Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20117J443 + (ML20117J443)
- ML20117J446 + (ML20117J446)
- ML20117J447 + (ML20117J447)
- ML20117J448 + (ML20117J448)
- ML20117J450 + (ML20117J450)
- ML20117J451 + (ML20117J451)
- ML20117J459 + (ML20117J459)
- ML20117J469 + (ML20117J469)
- ML20117J473 + (ML20117J473)
- ML20117J474 + (ML20117J474)
- ML20117J481 + (ML20117J481)
- ML20117J486 + (ML20117J486)
- ML20117J489 + (ML20117J489)
- B15881, Provides Addl Info Re to Juma & Provides Nuclear Committee Advisory Team Independent Assessment of Root & Contributing Causes for Decline in Performance of Millstone Unit 3 + (ML20117J490)
- ML20117J491 + (ML20117J491)
- ML20117J496 + (ML20117J496)
- ML20117J499 + (ML20117J499)
- ML20117J547 + (ML20117J547)
- 05000366/LER-1996-003-05, :on 960813,HPCI Sys Temporarily Inoperable Following ESF Actuation,Due to Physical Slip of Technician That Occurred When Technician Was Manipulating Piece of Test.Valve re-opened + (ML20117J558)
- 1CAN089602, Forwards TS Change Allowing Delay of Surface & Volumetric Examinations for RCPs P32A,P32B & P32C for One Cycle + (ML20117J574)
- ML20117J576 + (ML20117J576)
- ML20117J580 + (ML20117J580)
- U-602630, Forwards Summary Rept of Alert Event Which Occurred at Station on 960819,per App 1 of NUREG-0654,rev 1 & Table 4-6 of CPS Emergency Plan + (ML20117J582)
- ML20117J583 + (ML20117J583)
- ML20117J596 + (ML20117J596)
- ML20117J598 + (ML20117J598)
- 05000259/LER-1985-011-01, :on 850411,control Circuit Fuse Blew,Causing Partial Initiation of Primary Containment Isolation Sys. Caused by Failure of Relay 16AK72 Coil.Coil Replaced.New Fuse Installed.Recurrence Control Not Required + (ML20117J609)
- ML20117J619 + (ML20117J619)
- ML20117J639 + (ML20117J639)
- 05000302/LER-1995-028, :on 951213,operation Was Outside Design Due to Personnel Errors & Inadequate Documentation of Borated Water Storage Tank Vacuum Breaker Capacity.Initiated Work Request to Remove & Inspect DHV-69 + (ML20117J640)
- ML20117J653 + (ML20117J653)
- ML20117J656 + (ML20117J656)
- ML20117J675 + (ML20117J675)
- ML20117J676 + (ML20117J676)
- ML20117J689 + (ML20117J689)
- W3P85-1263, Forwards marked-up Page 14.2-136 of Amend 18 to FSAR, Reflecting Changes in Test Subsection 14.2.12.3.31 Re Control Sys Checkout.Megawatt Demand Setter Deleted as Test Prerequisite Because Plant Design Does Not Have Setter + (ML20117J693)
- ML20117J711 + (ML20117J711)
- ST-HL-AE-1239, Forwards Listed Attachments Describing Details of 850326-29 Review Meetings Re Instrumentation & Controls Design Features & Program Implementation,Including Agenda,List of Attendees,Handouts & Action Items + (ML20117J716)
- ML20117J732 + (ML20117J732)
- LIC-96-0075, Submits Rev 12 to Fort Calhoun Station Site Security Plan. Encl Withheld + (ML20117J750)
- W3P85-1277, Forwards Nonproprietary & Proprietary Revised Emergency Plan Procedures,Including EP-2-010, Notification & Communication & EP-2-061, Emergency Environ Monitoring. Proprietary Procedures Withheld + (ML20117J757)
- ML20117J767 + (ML20117J767)
- ML20117J779 + (ML20117J779)
- ML20117J786 + (ML20117J786)
- NRC-96-0053, Special Rept:Documents Inoperability of Seismic Monitoring Instrumentation Exceeding 30 Days.Caused by Inadequate Surveillance Testing of Active Triaxial Accelerometers & Seismic Trigger.Surveillance Procedures Will Be Revised + (ML20117J808)
- RBG-43159, Provides Update to NRC Project Manager TAC Rept & Licensee Implementation Dates for Completed Actions on TAC List + (ML20117J812)
- ML20117J828 + (ML20117J828)
- ML20117J831 + (ML20117J831)
- ML20117J832 + (ML20117J832)
- ML20117J837 + (ML20117J837)
- ML20117J839 + (ML20117J839)