ML20116M186
| ML20116M186 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 07/31/1996 |
| From: | Robert Williams DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20116M180 | List: |
| References | |
| NUDOCS 9608200063 | |
| Download: ML20116M186 (10) | |
Text
4 OPERATING DATA REPORT l
l DOCKET NO 50-369 DATE Avaust 15. 1996 OPERATIN6 STATUS COMPLETED BY,
R.A. Willians
- 1. Unit Name: McGuire 1
- 2. Reporting Period: July 1, 1996-July 31, 1996
- 3. Licensed Thereal Power (Mt):
3411
- 4. Naseplate Rating (Gross MWe):
1305e Notes eNaseplate Rating
- 9. Design Electrical Rating (Net Me):
1180 (Gross M el calculated as
- 6. Maxisue Dependable Capacity (Gross Me):
1171 1450.000 W A x.90 power
- 7. Marisco Dependable Capacity (Net Mel:
!!29 factor per Page lii, L
- 8. If Changes Dccur in Capacity Ratings (Itees Nueber 3 Through 7) Since Last NURE6-0020.
Report. Give Reasons:
- 9. Power Level To Which Restricted, if Any (Net Me):
- 10. Reason for Restrictions, if any:
i This Month Yr.-to-Date Cumulative l
!!. Hours in Reporting Period 744.0 5111.0 128567.0
- 12. Number Of Hours Reactor Was Critical 744.0-4532.5 92971.9
- 13. Reactor Reserve Shutdown Hours -
--0-- -
- 14. Hours Benerator On-Line 744,0 4440.8 91972.3
- 15. Unit Reserve Shutdown Hours
--0--
--0--
- 16. Gross Thereal Energy Generated (MH) 2532247 14895339 299649441
- 17. Gross Electrical Energy Generated ( M H) 848557 5103819 99479099 l
10.NetElectricalEnergyGenerated(MH) 816027 4903468 95071039
- 19. Unit Service Factor 100.0 86.9 71.5 20.UnitAvailabilityFactor 100.0 E6.9 71.5
- 21. Unit Capacity Factor (Using MDC Net) 97.2 85.0 64.5
- 22. Unit Capacity Factor (Using DER Net!
93.0 01.3 62.7
- 23. Unit forced Outage Rate 0.0 1.3 13.1
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Consercial Operationi:
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMERCIAL OPERATION 9608200063 960815 PDR ADOCK 05000369 R
OPERATING DATA REPORT j
DOCK.ET NO 50-369 UNIT McGuire 1 DATE Auoust 15. 1996 i
COMPLETED BY R.A. Williams TELEPHONE 704-382-5346 1
NONTH July. 1996 p.Q AVERAGE DAILY POWER LEVEL QM AVERAGE DAILY F0WER LEVEL (MWe-Net)
(MWe-Ket) i 1095 17
!!02 2
1091 18 1102 J
3 1072 19 1101 4
1094 20 1097 l
5 1097 21 1093 l
6 1101 22 1096 7
1101 23 1093 8
!!04 24 1093 7
!!00 25 1096 10 1095 26 1095 11 1094 27 1094 12 1094 28 1096 13 1101 29 1095 14 1104 30 1097 13
!!07 31 109B 16 1104
UNIT SITGTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-369 UNIT NAME mu.2ulm i DATE u s /1d /.s e REPORT MONTH July 1996 COMPLETED BY x.
A.
nilliams i
TELEPHONE
( ive ) -3 52-d34 6 (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE
.N Y
S SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S l
t i
f i
I 5
(1)
(2)
(3)
(4) r F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent w Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER (NUREG-0161))
D-Regulatory Restriction 4-Other (Explain)
File E-@erator Training & License Examination F-Administrative (5)
(Explain) (Explain)
Exhibit I - Same Source G-Operator Error H-Other i
t-m
~., -.
1
+
DOCKET: 50-369 UNIT: McGuire 1 l
i Date:
08/15/96 1
NARRATIVE
SUMMARY
MONTil: July,1996 j
McGuire Unit I began the month of July operating at 100% full power. The unit operated at or near 100%
full power for the entire month.
i l
I i
l i
i l
Prepared by: R. A. Williams Telephone:(704)- 382-5346 4
i 1
i 4
.m..-
I i
MONTifLY REFUELING INFORMATION REOUEST l.
Facility name:
McGuire. Unit._1 i
2.
Scheduled next refueling shutdown: January 1997 3.
Scheduled restart following refueling: May 1997 TIIE PROJECT MANAGER llAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. TliEREFORE, QUESTIONS 4 TilROUGli 6 WILL NO LONGER BE MAINTAINED IN Tills REPORT.
4.
Will refueling or resumption of operation thereafter requin e a technical specification change or other license amendment?
i If yes, what will these be?
l If no, has reload design and core configuration been reviewed by Safety Review Committee i
regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
l 6.
Important licensing considerations (new or different design or supplier, unreviewed design or l
performance analysis methods, significant changes in design or new operating procedures).
l l
7.
Number of Fuel assemblies (a) in the core: J,93 (b) in the spent fuel pool: 723 l
8.
Present licensed fuel pool capacity: J46,3 Size of requested or planned increase: -
9.
Projected date oflast refueling which can be accommodated by present license capacity: March i
l 2006* "
DUKE POWER COMPANY DATE: August 15.1996 i
Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 l
~. - - - - -. --
l t
OPERAi!NG DATA F:EPORT i
l DOCKET WO 50-370 i
DATE Auoust 15. 1996 OPERATIN8 STATUS COMPLETED BY R.A. Williams TELEPHONE 704-382-5346
- 1. Unit Nase: nc6uire 2
- 2. Reporting Period: July 1, 1996-July 31, 1996 l
- 3. Licensed Thereal Power (Wil:
3411
- 4. Naseplate Rating (Gross Mel 1305e Notes #Naseplate Rating l
- 5. Design Electrical Rating (Net W el:
!!80 (Gross Muel calculated as l
- 6. Manteue Dependable Capacity (Gross Mue):
!!71 1450.000 MVA
.90 power
- 7. Marleue Dependable Capacity (Net Me):
!!29 factorperPagelii,
- 8. If Changes Occur in Capacity Ratings (! tees Nueber 3 Through 7) Since Last NURE6-0020.
l Repert. Give Reasons:
i
- 9. Power Level To Which Restricted, if Any (Net W els l
- 10. Reason For Restrictions, if any:
This Month Yr.-to-Date Coeulative
- 11. Hours in Reporting Period 744.0 5111.0 109863.0
- 12. Number Of Hours Reactor Was Critical 701.1 3194.1 84949.7
- 13. Reactor Reserve Shutdown Hours
--0--
--0
--0--
l
- 14. Hours 6enerator On-Line 693.3 3158.2 83889.0
- 15. Unit Reserve Shutdown Hours
--0--
--0-- -
- 16. Stoss Thereal Energy Generated (WH)
E302509 10387059 275626708
)
- 17. Gross Electrical Energy Generated ( WH) 780278 3622793 96126069 I
- 18. Net Electrical Energy Generated ( WH) 747973 3463458 92175815 i
- 19. Unit Service Fattr,r 93.2 61.8 77.1 j
- 20. Unit Availability Factor 93.2 61.8 77.1
- 21. Unit Capacity Factor (Using MDC Net) 89.1 60.0 74.3
- 22. Unit Capacity Factor (Using DER Net) 85.2 57.4 71.8 l
- 23. Unit Forced Outage Rate 6.8 24.2 7.2 l
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
l
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Consercial Operationi:
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION t
T
CPERATINS DATA REPORT l
DOCKET ND 50-370 UNIT McGuire 2 DATE Auoust 15. 1996 CDMPLETED BY R.A. Willians TELEPHONE 704-382-5346 MONTH July 1996 QQ AVERAGE DAILY POWER LEVEL ER AVERAGE DAILY POWER LEVEL i
(MWe-Net)
(MWe-Net) 1 0
17
!!04 2
0 18
!!03 3
304 19
!!03 4
1085 20
!!01 5
1099 21 1097 6
!!04 22 1100 7
!!04 23 1090 8
1109 24 1098 9
!!05 25
!!00 10 1099 26 1102 1097 27
!!04 l
12 1095 28 1105 l
13
!!02 29
!!05 l
14
!!06 30
!!07 1
15 1110 31
!!00 16
!!06 l
l l
l
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-370 UNXT NAME mwuixe. 2 DATE ve/1d/36 REPORT MONTH July 1996 COMPLETED BY x.
A.
svilliams TELEPHONE tIve;-4u2-d346
}
(1)
(2)
(3)
(4)
(5)
R MET-l E
HOD T
A OF LICENSE i
N Y
S SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT' TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 3
96 1 F
50.67 A
IA INSTRU INTERMEDIATE POWER RANGE DETECTOR
'N35' INOPERABLE i
l t
t
?
Y (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions :
S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data i
B-Maintenance or test 2-Manual Scram Ent W Sneets For Licensee' Event Report (LER
( M EG-0161))
C-Refueling 3-Automatic Scram D-Regulato n Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative
-(5)
(Ex;" ain) (Explain)
Exhibit I - Same Source G-@ erator Error H-Other i
I i
.. ~. - -. - - -. - ~,,..
--....--~.n,,,
DOCKET: 50 - 370 UNIT: McGuire 2 Date:
08/15/96 NARRATIVE
SUMMARY
MONTil: July,1996 McGuire Unit 2 began the month of July in an outage due to inoperable intermediate power range detector
'N35'. He unit was placed on-line 07/03/96 at 0240. De unit returned to 100% full power on 07/26/96 at 1507 and operated at or near 100% full power the remainder of the month.
1 l
l Prepared by: R. A. Williams Telephone: (704). 382-5346 l
l
J MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name:
McGuire. Unit 2 l
2.
Scheduled next refueling shutdown: September 1997 3.
Scheduled restart following refueling: December 1997 THE PROJECT MANAGER liAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 TliROUGli 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification cliange or otherlicense amendment?
If yes, what will these be?
l If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
l 7.
Number of Fuel assemblies (a) in the core:,191 j
(b) in the spent fuel pool: 969 8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase: -
l 9.
Projected date oflast refueling which can be accommodated by present license capacity:
December 2003 DUKE POWER COMPANY DATE: August 15.1996 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 i
i 4
i l
._