ML20116M293

From kanterella
Jump to navigation Jump to search
Forwards Summary Analysis of as-found Containment Leakage from Local Leak Rate Test & Suppl Data,Per NRC Request
ML20116M293
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/25/1985
From: Mcdonald R
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
NUDOCS 8505060172
Download: ML20116M293 (27)


Text

Mriting Addr:ss Alabama Power Company 600 North 18th Street Post Office Box 2641 Bemingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintridge Building

/\\labama Power April 25, 1985 Docket No. 50-348 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Attention:

Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Unit 1 Reactor Containment Building Integrated Leak Rate Test Supplement Gentlemen:

Alabama Power Company submitted the report of the April 1984 Unit 1 periodic integrated leak rate test and a sumary analysis of the final results of the local leak rate tests, which were performed since the previous integrated leak rate test, by letter dated July 1.5, 1984. The NRC Staff requested that a supplement to the report be submitted which would contain a summary of the as-found containment leakage derived from the local leak rate tests. Attachment 1 is a summary analysis of the as-found containment leakage from the local leak rate tests, as requested; and contains the data for these same local leak rate tests.

If there are any further questions, please advice.

Yours truly, j

R. P. Mcdonald RPM /CJS:gri-02 Attachments I

O[

l cc:

Mr. L. B. Long Dr. J. N. Grace Mr. E. A. Reeves t ii Mr. W. H. Bradford g5060172850425 p

ADOCK 05000348 PDR

ATTACHMENT 1 As-Found - Local Leak Rate Test (LLRT) Summary for 3rd Refueling Outage February 23, 1982 Electrical Penetration Total 25.0 sccm Type B Test (Less Electrical Pen.)

639.8 sccm Type C Test Total (Valves in Series) 838.4 sccm Total LLRT Leakage 1,503.2 sccm Maximum Allowable Leakage (.6La) = 151,058.9 sccm 1,503.2 sccm = 0.99% of Allowable Leakage As-Found - Local Leak Rate Test (LLRT) Summary for 4th Refueling Outage March 21, 1983 Electrical Penetration Total 11.9 sccm

  • Type B Test (Less Electrical Pen.)

1,996.4 sccm **

Type C Test Total (Valves in Series) 11,097.5 sccm ***

Total LLRT Leakage 13,105.8 sccm Maximum Allowable Leakage (.6L ) = 151,058.9 sccm a

13,105.8 sccm = 8.68% of Allowable Leakage WBII Outer Seal Leakage of 347,792 sccm not included since inner seal had had no observable leakage.

Containment Auxiliary Access Hatch Inner Seal Leakage of 100,622 sccm not included since outer seal leakage is included in total.

If Containment l

Auxiliary Access Hatch Inner Seal Leakage is included, total leakage =

113,727.8 sccm which is = 75.29% of Allowable Leakage.

Penetration #61B leakage was off-scale (i.e., > 20,000) on instrumentation available at the time of the test.

Subsequent to the 4th Refueling Outage, instrumentation has been procured to detect leakage up to 300,000 sccm.

Assuming that Penetration #61B was leaking at 5 times the instrument reading capacity of 20,000 sccm, Penetration #61B leakage = 100,000 sccm.

New total leakage, excluding Containment Auxiliary Access Hatch Inner Seal leakage, is 113,105.8 scem = 74.87% of Allowable Leakage.

As-Found - Local Leak Rate Test (LLRT) Summary for 5th Refueling Outage April 18,1984 Electrical Penetration Total 43.7 sccm Type B Test (Less Electrical Pen.)

10,099.6 sccm i

Type C Test Total (Valves in Series) 2,632.3 sccm Total LLRT Leakage 12,775.6 scc:n Maximum Allowable Leakage (.6La) = 151,058.9 sccm 12,775.6 sccm = 8.46% of Allowable Leakage.

l

Summary Data Of Unit i Local Leak Rate Tests Performed From The Unit 1 Containment Integrated Leak Rate Test Of 1981 Through The Unit 1 Containment Integrated Leak Rate Test Of 1984 i

l Contents Unit 1 - Type C Test Summary - 3rd Refueling 1

i Unit 1 - Type B Test Summary - 3rd Refueling Unit 1 - Type C Test Summary - 4th Refueling Unit 1 - Type B Test Summary - 4th Refueling Unit 1 - Type C Test Summary - 5th Refueling Unit 1 - Type B Test Summary - 5th Refueling i

i I

't l

,i 2

l t

I 1

-,r-e+~,-.,.-v,--c,,

r y w m,

..,, _..,.,+.,...,_,.,moy__

_,7_

,,y_,., _.., _ _ _ _ _ _,,,,. _

m

O UNIT 1 - TYPE C TEST

SUMMARY

FOR 3rd REFUELING AS FOUND #

PENE.

AS FOUND MIN. PATH AS LEFT MAX. AS NO.

VALVE NO.

DATE LEAKAGE LEAKAGE DATE LEAKAGE LEFT LEAKAGE 4

(SCCM)

(SCCM)

(SCCM)

PER PENE.

10 Q1E11V025A 10/03/81 191.70*

10/03/81 191.70*

Q1E11V026A 10/03/81 191.70*

95.90 10/03/81 191.70*

191.70 11 Q1E11V025B 10/04/81 28.90*

10/04/81 28.90*

Q1E11V026B 10/04/81 28.90*

14.45 10/04/81 28.90*

28.90 12 Q1P13V281 10/09/81 16.20*

10/09/81 16.20*

Q1P13V282 10/09/81 16.20*

10/09/81 16.20*

Q1P13V289 10/09/81 16.20*

10/09/81 16.20*

Q1P13V290 10/09/81 16.20*

8.10 10/09/81 16.20*

16.20

)

13 Q1P13V283 10/04/81 21.80*

10/04/81 21.80*

Q1P13V284 10/04/81 21.80*

10/04/81 21.80*

Q1P13V292 10/04/81 21.80*

10/04/81 21.80*

Q1P13V291 10/04/81 21.80*

10.90 10/04/81 21.80*

21.80 j

16 Q1E11V001A 10/08/81 2.60 2.60 10/08/81 2.60 2.60 18 Q1E11V001B 10/06/81 25.40 25.40 10/06/81 25.40 25.40 23 Q1E21V254 10/07/81 1.90 10/07/81 1.90 I

Q1E21V253A 10/07/81 1.90*

10/07/81 1.90*

l Q1E21V253B 10/07/81 1.90*

10/07/81 1.90*

Q1E21V253C 10/07/81 1.90*

0.95 10/07/81 1.90*

1.90 i

24 Q1E21V257 11/13/81 1.00 11/13/81 1.00 Q1E21V258 11/13/81 1.60 11/13/81 1.60 Q1E21V119 11/13/81 0.50 0.50 11/13/81 0.50 1.60 25 Q1E21V115B 10/14/81 2.20 2.20 10/14/81 2.20 2.20 26 Q1E21V115C 10/06/81 1.90 1.90 10/06/81 1.90 1.90

  1. Maximum leakage from inside to outside containment throuah a penetration with all containment isolation valves for that penetration closed by normal operation.
  • Values represent total leakage from group sets of valves as physically tested.

PAGE 1

UNIT 1 - TYPE C TEST

SUMMARY

FOR 3rd REFUELING AS FOUND #

PENE.

AS FOUND MIN. PATH AS LEFT MAX. AS NO.

VALVE NO.

DATE LEAKAGE LEAKAGE DATE LEAKAGE LEFT LEAKAGE (SCCM)

(SCCM)

(SCCM)

PER PLNE.

27 Q1E21V115A 12/16/81 0.50 0.50 12/16/81 0.50 0.50 28 Q1E21V213 10/07/81 2.50 10/07/81 2.50 Q1E21V249A 10/07/81 2.50 10/07/81 2.50 Q1E21V249B 10/07/81 2.40 2.40 10/07/81 2.40 2.50 29 Q1E21V049 10/03/81 0.60 10/03/81 0.60 Q1E21V050 10/03/81 0.00 0.00 10/03/81 0.00 0.60 30 Q1B13V040 10/03/81 7.90 10/03/81 7.90 Q1B13V038 10/03/81 7.50 7.50 10/03/81 7.50 7.90 31 Q1G21V005 10/05/81 8.90 10/05/81 8.90 Q1G21V006 10/05/81 189.00 10/05/81 189.00 Q1G21V064 10/05/81 1.60 8.90 10/05/81 1.60 189.00 32 Q1P16V072 10/05/81 18.90 10/05/81 18.90 Q1P16V081 10/05/81 35.00 18.90 10/05/81 35.00 35.00 33 Q1GHV3380 10/05/81 53.00 10/05/81 53.00 Q1G21V204 10/05/81 Off Scale 53.00 12/31/81 243.00 243.00 42 Q1P17V083 10/04/81 5.00 10/04/81 5.00 Q1P17V082 10/04/81 127.40 5.00 10/04/81 127.40 127.40 43 Q1P17HV3045 10/04/81 325.00 10/04/81 325.00 Q1P17HV3184 10/04/81 1.00 1.00 10/04/81 1.00 325.00 44 Q1P17V097 10/04/81 Off Scale 12/01/81 1.50 Q1P17V099 10/04/81 339.00 339.00 10/04/81 339.00 339.00 45 Q1P17HV3095 10/06/81 18.10 10/06/81 18.10 Q1P17V159 10/06/61 6.50 6.50 10/06/81 6.50 18.10 46 Q1P17HV3443 10/06/81 14.00 10/06/81 14.00 Q1P17HV3067 10/06/81 1.10 1.10 10/06/81 1.10 14.00

  1. Maximum leakage from inside to outside containment through a penetration with all containment isolation valves for that penetration closed by normal operation.

PAGE 2

UNIT I - TYPE C TEST

SUMMARY

FOR 3rd REFUELING AS FOUND PENE.

AS FOUND MIN. PATH AS LEFT MAX. AS NO.

VALVE NO.

DATE LEAKAGE LEAKAGE DATE LEAKAGE LEFT LEAKAGE (SCCM)

(SCCM)

(SCCM)

PER PENE.

47 Q1P18V001 10/10/81 1.80*

10/10/81 1.80*

Q1P18V002 10/10/81 1.80*

0.90 10/10/81 1.80*

1.80 48 Q1P19HV3611 10/10/81 0.70 10/10/81 0.70 91P19V002 10/10/81 Off Scale 0.70 01/06/82 164.50 164.50 49 Q1E21V052 10/05/81 13.10 10/05/81 13.10 Q1E21V091 10/05/81 11.20 11.20 10/05/81 11.20 13.10 50 Q1P15HV3766 10/05/81 1.90 10/05/81 1.90 Q1P15HV3334 10/05/81 2.40 1.90 10/05/81 2.40 2.40 54 Q1E14V002 10/07/81 20.10 10/07/81 20.10 Q1E14HV3658 10/07/81 13.00 13.00 10/07/81 13.00 20.10 55 Q1E14V001 10/08/81 16.40 10/08/81 16.40 Q1E14HV3657 10/08/81 3.00 3.00 10/08/81 3.00 16.40 56 Q1P15HV3104 10/09/81 2.5 10/09/81 2.50 Q1P15HV3331 10/09/81 2.3 2.30 10/09/81 2.30 2.50 57 Q1P15HV3103 10/09/81 2.60 10/09/81 2.60 Q1P15HV3332 10/09/81 2.60 1.30 10/09/81 2.60 2.60 1

58 Q1P15HV3765 10/09/81 0.90 10/09/81 0.90 Q1P15HV3333 10/09/81 1.10 0.90 10/09/81 1.10 1.10 59 Q1B13V054 11/04/81 0.00 11/04/81 0.00 Q1E11V039A 11/04/81 0.00 11/04/81 0.00 Q1E11V039B 11/04/81 48.50 11/04/81 48.50 Q1E11V040 11/04/81 25.90 11/04/81 25.90 Q1E21V263A 11/04/81 22.30 11/04/81 22.30 Q1E21V263B 11/04/81 28.30 0.00 11/04 28.30 48.50

  1. Maximum leakage from inside to outside containment through a penetr: tion with a/81 ll containment isolation valves for that penetration closed by normal operation.
  • Values represent total leakage from group sets of valves as physically tested.

PAGE 3

UNIT 1 - TYPE C TEST

SUMMARY

FOR 3rd REFUELING AS FOUND PENE.

AS FOUND MIN. PATH AS LEFT MAX. AS NO.

VALVE NO.

DATE LEAKAGE LEAKAGE DATE LEAKAGE LEFT LEAKAGE (SCCM)

(SCCM)

(SCCM)

PER PENE.

60 Q1P16V071 11/12/81 14.70 11/12/81 14.70 Q1P16V075 11/12/81 0.00 0.00 11/12/81 0.00 14.70 61A Q1E23V022C 10/08/81 1.20*

10/08/81 1.20*

Q1E23V022D 10/08/81 1.20*

10/08/81 1.20*

Q1E23V023B 10/08/81 1.20*

0.60 10/08/81 1.20*

1.20 61B Q1E23V024B 10/08/81 2.00*

10/08/81 2.00*

Q1E23V025B 10/08/81 2.00*

1.00 10/08/81 2.00*

2.00 62 Q1G21V082 10/09/81 2.10 10/09/81 2.10 Q1G21V001 10/09/81 4.50 2.10 10/09/81 4.50 4.50 63 Q1E21V058 10/09/81 3.80 10/09/81 3.80 Q1E21V059 10/09/81 2.80 2.80 10/09/81 2.80 2.80 64A Q1B13V037 10/09/81 0.90 10/09/81 0.90 Q1B13V039 10/09/81 1.40 0.90 10/09/81 1.40 1.40 64B Q1B13V026A 10/09/81 2.00 10/09/81 2.00 Q1B13V026B 10/09/81 1.90 1.90 10/09/81 1.90 2.00 66 Q1E23V025A 10/08/81 14.10*

10/08/81 14.10*

Q1E23V024A 10/08/81 14.10*

7.05 10/08/81 14.10*

14.10 67 Q1E23V022A 10/08/81 2.00*

10/08/81 2.00*

Q1E23V023A 10/08/81 2.00*

10/08/81 2.00*

Q1E23V022B 10/08/81 2.00*

1.00 10/08/81 2.00*

2.00 70 Q1E14V003 10/08/81 4.20 10/08/81 4.20 Q1E14V004 10/08/81 Off Scale 4.20 12/07/81 5.60 5.60 71 Q1P23V002A 10/03/81 90.00 90.00 10/03/81 90.00 90.00

  • Values represent total leakage from group sets of valves as physically tested.
  1. Maximum leakage from inside to outside containment through a penetration with all containment isolation valves for that penetration closed by normal operation.

f PAGE 4

UNIT 1 - TYPE C TEST

SUMMARY

FOR 3rd REFUELING AS FOUND PENE.

AS FOUND MIN. PATH AS LEFT MAX. AS NO.

VALVE NO.

DATE LEAKAGE LEAKAGE DATE LEAKAGE LEFT LEAKAGE (SCCM)

(SCCM)

(SCCM)

PER efNE.

72 Q1P23V002B 10/03/81 60.90 60.90 10/03/81 60.90 60.90 78 Q1G21HV3377 10/07/81 2.00 10/07/81 2.00 Q1G21HV3376 10/07/81 1.90*

10/07/81 1.90*

Q1G21V291 10/07/81 1.90*

1.90 10/07/81 1.90*

2.00 82 Q1P11V001 10/07/81 19.30 10/07/81 19.30 Q1P11V002 10/07/81 3.90 3.90 10/07/81 3.90 19.30 93 Q1E13V003A 10/03/81 19.70*

10/03/81 19.70*

Q1E13V004A 10/03/81 19.70*

9.85 10/03/81 19.70*

19.70 94 Q1E13V003B 10/03/81 0.00*

10/03/81 0.00*

Q1E13V004B 10/03/81 0.00*

0.00 10/03/81 0.00*

0.00 95 Q1G31V012 10/07/81 22.00 10/07/81 22.00 Q1G31V013 10/07/81 4.50 4.50 10/07/81 4.50 22.00 97B QIP19V004 10/09/81 2.70 10/09/81 2.70 Q1P19HV2228 10/09/81 9.80 2.70 10/09/81 9.80 9.80 103 Q1E23V002 10/08/81 2.40*

10/08/81 2.40*

Q1E23V003 10/08/81 2.40*

1.20 10/08/81 2.40*

2.40 0 Maximum leakage from inside to outside containment through a penetration with all containment isolation valves for that penetration closed by normal operation.

  • Values represent total leakage from group sets of valves as physically tested.

PAGE 5

O UNIT 1 TYPE B TEST

SUMMARY

- 3rd REFUELING AS FOUND AS LEFT N0ZZLE LEAKAGE LEAKAGE NO.

TPNS NO.

DATE (SCCM)

DATE (SCCM)

EA01 Q1T52A003-A 10/10/81 0.00 0.00 EA02 Q1T52A004-A 10/12/81 0.34 0.34 EA03 Q1T52B014-A 10/10/81 0.00 0.00 EA05 Q1T52B001-A 10/10/81 0.00 0.00 EA06 Q1T52B005-A 10/10/81 18.37 11/16/81 0.07 EA09 Q1T52B002-A 10/10/81 0.00 0.00 EA10 Q1T52A001-A 10/10/81 0.00 0,00 EAll Q1T52A002-A 10/10/81 0.00 0.00 EB01 Q1T52B019-A 10/13/81 0.07 0.07 EB05 Q1T528007-A 10/10/81 0.34 0.34 EB09 Q1T52B006-A 10/13/81 0.34 01/07/82 0.03 EC01 Q1T52B013-1 10/10/81 0.00 0.00 EC03 Q1T52B012-1 10/10/81 0.00 0.00 EC07 Q1T52B009-A 10/12/81 0.00 0.00 EC08 Q1T52B010-4 10/10/81 0.00 0.00 EC10 Q1T528008-4 10/10/81 0.17 0.17 WA02 Q1T52B015-B 10/12/81 0.00 0.00 WA03 Q1T52B023-B 10/12/81 0.00 0.00 WA05 Q1T52B046-B 10/12/81 0.00 0.00 WA06 Q1T52B047-B 10/12/81 0.00 0.00 WA07 Q1T52A005-B 10/12/81 0.00 0.00 WA08 Q1T52A006-B 10/12/81 0.00 0.00 WA09 Q1T52B018-B 10/12/81 O.00 0.00 WA10 Q1T52B016-B 10/12/81 0.00 0.00

UNIT 1 TYPE B TEST

SUMMARY

- 3rd REFUELING AS FOUND AS LEFT N0ZZLE LEAKAGE LEAKAGE NO.

TPNS NO.

DATE (SCCM)

DATE (SCCM)

Wall Q1T52B017-B 10/12/81 0.00 0.00 WA21 Q1T52B032-N 10/12/81 0.07 0.07 WA22 Q1T52B033-N 10/12/81 0.00 0.00 WA23 Q1T52B034-N 10/12/81 0.03 0.03 WA24 Q1T52B035-N 10/12/81 3.40 3.40 WB03 Q1T52B020-B 10/13/81 0.00 0.00 WB07 Q1T52B022-B 10/12/81 0.00 0.00 WB09 Q1T52B025-B 10/12/81 0.00 0.00 WB11 Q1T52B038-B 10/13/81 0.24 12/02/81 0.10 WB21 Q1T52B037-N 10/12/81 0.07 0.07 WB24 Q1T52B039-N 10/12/81 0.17 0.17 WC01 Q1T52B026-3 10/12/81 0.00 0.00 WC03 Q1T52B024-3 10/12/81 0.00 0.00 WC05 Q1T52B028-3 10/12/81 0.17 0.17 WC07 Q1T52B030-2 10/12/81 0.00 0.00 WC08 Q1T52B011-B 10/12/81 0.99 0.99 WC09 Q1T52B042-2 10/12/81 0.14 0.14 WC11 Q1T52B031-2 10/12/81 0.10 0.10 WC21 Q1T52B040-N 10/12/81 0.00 0.00 WC23 Q1T52B041-N 10/12/81 0.00 0.00 1

L

UNIT 1 TYPE B TEST

SUMMARY

- 3rd REFUELING AS FOUND AS LEFT PENETRATION LEAKAGE LEAKAGE NO.

TPNSL DATE (SCCM)

DATE (SCCM) 84 Equipment Hatch 02/09/82 12.80 12.80 86 Personnel Lock 02/05/82 608.00 02/14/82 9.04 Interior 86 Personnel Lock 02/17/82 0.00 0.00 Outer Door Between Seals 4

87 Aux Access Lock 02/23/82 0.00 0.00

^

Outer Door Between Seals 87 Aux Access Lock 02/14/82 9.42 9.42 Volume Setween Doors j'

14 Fuel Transfer 12/30/81 0.50 0.50 Tube - Bellows 14 Fuel Transfer 01/18/82 9.10 9.10 Tube Blind Flange I

J 5

I UNIT 1 - TYPE C TEST

SUMMARY

FOR 4th REFUELING AS FOUND #

PENE.

AS FOUND MIN. PATH AS LEFT MAX. AS No.

VALVE NO.

DATE LEAKAGE LEAKAGE DATE LEAKAGE LEFT LEAKAGE (SCCM)

(SCCM)

(SCCM)

PER PENE.

10 Q1E11V025A 02/03/83 49.10*

02/03/83 49.10*

Q1E11V026A 02/03/83 49.10*

24.55 02/03/83 49.10*

49.10 11 Q1E11V025B 01/25/83 4.00*

01/25/83 4.00*

Q1E11V026B 01/25/83 4.00*

4.00 01/25/83 4.00*

4.00 12 Q1P13V281 01/27/83 3108.00*

02/25/83 18.50*

Q1P13V282 01/27/83 3108.00*

02/25/83 18.50*

Q1P13V301 01/27/83 3108.00*

02/25/83 18.50*

Q1P13V302 01/27/83 3108.00*

1554.00 02/25/83 18.50*

18.50 13 Q1P13V283 02/26/83 4.60*

02/26/83 4.60*

Q1P13V284 02/26/83 4.60*

02/26/83 4.60*

Q1P13V303 02/26/83 4.60*

02/26/83 4.60*

Q1P13V304 02/26/83 4.60*

2.30 02/26/83 4.60*

4.60 16 Q1E11V001A 02/02/83 4.50 4.50 02/02/83 4.50 4.50 18 Q1E11V001B 01/25/83 14.20 14.20 01/25/83 14.20 14.20 23 Q1E21V254 01/26/83 9.20 01/26/83 9.20 Q1E21V253A 01/25/83 22.50*

01/25/83 22.50*

Q1E21V253B 01/25/83 22.50*

01/25/83 22.50*

Q1E21V253C 01/25/F3 22.50*

9.20 01/25/83 22.50*

22.50 24 Q1E21V257 03/09/83 5.00 03/09/83 5.00 Q1E21V258 03/09/83 2.90 03/09/83 2.90 Q1E21V119 03/09/83 3.50 2.90 03/09/83 3.50 5.00 25 Q1E21V115B 01/25/83 13.20 13.20 01/25/83 13.es 13.20 26 Q1E21V115C 01/25/83 12.60 12.60 01/25/83 12.60 12.60 27 Q1E21V115A 01/25/83 129.00 129.00 01/25/83 129.00 129.00

  • Values represent total leakage from group sets of valves as physically tested.
  1. Maximum leakaoe from inside to outside containment through a penetration with all containment isolation valves for that penetration closed by normal operation.

PAGE 1

UNIT 1 - TYPE C TEST

SUMMARY

FOR 4th REFUELING AS FOUND #

PENE.

AS FOUND MIN. PATH AS LEFT MAX. AS NO.

VALVE NO.

DATE LEAKAGE LEAKAGE DATE LEAKAGE LEET LEAKAGE (SCCM)

(SCCM)

(SCCM)

PER PENE.

28 Q1E21V213 01/27/83 27.50*

01/27/83 27.50*

Q1E21V249A 01/27/83 27.50*

01/27/83 27.50*

Q1E21V249B 01/27/83 42.60 27.50 01/27/83 42.60 42.60 29 Q1E21V049 01/19/83 5.90 01/19/83 5.90 Q1E21V050 01/19/83 9.20 5.90 01/19/83 9.20 9.20 30 Q1B13V040 01/25/83 42.40 01/25/83 42.40 Q1B13V038 01/25/83 71.80 42.40 01/25/83 71.80 71.80 31 Q1G21V005 01/26/83 26.60 01/26/83 26.60 Q1G21V006 01/26/83 35.60 01/26/83 35.60 Q1G21V064 01/26/83 Off Scale 26.60 02/8/83 4.30 35.60 32 Q1P16V072 01/24/83 403.00 01/25/83 209.00 Q1P16V081 01/24/83 93.00 93.00 01/24/83 93.00 209.00 33 Q1G21HV3880 02/16/83 8.50 02/16/83 8.50 Q1G21V204 02/16/83 366.00 8.50 02/16/83 366.00 366.00 42 Q1P17V083 01/22/83 107.50 01/22/83 107.50 Q1P17V082 01/22/83 0.30 0.30 01/22/83 0.30 107.50 43 Q1P17HV3045 01/25/83 32.20 01/25/83 32.20 Q1P17HV3184 01/25/83 19.20 19.20 01/25/83 19.20 32.20 44 Q1P17V097 01/22/83 31.30 01/22/83 31.30 Q1P17V099 01/22/83 28.40 28.40 01/22/83 28.40 31.30 45 Q1P17HV3095 01/25/83 Off Scale 02/11/83 419.20 Q1P17V159 01/25/83 90.00 90.00 01/25/83 90.00 419.20 46 Q1P17HV3443 01/22/83 5.20 01/22/83 5.20 Q1P17HV3067 01/22/83 61.40 5.20 01/22/83 61.40 61.40

  • Values represent total leakage from group sets of valves as physically tested.
  1. Maximum leakage from inside to outside containment through a penetration with all containment isolation valves for that penetration closed by normal operation.

PAGE 2

UNIT 1 - TYPE C TEST

SUMMARY

FOR 4th REFUELING AS FOUND #

PENE.

AS FOUND MIN. PATH AS LEFT MAX. AS NO.

VALVE NO.

DATE LEAKAGE LEAKAGE DATE LEAKAGE LEFT LEAKAGE (sccM)

(sccM)

(scCM)

PER PENE.

4 i

47 Q1P18V001 03/14/83 33.30*

03/14/83 33.30*

Q1P18V002 03/14/83 33.30*

16.65 03/14/83 33.30*

33.30

)

48 Q1P19HV3611 02/23/83 5.00 02/23/83 5.00 Q1P19V002 02/23/83 Off Scale 5.00 02/25/83 21.50 21.50 49 Q1E21V052 01/19/83 7.70 01/19/83 7.70 Q1E21V091 01/19/83 7.10 7.10 01/19/83 7.10 7.70 50 Q1P15HV3766 01/19/83 7.50 01/19/83 7.50 Q1P15HV3334 01/19/83 6.40 6.40 01/19/83 6.40 7.50 54 Q1E14V002 01/21/83 581.00 02/14/83 6.10 j

Q1E14HV3658 01/21/83 4.20 4.20 02/15/83 69.60 69.60 55 Q1E14V001 01/21/83 Off Scale 02/02/83 44.60 Q1E14HV3657 01/21/83 30.73 30.73 01/21/83 30.73 44.60 56 Q1P15HV3104 01/24/83 6.40 01/24/83 6.40 Q1P15HV3331 01/24/83 18.40 6.40 01/24/83 18.40 18.40 1

57 Q1P15HV3103 01/24/83 26.50 01/24/83 26.50 Q1P15HV3332 01/24/83 17.90 17.90 01/24/83 17.90 26.50 l

58 Q1P15HV3765 02/01/83 4.40 02/01/83 4.40 Q1P15HV3333 02/01/83 5.20 4.40 02/01/83 5.20 5.20

^

59 Q1B13V054 02/25/83 11.40 02/25/83 11.40 Q1E11V039A 02/26/83 5.00*

02/26/83 5.00*

Q1E11V039B 02/26/83 5.00*

02/26/83 5.00*

Q1E11V040 02/26/83 5.00*

02/26/83 5.00*

Q1E21V263A 02/26/83 5.00*

02/26/83 5.00*

Q1E21V263B 02/26/83 5.00*

5.00 02/26/83 5.00*

11.40

  • Values represent total leakage from group sets of valves as physically tested.

/l Maximum leakage from inside to outside containment through a penetration with all containment isolation valves for that penetration closed by normal operation.

PAGE 3

UNIT 1 - TYPE C TEST

SUMMARY

FOR 4th REFUELING

~

AS FOUND #

PENE.

AS FOUND MIN. PATH AS LEFT MAX. AS NO.

VALVE NO.

DATE LEAKAGE LEAKAGE DATE LEAKAGE LEFT LEAKAGE (SCCM)

(SCCM)

(SCCM)

PER PENE.

60 Q1P16V071 01/24/83 9.00 01/24/83 9.00 Q1P16V075 01/24/83 153.00 9.00 01/24/83 153.00 153.00 61A Q1E23V022C 01/19/83 16565.00*

01/31/83 7.40*

Q1E23V022D 01/19/83 16565.00*

01/31/83 7.40*

Q1E23V023B 01/19/83 16565.00*

8282.50 01/31/83 7.40*

7.40 61B Q1E23V024B 01/19/83 Off Scale

  • 02/03/83 8.40*

Q1E23V025B 01/19/83 Off Scale

  • Off Scale 1 02/03/83 8.40*

8.40 62 Q1G21V082 01/24/83 4.50 01/24/83 4.50 Q1G21V001 01/24/83 8.20 4.50 01/24/83 8.20 8.20 63 Q1E21V058 01/19/83 Off Scale 01/22/83 39.0u Q1E21V059 01/19/83 70.10 70.10 01/19/83 70.10 70.10 64A Q1B13V037 01/25/83 27.50 01/25/83 27.50 Q1B13V039 01/25/83 33.80 27.50 01/25/83 33.80 33.80 64B Q1B13V026A 01/22/83 3.50 01/22/83 3.50 Q1B13V026B 01/22/83 4.70 3.50 01/22/83 4.70 4.70 66 Q1E23V025A 01/19/83 6.40*

01/19/83 6.40*

Q1E23V024A 01/19/83 6.40*

3.20 01/19/83 6.40*

6.40 67 Q1E23V022A 01/18/83 14.30*

01/18/83 14.30*

Q1E23V023A 01/18/83 14.30*

01/18/83 14.30*

1 Q1E23V022B 01/18/83 14.30*

7.65 01/18/83 14.30*

14.30 70 Q1E14V003 01/19/83 82.10 01/19/83 82.10 Q1E14V004 01/19/83 Off Scale 82.10 02/03/83 0.80 82.10 71 Q1P23V002A 02/16/83 39.20 39.20 02/16/83 39.20 39.20

  • Values represent total leakage from group sets of valves as physically tested.

10ff Scale means beyond the range of the leak rate monitor, > 20,000 SCCH.

  1. Maximum leakage from inside to outside containment through a penetration with all containment isolation valves for that penetration closed by normal operation.

PAGE 4

l UNIT 1 - TYPE C TEST

SUMMARY

FOR 4th REFUELING

~

AS FOUND #

PENE.

AS FOUND MIN. PATH AS LEFT MAX. AS NO.

VALVE NO.

DATE LEAKAGE LEAKAGE DATE LEAKAGE LEFT LEAKAGE i

(SCCM)

(SCCM)

(SCCM)

PER PENE.

]

72 Q1P23V002B 02/16/83 10.60 10.60 02/16/83 10.60 10.60 i

78 Q1G21HV3377 03/12/83 4.20 03/12/83 4.20 Q1G21HV3376 03/12/83 4.60*

03/12/83 4.60*

Q1G21V291 03/12/83 4.60*

4.20 03/12/83 4.60*

4.60 1

82 Q1P11V001 01/26/83 146.30 01/26/83 146.30 I

Q1P11V002 01/26/83 12.40 12.40 01/26/83 12.40 146.30 3

93 Q1E13V003A 01/22/83 598.00*

01/22/83 598.00*

Q1E13V004A 01/22/83 598.00*

299.00 01/22/83 598.00*

598.00 94 Q1E13V003B 01/22/83 0.80*

01/22/83 0.80*

Q1E13V004B 01/22/83 0.80*

0.40 01/22/83 0.80*

0.80 95 Q1G31V012 01/19/83 28.61 01/19/83 28.61 Q1G31V013 01/18/83 13.20 13.20 01/18/83 13.20 28.61 l

97B Q1P19V004 01/18/83 9.20 01/18/83 9.20 j

Q1P19HV2228 01/19/83 4.00 4.00 01/19/83 4.00 9.20 1

j 103 Q1E23V002 01/19/83 6.50*

01/19/83 6.50*

l Q1E23V003 01/19/83 6.50*

3.25 01/19/83 6.50*

6.50 i

  1. Maximum leakage from inside to outside containment through a penetration with all containment isolation valves for that penetration closed by normal operation ~

1

  • Values represent total lealage from group sets of valves as physically tested.

I t

l PAGE 5

UNIT 1 TYPE B TEST

SUMMARY

- 4th REFUELING AS FOUND AS LEFT N0ZZLE LEAKAGE LEAKAGE NO.

TPNS NO.

DATE (SCCM)

DATE (SCCM)

EA01 Q1T52A003-A 01/12/83 0.204 0.204 EA02 Q1T52A004-A 01/12/83 0.238 0.238 EA03 Q1T52B014-A 01/12/83 0.714 0.714 EA05 Q1T52B001-A 01/12/83 0.170 0.170 EA06 Q1T52B005-A 01/12/83 0.270 0.270 EA09 Q1T52B002-A 01/12/83 0.238 0.238 EA10 Q1T52A001-A 01/12/83 0.270 0.270 EAll Q1T52A002-A 01/12/83 0.306 0.306 EB01 Q1T52B019-A 01/12/83 0.034 0.034 EB05 Q1T52B007-A 01/12/83 0.000 0.000 EB09 Q1T52B006-A 01/12/83 1.700 1.700 EC01 Q1T52B013-1 01/11/83 0.034 0.034 EC03 Q1T52B012-1 01/12/83 0.068 0.068 EC07 Q1T52B009-A 01/12/83 0.027 0.027 EC08 Q1T52B010-4 01/12/83 0.170 0.170 EC10 Q1T52B008-4 01/12/83 0.170 0.170 WA02 Q1T52B015-B 01/11/83 0.068 0.068 WA03 Q1T52B023-B 01/11/83 0.034 0.034 WA05 Q1T52B046-B 01/11/83 0.170 0.170 WA06 Q1T52B047-B 01/12/83 0.102 0.102 WA07 Q1T52A005-B 01/13/83 0.340 0.340 WA08 Q1T52A006-B 01/11/83 0.238 0.238 WA09 Q1T52B018-B 01/11/83 0.068 0.068 WA10 Q1T52B016-B 01/10/83 1.020 1.020

1 UNIT 1 TYPE B TEST

SUMMARY

- 4th REFUELING AS FOUND AS LEFT N0ZZII LEAKAGE LEAKAGE NO.

TPNS NO.

DATE (SCCM)

DATE (SCCM)

Wall Q1T52B017-B 01/10/83 0.034 0.034 WA21 Q1T52B032-N 01/10/83 0.000 0.000 WA22 Q1T52B033-N 01/10/83 0.340 0.340 WA23 Q1T52B034-N 01/10/83 0.170 0.170 WA24 Q1T52B035-N 01/10/83 3.060 3.060 WB03 Q1T52B020-B 01/11/83 0.034 0.034 WB07 Q1T52B022-B 01/11/83 0.170 0.170 WB09 Q1T52B025-B 01/11/83 0.170 0.170 WB11 Q1T52B038-B 01/12/83 347,792.000t 02/08/83 0.000 WB21 Q1T52B037-N 01/10/83 0.068 0.068 WB24 Q1T52B039-N 01/10/83 0.000 0.000 WC01 Q1T52B026-3 01/11/83 0.136 0.136 WC03 Q1T52B024-3 01/11/83 0.136 0.136 WC05 Q1T52B028-3 01/11/83 0.102 0.102 WC07 Q1T52B030-2 01/11/83 0.102 0.102 WC08 Q1T52B011-B 01/11/83 0.000 0.000 WC09 Q1T52B042-2 01/10/83 0.068 0.068 WC11 Q1T52B031-2 01/10/83 0.102 0.102 WC21 Q1T52B040-N 01/10/83 0.238 0.238 WC23 Q1T52B041-N 01/10/83 0.270 0.270 e

tThis penetration was determined to be leaking through the outer penetration seal. No leakage through the inner seal was observed.

b

UNIT 1 TYPE B TEST

SUMMARY

- 4th REFUELING AS FOUND AS LEFT PENETRATION LEAKAGE LEAKAGE NO.

TPNS DATE (SCCM)

DATE (SCCM) 84 Equipment Hatch 03/17/83 1785.00 1785.00 86 Personnel Lock 03/15/83 4.50 09/14/83 0.30 Interior 86 Personnel Lock 03/18/83 0.00 0.00 Outer Door Between Seals 87 Aux Access Lock 03/18/83 0.00 0.00 Outer Door Between Seals 87 Aux Access Lock 03/18/83 100,622.00*

03/18/83 4.30 Volume Between Doors 14 Fuel Transfer 03/14/83 2.90 2.90 Tube - Bellows 14 Fuel Transfer 03/14/83 204.00 204.00 Tube Blind Flange Containment Auxiliary Access Hatch Inner Seal Leakage of 100,622 SCCM should not be included in total As-found Containment Leakage since Outer Seal Leakage (penetration 87) is included in Total.

L

~

UNIT 1 - TYPE C TEST

SUMMARY

FOR Sth REFUELING AS FOUND #

PENE.

AS FOUND MIN. PATH AS LEFT MAX. AS NO.

VALVE NO.

DATE LEAKAGE LEAKAGE DATE LEAKAGE LEFT LEAKAGE (SCCM)

(SCCM)

(SCCM)

PER PENE.

10 Q1E11V025A 03/05/84 229.00*

03/05/84 229.00*

Q1E11V026A 03/05/84 229.00*

114.50 03/05/84 229.00*

229.00 11 Q1E11V025B 02/27/84 3.80*

02/27/84 3.80*

Q1E11V026B 02/27/84 3.80*

1.90 02/27/84 3.80*

3.80 12 Q1P13V282 03/03/84 Off Scale

  • 03/14/84 110.00*

Q1P13V301 03/03/84 off Scale

  • 03/14/84 110.00*

Q1P13V281 03/03/84 Off Scale

  • 03/14/84 110.00*

Q1P13V302 03/03/84 Off Scale

  • 110.001 03/14/84 110.00*

110.00 13 Q1P13V283 03/02/84 Off Scale

  • 03/15/84 438.00*

Q1P13V284 03/02/84 Off Scale

  • 03/15/84 438.00*

Q1P13V304 03/02/84 Off Scale

  • 03/15/84 438.00*

Q1P13V303 03/02/84 Off Scale

  • 438.001 03/15/84 438.00*

438.00 16 Q1E11V001A 03/05/84 74.70 74.70 03/95/84 74.70 74.70 18 Q1E11V001B 02/27/84 17.30 17.30 02/27/84 17.30 17.30 23 Q1E21V253A 03/05/84 5.30*

03/05/84 5.30*

Q1E21V253B 03/05/84 5.30*

03/05/84 5.30*

Q1E21V253C 03/05/84 5.30*

03/05/84 5.30*

Q1E21V254 03/05/84 21.30 5.30 03/05/84 21.30 21.30 24 Q1E21V257 02/29/84 66.40 02/29/84 66.40 Q1E21V258 02/29/84 59.30 02/29/84 59.30 Q1E21V119 02/29/84 61.40 59.30 02/29/84 61.40 66.40 25 Q1E21V115B 02/16/84 14.30 14.30 02/16/84 14.30 14.30

  1. Maximum leakage from inside to outside containment thrcugh a penetration with all containment isolation valves for that penetration closed by normal operation.
  • Values represent total leakage from group sets of valves as physically tested.

1Primary leakage was represented by one valves, therefore, Minimum Leakage was determined to be as written after repair-ing valve.

PAGE 1

UNIT 1 - TYPE C TEST

SUMMARY

FOR Sth REFUELING AS FOUND FENE.

AS FOUND MIN. PATH AS LEFT MAX. AS NO.

VALVE NO.

DATE LEAKAGE LEAKAGE DATE LEAKAGE LEFT LEAKAGE (SCCM)

(SCCM)

(SCCM)

PER PENE.

26 Q1E21V115C 02/16/84 20.10 20.10 02/16/84 20.10 20.10 27 Q1E21V115A 02/16/84 99.20 99.20 02/16/84 99.20 99.20 28 Q1E21V249A 02/16/84 21.60 02/16/84 21.60 l

Q1E21V213 02/16/84 21.60 02/16/84 21.60

(

Q1E21V249B 02/16/84 25.40 21.60 02/16/84 25.40 25.40 29 Q1E21V049 02/14/84 12.40 02/14/84 12.40 l

Q1E21V050 02/14/84 13.60 12.40 02/14/84 13.60 13.60 i

30 Q1B13V040 02/15/84 79.70 02/15/84 79.70 Q1B13V038 02/15/84 80.70 79.70 02/15/84 80.70 80.70 l

31 Q1G21V005 02/16/84 25.20 02/16/84 25.20 Q1G21V006 02/16/84 7.90 02/16/84 7.90 Q1G21V064 02/16/84 Off Scale 7.90 02/26/84 16.60 25.20 l

l 32 Q1P16V072 02/16/84 194.30*

02/16/84 194.30*

Q1P16V081 02/16/84 194.30*

97.15 02/16/84 194.30*

194.30 33 Q1G21HV3880 03/31/84 6.80 03/31/84 6.80 Q1G21V204 03/31/84 Off Scale 6.80 04/03/84 293.00 293.00 42 Q1P17V083 02/29/84 117.00 02/29/84 117.00 Q1P17V082 02/29/84 6.00 6.00 02/29/84 6.00 117.00 43 Q1P17HV3045 02/27/84 Off Scale 03/20/84 21.60 Q1P17HV3184 02/27/84 67.00 67.00 02/27/84 67.00 67.00 44 Q1P17V097 02/27/84 Off Scale 03/09/84 29.00*

2 Q1P17V099 02/27/84 Off Scale 29.00 03/09/84 29.00*

29.00

  • Values represent total leakage from group sets of valves as physically tested.

2V097's leak was Off Scale, which is also V099 boundary valve, therefore, Minimum Leakage determined after V097 was repaired.

  1. Maximum leakage from inside to outside containment through a penetration with all containment isolation valves for that penetration closed by riormal operation.

PAGE 2

e a

UNIT 1 - TYPE C TEST

SUMMARY

FOR Sth REFUELING AS FOUND PENE.

AS FOUND MIN. PATH AS LEFT MAX. AS NO.

VALVE NO.

DATE LEAKAGE LEAKAGE DATE LEAKAGE LEFT LEAKAGE (SCCM)

(SCCM)

(SCCM)

PER PENE.

45 Q1P17HV3095 02/26/84 Off Scale 03/05/84 214.00 Q1P17V159 02/26/84 303.50 303.50 02/26/84 303.50 303.50 46 Q1P17HV3443 02/27/84 101.30 02/27/84 101.30 Q1P17HV3067 02/27/84 82.20 82.20 02/27/84 82.20 101.30 47 Q1P18V001 03/20/84 53.00*

03/20/84 53.00*

Q1P18V002 03/20/84 53.00*

26.50 03/20/84 53.00*

53.00 48 Q1P19HV3611 03/02/84 15.00 03/02/84 15.00 Q1P19V002 03/02/84 57.40 15.00 03/02/84 57.40 57.40 49 Q1E21V052 02/13/84 6.30 02/13/84 6.30 Q1E21V091 02/13/84 10.40 6.30 02/13/84 10.40 10.40 50 Q1P15HV3766 02/13/84 3.50 02/13/84 3.50 Q1P15HV3334 02/13/84 3.70 3.50 02/13/84 3.70 3.70 54 Q1E14V002 03/19/84 4.10 03/19/84 4.10 Q1E14HV3658 03/19/84 8.50 4.10 03/19/84 8.50 8.50 55 Q1E14HV3657 03/19/84 4.00 03/19/84 4.00 Q1E14V001 03/19/84 134.40 4.00 03/19/84 134.40 134.40 56 Q1P15HV3104 02/14/84 3.80 02/14/84 3.80 Q1P15HV3331 02/14/84 5.00 3.80 02/14/84 5.00 5.00 57 Q1P15HV3103 02/15/84 27.00 02/15/84 27.00 Q1P15HV3332 02/15/84 13.80 13.80 02/15/84 13.80 27.00 58 Q1P15HV3765 02/18/84 14.20 02/18/84 14.20 Q1P15HV3333 02/18/84 24.80 14.20 02/18/84 24.80 24.80

  1. Maximum leakage from inside to outside containment through a penetration with all containment isolation valves for that penetration closed by normal operation.
  • Values represent total leakage from group sets of valves as physically tested.

PAGE 3

m

. =.

UNIT 1 - TYPE C TEST

SUMMARY

FOR 5th REFUELING AS FOUND #

PENE.

AS FOUND MIN. PATH AS LEFT MAX. AS NO.

VALVE NO.

DATE LEAKAGE LEAKAGE DATE LEAKAGE LEFT LEAKAGE (SCCM)

(SCCM)

(SCCM)

PER PENE.

59 Q1B13V039B 03/08/84 3.00*

03/08/84 3.00*

Q1E11V039A 03/08/84 3.00*

03/08/84 3.00-Q1E11V263A 03/08/84 3.00*

03/08/84 3.00*

Q1E11V263B 03/08/84 3.00*

03/08/84 3.00*

Q1E21V054 03/08/84 0.80 03/08/84 0.80 Q1E21V040 03/08/84 3.00*

0.80 03/08/84 3.00*

3.00 60 Q1P16V075 02/16/84 Off Scale 03/05/84 162.40 Q1P16V071 02/16/84 127.30 127.30 02/16/84 127.30 162.40 61A Q1E23V022C 02/15/84 30.00*

02/15/84 30.00*

Q1E23V022D 02/15/84 30.00*

02/15/84 30.00*

Q1E23V023B 02/15/84 30.00*

15.00 02/15/84 30.00*

30.00 61B Q1E23V024B 02/15/84 17.40*

02/15/84 17.40*

Q1E23V025B 02/15/84 17.40*

8.70 02/15/84 17.40*

17.40 62 Q1G21V082 02/17/84 19.30 02/17/84 19.30 Q1G21V001 02/17/84 19.60 19.30 02/17/84 19.60 19.60 63 Q1E21V058 02/14/84 893.70 03/09/84 140.00 Q1E21V059 02/14/84 170.20 170.20 02/14/84 170.20 170.20 64A Q1B13V037 02/13/84 19.50 02/13/84 19.50 Q1B13V039 02/13/84 37.50 19.50 02/13/84 37.50 37.50 64B Q1B13V026A 02/13/84 7.60 02/13/84 7.60 Q1B13V026B 02/13/84 4.60 4.60 02/13/84 4.60 7.60 66 Q1E23V025A 02/15/84 11.30*

02/15/84 11.30*

Q1E23V024A 02/15/84 11.30*

5.65 02/15/84 11.30*

11.30

  • Values represent total leakage from group sets of valves as physically tested.
  1. Maximum leakage from inside to outside containment through a penetration with all containment isolation valves for that penetration closed by normal operation.

PAGE 4

UNIT 1 - TYPE C TEST

SUMMARY

FOR 5th REFUELING AS FOUND #

PENE.

AS FOUND MIN. PATH AS LEFT MAX. AS NO.

VALVE NO.

DATE LEAKAGE LEAKAGE DATE LEAKAGE LEFT LEAKAGE (SCCM)

(SCCM)

(SCCM)

PER PENE.

67 Q1E23V022A 02/15/84 22.90*

02/15/84 22.90*

Q1E23V022B 02/15/84 22.90*

02/15/84 22.90*

Q1E23V023A 02/15/84 22.90*

11.45 02/15/84 22.90*

22.90 70 Q1E14V003 02/29/84 15.30 02/29/84 15.30 Q1E14V004 02/29/84 26.10 15.30 02/29/84 26.10 26.10 t

71 Q1P23V002A 04/02/84 35.00 35.00 04/15/84 57.60 57.60 72 Q1P23V002B 04/02/84 2.70 2.70 04/17/84 31.50 31.50 78 Q1G21HV3377 03/31/84 35.50 03/31/84 35.50 Q1G21V291 03/31/84 53.00*

03/31/84 53.00*

Q1G21HV3376 03/31/84 53.00*

35.50 03/31/84 53.00*

53.00 82 Q1P11HV3659 02/13/84 24.50 02/13/84 24.50 Q1P11V002 02/13/84 11.40 11.40 02/13/84 11.40 24.50 93 Q1E13V003A 02/22/84 715.10*

02/22/84 715.10*

Q1E13V004A 02/22/84 715.10*-

357.55 02/22/84 715.10*

715.10 94 Q1E13V003B 02/18/84 3.30*

02/18/84 3.30*

Q1E13V004B 02/18/84 3.30*

1.65 02/18/84 3.30*

3.30 95 Q1G31V012 02/14/84 15.50 02/14/84 15.50 Q1G31V013 02/13/84 13.30 13.30 02/13/84 13.30 15.50 97B Q1P19V004 02/13/84 7.20 02/13/84 7.20 Q1P19HV2228 02/13/84 7.60 7.20 02/13/84 7.60 7.60 103 Q1E23V002 02/18/84 22.30*

02/18/84 22.30*

Q1E23V003 02/18/84 22.30*

11.15 02/18/84 22.30*

22.30

  1. Maximum leakage from inside to outside containment through a penetration with all containment isolation valves for that penetration closed by normal operation.
  • Values represent total leakage from group sets of valves as physically tested.

PAGE 5

]

UNIT 1 TYPE B TEST

SUMMARY

- 5th REFUELING AS FOUND AS LEFT N0ZZLE LEAKAGE LEAKAGE NO.

TPNS NO.

DATE (SCCM)

DATE (SCCM)

EA01 Q1T52A003-A 02/16/84 0.068 0.068 EA02 Q1T52A004-A 02/17/84 1.020 1.020 EA03 Q1T52B014-A 02/16/84 0.068.

0.068 EA05 Q1T52B001-A 02/16/84 0.000 0.000 EA06 Q1T52B005-A 02/16/84 0.000 0.000 EA09 Q1T52B002-A 02/16/84 0.000 0.000 EA10 Q1T52A001-A 02/17/84 0.068 0.068 EAll Q1T52A002-A 02/17/84 1.020 1.020 EB01 Q1T52B019-A 02/15/84 0.000 0.000 EB05 Q1T52B007-A 02/17/84 0.000 0.000 EB09 Q1T52B006-A 02/16/84 0.000 0.000 EC01 Q1T523013-1 02/15/84 1.020 1.020 EC03 Q1T52B012-1 02/16/84 0.170 0.170 EC07 Q1T528009-A 02/17/84 0.000 0.000 EC08 Q1T52B010-4 02/16/84 2.380 2.380 EC10 Q1T52B008-4 02/16/84 0.000 0.000 WA02 Q1T52B015-B 02/15/84-0.000 0.000 WA03 Q1T52B023-B 02/15/84 0.000 0.000 l

WA05 Q1T52B046-B 02/14/84 0.544 0.544 WA06 Q1T52B047-B 02/14/84 0.000 0.000 WA07 Q1T52A005-B 02/15/84 0.442 0.442 l

l WA08 Q1T52A006-B 02/18/84 0.102 0.102 WA09 Q1T52B018-B 02/14/84 0.000 0.000 WA10 Q1T52B016-B 02/13/84 0.000 0.000 L

c, UNIT 1 TYPE B TEST

SUMMARY

- 5th REFUELING AS FOUND AS LEFT N0ZZLE LEAKAGE LEAKAGE NO.

TPNS NO.

DATE (SCCM)

DATE (SCCM)

Wall Q1T52B017-B 02/13/84 0.238 0.238 WA21 Q1T52B032-N 02/14/84 0.000 0.000 WA22 Q1T52B033-N 02/14/84 0.034 0.034 WA23 Q1T52B034-N 02/14/84 0.000 0.000 WA24 Q1T52B035-N 02/13/84 1.290 1.290 WB03 Q1T52B020-B 02/15/84 0.000 0.000 WB07 Q1T52B022-B 02/14/84 0.000 0.000 WB09 Q1T52B025-B 02/14/84 0.068 0.068 WB11 Q1T52B038-B 02/14/84 0.034 0.034 WB21 Q1T52B037-N 02/13/84 0.170 0.170 WB24 Q1T52B039-N 02/13/84 0.170 0.170 WC01 Q1T52B026-3 02/15/84 0.170 0.170 WC03 Q1T52B024-3 02/15/84 2.483 2.483 WC05 Q1T52B028-3 02/14/84 0.408 0.408 WC07 Q1T52B030-2 02/14/84 0.000 0.000 WC08 Q1T52B011-B 02/17/84 0.000 0.000 WC09 Q1T52B042-2 02/16/84 0.000 0.000 WC11 Q1T52B031-2 02/13/84 0.000 0.000 WC21 QIT52B040-N 02/13/84 16.660 03/16/84 0.140 WC23 Q1T52B041-N 02/13/84 0.170 0.170 WC02 Q1T52B053-B 03/20/84 0.018 0.018 03/26/84 10.500 10.500 EC05 EB10 Q1T52B052-4 03/20/84 0.195 0.195 l

03/26/84 4.200 4.200 l

EB04 l

03/26/84 0.000 0.000 EB02 l

r e

UNIT 1 TYPE B TEST

SUMMARY

- 5th REFUELING AS FOUND AS LEFT PENETRATION LEAKAGE LEAKAGE NO.

TPNS DATE (SCCM)

DATE (SCCM) 84 Equipment Hatch 04/11/84 30.55 30.55 86 Personnel Lock 04/10/84 6200.00 6200.00 Interior 86 Personnel Lock 0.00 0.00 Outer Door Between Seals 87 Aux Access Lock 0.00 0.00 Outer Door Between Seals 87 Aux Access Lock 04/10/84 354.00 354.00 Volume Between Doors 14 Fuel Transfer 04/08/84 3510.00 04/11/84 29.10 Tube - Bellows 14 Fuel Transfer 04/04/84 5.10 5.10 Tube Blind Flange