Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000413/LER-1996-007-01, :on 960718,discovered MSSV Lift Setpoint Drift. Caused by Unanticipated Interaction of Components.Adjusted & Retested Valves & Submitted Application to Amend TS to Change Tolerance to Plus or Minus 3 Percent + (ML20116M089)
- ML20116M093 + (ML20116M093)
- ML20116M094 + (ML20116M094)
- PY-CEI-NRR-2084, Forwards semi-annual fitness-for-duty Rept Jan-June 1996 + (ML20116M095)
- NSD-NRC-96-4761, Forwards,Per 960627 Phone Request,Draft of Sections 1.0,4.0 & 5.0 of AP600 Tier 1 Certified Design Matl.Info Should Be Used to Facilitate Review of AP600 Pilot ITAAC Submittal of 960604 + (ML20116M100)
- ML20116M103 + (ML20116M103)
- NSD-NRC-96-4798, Informs That Comments Provided Will Be Considered in Development of Remaining AP600 ITAAC + (ML20116M107)
- 05000368/LER-1985-008, :on 850318,degraded Penetration Fire Barrier Blockout Discovered.Condition Existed Since Initial Grout Sealing.Fire Watch Established Per Requirements of Tech Spec 3.7.11 & Void Subsequently Filled + (ML20116M108)
- ML20116M112 + (ML20116M112)
- ML20116M113 + (ML20116M113)
- ML20116M124 + (ML20116M124)
- BSEP-96-0296, Responds to NRC Ltr Which Requested That Util Confirm Commitments & Indicate Projected Completion Dates for Revising Plant UFSAR to Provide Listed Info + (ML20116M126)
- ML20116M127 + (ML20116M127)
- PY-CEI-NRR-2083, Discusses PNPPs Intent of Transfer Responsibility for Review & Approval of Procurement Documents to Centerior Supply Chain Organization.Justification & Basis Concluding That Change Satisfies 10CFR50,App B & TS Criteria Attached + (ML20116M128)
- ML20116M129 + (ML20116M129)
- ML20116M130 + (ML20116M130)
- BSEP-96-0295, Monthly Operating Repts for July 1996 for Brunswick Steam Electric Plant,Units 1 & 2 + (ML20116M139)
- PY-CEI-NRR-2085, Monthly Operating Rept for Jul 1996 for Perry Nuclear Power Plant Unit 1 + (ML20116M141)
- LIC-96-0113, Monthly Operating Rept for Jul 1996 for Fort Calhoun Station Unit 1 + (ML20116M142)
- ML20116M143 + (ML20116M143)
- 05000374/LER-1985-012-04, :on 850331,during Performance of RHR Injection Line Integrity Monitor Calibr & Functional Test, RHR Shutdown Cooling Isolation Occurred.Caused by Personnel Error.Personnel Will Be Trained + (ML20116M144)
- 05000373/LER-1985-031-01, :on 850311,while Discharging Radwaste,Sys Isolated on High Road Signal.Caused by Misreading of Max Allowable hi-hi Alarm/Trip Setpoint from Chart Recorder.Addl Training Instituted + (ML20116M146)
- ML20116M147 + (ML20116M147)
- ML20116M151 + (ML20116M151)
- ML20116M152 + (ML20116M152)
- ML20116M154 + (ML20116M154)
- ML20116M156 + (ML20116M156)
- ML20116M164 + (ML20116M164)
- ML20116M165 + (ML20116M165)
- ML20116M166 + (ML20116M166)
- ML20116M169 + (ML20116M169)
- ML20116M170 + (ML20116M170)
- ML20116M177 + (ML20116M177)
- ML20116M179 + (ML20116M179)
- ML20116M184 + (ML20116M184)
- ML20116M186 + (ML20116M186)
- ML20116M189 + (ML20116M189)
- ML20116M191 + (ML20116M191)
- ML20116M194 + (ML20116M194)
- ML20116M200 + (ML20116M200)
- ML20116M210 + (ML20116M210)
- DCL-96-170, Forwards Change 1 to Rev 4 of Training & Qualification Plan, Per 10CFR50.54(p).Plan Withheld + (ML20116M228)
- 05000289/LER-1992-003-01, :on 921019,discovered Reactor Building Atmospheric Radiation Monitor Inoperable Due to Personnel Error Which Caused Improper Valve Lineup.I&C Technician Has Been Counseled + (ML20116M240)
- ML20116M243 + (ML20116M243)
- ML20116M248 + (ML20116M248)
- ML20116M251 + (ML20116M251)
- ML20116M261 + (ML20116M261)
- ML20116M293 + (ML20116M293)
- ML20116M296 + (ML20116M296)
- ML20116M299 + (ML20116M299)
- ML20116M301 + (ML20116M301)