Forwards Applications 161 & 145 for Amend to Licenses NPF-10 & NPF-15,consisting of Change Number 468,requesting Change to SR 3.6.1.1,SR 3.6.2.1 & SR 3.6.3.6 Which Allows Implementation of Option B to 10CFR50,App J
ML20117J831
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 05/30/1996
From: Nunn D
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20117J835 List:
References
NUDOCS 9606030176
Download: ML20117J831 (2)


Text

50U1Hf RN cAttiORNIA

[L {

Dwight E. Nunn Vice President An LD150% IN1LRMTIONAL Company 1

May 30, 1996  ;

i U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

Docket Nos. 50-361 and 50-362 Amendment Application Nos. 161 and 145 Appendix J. Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Option B San Onofre Nuclear Generating Station Units 2 and 3 Enclosed are Amendment Application Numbers 161 and 145 to Facility Operating Licenses NPF-10 and NPF-15 for San Onofre Nuclear Generating Station (S0f.CS)

Units 2 and 3, respectively. These amendment applications consist of Proposed Technical Specification Change Number NPF-10/15-468 (PCN-468). PCN-468, which requests changes to Surveillance Requirement (SR) 3.6.1.1, SR 3.6.2.1, and SR 3.6.3.6, is provided as Enclosure 1 to this letter. The affected Bases sections are provided for information only.

The proposed change is to allow implementation of the recently approved Option B to 10 CFR Part 50, Appendix J. This new rule allows for a j performance-based option for determining the test frequency for containment i leakage rate testing. This amendment request will change the SONGS Units 2 and 3 Technical Specifications (TSs) by replacing the references to

" Appendix J, as modified by approved exemptions" with " Appendix J, Option B, as modified by approved exemptions and Regulatory Guide 1.163, dated September, 1995."

This change is requested to Unit 2 Amendment No. 127 and Unit 3 Amendment No. 116 approved TSs. To implement the new program by the SONGS Unit 2 Cycle 9 refueling outage, Edison requests this amendment be issued effective i October 1, 1996 and be implemented within 30 days from the date of issuance.

I This amendment request is expected to result in a total present worth savings in excess of $100,000 for the two units over the lifetime of the plant.

l Because of this savings, this submittal is being submitted as a Cost l Beneficial Licensing Action (CBLA).

(

9606030176 960530

, PDR ADOCK 05000361 /

P PDR g P. O.Ikw 128 l San Clemente, CA 92672 714-368-1480

1 l

f Document Control Desk l l If.you would like additional information on this Technical Specification change request, please let me know.  ;

l Sincerely,  ! I i

1 I

l i

cc: L. J. Callan, Regional Administrator, NRC Region IV i J. E. Dyer, Director, Division of Reactor Projects, Region IV ,

K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV j J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3 M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3  ;

H. Kocol, California State Department of Health Services  !

i l

[

I I

l l

4

)

!