ML20117J675

From kanterella
Jump to navigation Jump to search
Discusses Listing of All Plant Shutdowns Where CCP Temp Under Review.Computer Tapes Currently Being Loaded by Computer Services & Will Take Few Days to Extract Info
ML20117J675
Person / Time
Site: Millstone 
Issue date: 03/21/1996
From: Jonasch S
NORTHEAST UTILITIES SERVICE CO.
To: John Nakoski
NRC
Shared Package
ML20117J660 List:
References
NUDOCS 9609100440
Download: ML20117J675 (1)


Text

(). N:rtheast

/

\\

l

\\s_

/ Utilities System l

l Memo TO:

John Nakoski 3/21/96 NRC 0330 hrs.

- }- -

jyr-From:

Stephen Jonasch Tech Support Engineer, MP3 (x5556)

Subject:

Status of CCP Temperature Question 1

Currently, Tech Support Engineering has obtained a j

listing of all plant shutdowns where the CCP temperature is under this review. The computer tapes are currently being loaded by Computer Services. However, they have indicated to us that this will take a couple of days to extract the information. As information becomes available to Tech Support Engineering, it will be forwarded to you for your review. This may commence by Friday.

It should be noted that the historical data of this timeframe does not provide the 10 second increments which was available for the Dec. '95 shutdown. Data reduction was part of the normal computer cystem at that time. The 10 second increment was a recent computer upgrade.

A historical search of revisions has been conducted on the operations Procedure OP 3208, Plant Cooldown. The change to the procedure which required that OPS notify the System Engineer was incorporated in revision 14, dated 4/12/95. Prior to that, the procedure always specified temperature restrictions but did not require notification of the System Engineer.

CC:sfj C. Janus T. Mawson 1

9609100440 960905 PDR ADOCK 05000423 G

PDR I