ML20117J831
| ML20117J831 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 05/30/1996 |
| From: | Nunn D SOUTHERN CALIFORNIA EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20117J835 | List: |
| References | |
| NUDOCS 9606030176 | |
| Download: ML20117J831 (2) | |
Text
50U1Hf RN cAttiORNIA
[L
{
Dwight E. Nunn Vice President An LD150% IN1LRMTIONAL Company 1
May 30, 1996 i
U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.
20555 Gentlemen:
Subject:
Docket Nos. 50-361 and 50-362 Amendment Application Nos. 161 and 145 Appendix J. Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Option B San Onofre Nuclear Generating Station Units 2 and 3 Enclosed are Amendment Application Numbers 161 and 145 to Facility Operating Licenses NPF-10 and NPF-15 for San Onofre Nuclear Generating Station (S0f.CS)
Units 2 and 3, respectively. These amendment applications consist of Proposed Technical Specification Change Number NPF-10/15-468 (PCN-468).
PCN-468, which requests changes to Surveillance Requirement (SR) 3.6.1.1, SR 3.6.2.1, and SR 3.6.3.6, is provided as Enclosure 1 to this letter. The affected Bases sections are provided for information only.
The proposed change is to allow implementation of the recently approved Option B to 10 CFR Part 50, Appendix J.
This new rule allows for a j
performance-based option for determining the test frequency for containment i
leakage rate testing. This amendment request will change the SONGS Units 2 and 3 Technical Specifications (TSs) by replacing the references to
" Appendix J, as modified by approved exemptions" with " Appendix J, Option B, as modified by approved exemptions and Regulatory Guide 1.163, dated September, 1995."
This change is requested to Unit 2 Amendment No. 127 and Unit 3 Amendment No. 116 approved TSs. To implement the new program by the SONGS Unit 2 Cycle 9 refueling outage, Edison requests this amendment be issued effective i
October 1, 1996 and be implemented within 30 days from the date of issuance.
I This amendment request is expected to result in a total present worth savings in excess of $100,000 for the two units over the lifetime of the plant.
l Because of this savings, this submittal is being submitted as a Cost l
Beneficial Licensing Action (CBLA).
(
9606030176 960530 PDR ADOCK 05000361 P
/
g P. O.Ikw 128 l
San Clemente, CA 92672 714-368-1480
1 f
Document Control Desk l l
If.you would like additional information on this Technical Specification change request, please let me know.
l Sincerely, i
1 I
l i
cc:
L. J. Callan, Regional Administrator, NRC Region IV i
J. E. Dyer, Director, Division of Reactor Projects, Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV j
J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3 M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 H. Kocol, California State Department of Health Services i
l
[
I' I
l l
)
4
!