ML20117J767)
- ML20117J779 + (ML20117J779)
- ML20117J786 + (ML20117J786)
- NRC-96-0053, Special Rept:Documents Inoperability of Seismic Monitoring Instrumentation Exceeding 30 Days.Caused by Inadequate Surveillance Testing of Active Triaxial Accelerometers & Seismic Trigger.Surveillance Procedures Will Be Revised + (ML20117J808)
- RBG-43159, Provides Update to NRC Project Manager TAC Rept & Licensee Implementation Dates for Completed Actions on TAC List + (ML20117J812)
- ML20117J828 + (ML20117J828)
- ML20117J831 + (ML20117J831)
- ML20117J832 + (ML20117J832)
- ML20117J837 + (ML20117J837)
- ML20117J839 + (ML20117J839)
- ML20117J841 + (ML20117J841)
- ML20117J842 + (ML20117J842)
- ML20117J846 + (ML20117J846)
- ML20117J857 + (ML20117J857)
- ML20117J907 + (ML20117J907)
- ML20117J918 + (ML20117J918)
- ML20117J921 + (ML20117J921)
- RBG-43185, Radiological Environ Operating Rept (Amended) River Bend Station Jan-Dec 1995 + (ML20117J958)
- ML20117J960 + (ML20117J960)
- ML20117J965 + (ML20117J965)
- ML20117J975 + (ML20117J975)
- ML20117J984 + (ML20117J984)
- ML20117J990 + (ML20117J990)
- ML20117K003 + (ML20117K003)
- ML20117K031 + (ML20117K031)
- ML20117K052 + (ML20117K052)
- ML20117K062 + (ML20117K062)
- B15809, Informs That RA Cox Has Completed 1995 Annual Operating Test & Is Currently Enrolled in 1996 Licensed Operator Requalification Training Program + (ML20117K070)
- NSD-NRC-96-4808, Forwards Responses to NRC RAI on AP600 Design Certification Program + (ML20117K071)
- ML20117K076 + (ML20117K076)
- ML20117K077 + (ML20117K077)
- ML20117K081 + (ML20117K081)
- ML20117K085 + (ML20117K085)
- RBG-43042, License Amend Request 96-35 Re Reactor Vessel Matl Surveillance Program Capsule Withdrawal Schedule. GE-NE-B1301807-02, Surveillance Specimen Program Evaluation for River Bend Station Encl + (ML20117K087)
- ML20117K089 + (ML20117K089)
- NRC-96-0114, Informs That Licensing Director Responsibilities Transferred to Pw Smith,Effective 960819 + (ML20117K097)