e DUKE POWER GOMPANY P.O. HOX 33180 CHARLOTTE, N.C. 28242 ILE H. TUCKER TELEPHONE vmm rasierouwt (704) 373-4NM April 30, 1985
= = u
-=o-Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention:
Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: Catawba Nuclear Station, Unit 2 Docket No. 50-414
Dear Mr. Denton:
By letter dated April 5, 1984, Duke Power Company subuitted a report entitled " Catawba Nuclear Station Extended Operation Tests and Inspections of Diesel Generators". This report, along with subsequent submittals, described the extensive test and inspection program that was carried out on the Catawba 1A and 1B diesels.
As a result of the completion of this program for the Catawba Unit I diesels, a test and inspection plan for the Catawba Unit 2 diesels has been developed. The preoperational testing on the 2A and 2B diesels will be conducted in accordance with FSAR Section 8.3.1.1.3.10.
This section will be updated to reflect the current Technical Specification references as noted in the attached marked-up FSAR page.
The quality revalidation inspection plan for both the Unit 2 engines is similar to that used for the inspection of the Catawba IB diesel engine.
The quality revalidation recommendations included in the TDI Diesel Generator Owners Group Design Review / Quality Revalidation Final Report have also been included in the Unit 2 inspection plan. As with the Unit I diesels, the inspection plan is submitted in tabular form showing the various inspections for each part and the size of the sample to be inspected. This inspection plan matrix is included as an attachment to this letter. Teardown and inspection of the 2A diesel started March 25, 1985, and is scheduled to be finished by July 1,1985. The 2B diesel inspection will start after the 2A diesel has been returned to service.
The majority of design review modifications recommended by the TDI Diesel Generator Owners Group Design Review / Quality Revalidation Final Report will be implemented on Unit 2.
These modifications also will be done on Unit 1.
Several other modifications are under engineering review
{5060 g4
\\ \\
Mr. Harold R. Denton, Director April 30, 1985 Page Two i
for both units. Action on these will not be implemented until review is completed. The review will be completed well in advance of the first refueling outage for both units so that sufficient time is allowed for appropriate action.
l Very truly yours.
lh Hal B. Tucker ROS: sib cc:
Dr. J. Nelson Grace, Regional Administrator U. S. Nuc1 car Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Catawba Nuclear Station Robert Guild, Esq.
P. O. Box 12097 Charleston, South Carolina 29412 Palmetto Alliance 213511 Devine Street Columbia, South Carolina 29205 Mr. Jesse L. Riley Carolina Environmental Study Group 854 Henley Place Charlotte, North Carolina 28207
CNS The diesel, generator, governor, exciter, regulator, control panels, and auxiliaries were used to " type qualify" the Catawba diesels for the following tests:
i No Load Endurance Test (7-Day) 300 Start Test The Catawba diesels, generators, governors, exciters, regulators, control panels and auxiliaries wera used for the following:
Factory Testing Seismic Testing / Analysis-8.3.1.1.3.10 Preoperational and Periodic Testing 3
In addition to the factory tests described in Section 8.3.1.1.3.9, the following preoperational on-site acceptance tests and periodic tests will be cond'Jcted on each diesel generator and their associated auxiliary systems.
A.
Preoperational Testing:
~ -.
Tests as described in:
1.
IEEE 387-1977, Sections 6.4 and 6.5.
t 2.-
Catawba Technical Specifications, Sections 4.8.1.1.2.a.3;$ bus (,
and4.8.1.1.232thru1f.
1 3.
Regulatory Guide 1.9,'Rev. O, Section C.3 and C.4.
4.
Regulatory Guide 1.41, Rev. O, Section C. _s.
s, x
9 3
f
)
(
8.3-16a Rev. V 3 I
CG..y Ovci -
0
~"
1
' CATAWBA UNTT 2 INSPIETION MATRTX
~
Sample Size (percent)
Part Nam Part No.
Clann Visnal Dimn.
S.NDE V. FDE Ena. Eval.
Notes l
Inbe Oil Pressure Regulating Valve 00-420 A
X 9
Jacket Water Standpipe,Fttngs, Gasket 00-700A B
100 8
Jacket Water Standpipe Valves 00-700B B
X 9
Jacket Water Standpipe Supports 00-700C B
100 8
Jacket Water Standpipe Switches 00-700E B
X 9
Jacket Water Standpipe Bolting Materials 00-700F B
100 8
Main Bearing Base Assenbly 02-305A A
100 10 Main Bearing Studs and Nuts 02-305C A
100
~ ~.
Main Bearing Caps 02-305D A
100 Imbe Oil Internal.Beaders 02-307A A
100 Imbe Oil Tubing and Fittings-Internal 02-307B A
100 Imbe Oil Line SuIports-Internal 02-307D B
100 Crankshaft 02-310A A
100 38 3
Main Bearing Shells 053103 A
100 100 Crankshaft Thrust Bearing Ring 02-210C A
100 Crankcase Assenbly 311A A
100 F un Bearing Caps and Dowels 02-311B B
X 9
Crankcase Mounting Hardware 02-311D B
X 9
-Piston Rings 02-314B A
100 Cylinder Block 02-315A A
25 25 4
Cylinder Liner 02-315C A
100 100 Cylinder Block Jacket Water Manifold 02-315D B
100 Cylinder Bead Studs 02-315E B
2a Cylinder Head Nuts 02-315F B
100 Jacket Water Inlet Manifold Assenbly 02-316A B
100 8
Jacket Water Inlet Manifold Coupling 02-316B B
100 8
Jacket Water Discharge Manifold 02-317A B
100 Jacket Water Disch. Manifold Coupling 02-317B B
100 8
Jacket Water Disch. Manifold Supports 02-317C B
100 8
Flywheel Bolting 02-330B A
100 Front Gear Case Bolting 02-335B C
100 Connecting Rods and Bushings 02-340A A
100 100 100 Connecting Rod Bearing Shells 02-340B A
100 100 100 100 Pistons 02-341A A
4100 100
Catawba Unit 2 Inspection Matrix Page 2
~
Part Nam Part No.
Class Visual Diwn.
Notes
~
4 Piston Pin Assenbly 02-341C A
100 Intake Tappets 02-345A A
100 Fuel Tappets 02-345B A
100 Canshaft Assenbly 02-350A A
100 i -
Canshaft Bearing 02-350B B
100 5
Camshaft Supports, Bolting and Gear 02-350C A
100
( % chaft Gear 02-355A A
100 Idler Gear Assenbly 02-355B A
100 Air Start Valve 02-359 A
100 100 Cylinder Bead 02-360A B
100 100 100 100 2
Intake and Exhaust Valves 02-360B B
100 100 Valve Springs 02-360D B
100 1
Subcover Assenbly 02-362A B
100 100 Fuel Injection Punp 02-365A B
100 Fuel Injection Tubing 02-365C B
100 100 6
Fuel Injection Tubing Supports 02-365D B
100 8
Fuel Punp Linkage and Control Shaft 02-371A A
100 Fuel Punp Linkage, Bearings and Shaft 02-371B A
100 Exhaust Manifolds 02-380A B
100 Prhanat Manifold Bolting 02-380B B
100 9
Crankcase Covers Gaskets and Bolting 02-386B C
100 Intake and Intermediate Rocker Arm Assem 02-390A B
100 Exhaust Rocker Arm Assenbly 02-390B B
100 Intake and Exhaust Pushrods 02-390C B
100 100 Connector Pushrods 02-390D B
100 100 Rocker Arm Bushings 02-390E B
100 Rocker Arm Bolting 02-390G B
100 100 Overspeed Trip and Accessory Drive 02-410B A
100 Overspeed S' rip Couplings 02-410C A
100 Speed Regulating Governor 02-411A A
100 Governor Drive Couplings 02-411B A
100 Governor Linkage 02-413A A
100 Fuel Puup Linkage-Auto Shutdown Cylinder 02-413B B
100 Governor Booster Servonotor 02-415B B
100 Governor Beat Exchanger Assenbly 02-415C A
100 Intercooler Piping-Coupling, Bolt,Gskts 02-436B A
100 Turbo Cooling Water Pipe and Fittings 02-437A B
- 100 8
'Ibtbo Cooling Water Supports 02-437B A
100 8
Catawba Unit 2 Inspection Matrix Page 4 Part Name Part No.
Class Visual Dimen.
S.10E V.NDE Ena Eval.
Notes Generator Shaft and Bearings CN-119A A
X 9
Jacket Water Heat Exchanger CN-120 B
X 9
Oil Prelube Filter CN-122 A
X 9
Imbe Oil Keepwarn Strainer CN-131 A
X
- 9 Thermostatic Valve CN-136/40 B
100 Intercooler F-068 A
100 100 Turbocharger MP-022/3 A
100 100 100 10 Inbe Oil Full Pressure Strainer SE-025 A
X 9
Noten to Table 1.
Intake and exhaust valve springs have proper color code.
2.
Ultrasonic wall thickness measurement of fire deck and fuel nozzle area. Inspection to determine if the head has been repaired.
3.
Crankshaft web deflections and thrust clearances to be measured with the diesel hot and cold. A torsiograph will be done on the crankshaft.
4.
A sanple will be removed from the block for material verification.
5.
Canshaft bearings will be inspected only if the cam lobes show abnormal wear.
6.
BCT inspections will be done of both ends of high pressure injection lines.
7.
Turbocharger bracket bolting will be replaced if necessary.
8.
Walkdown inspection to verify as-built condition.
9.
Engineering validation of part to determine if there are any significant unresolved maintenanoe or operational problems associated with the part.
- 10. Teardown and inspection of new or rebuilt turbochargers which have accunulated less than 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> of operation will not be performed.
Catawba Unit 2 Inspection Matrix Page 3 Part Name Part No.
Class Visual Dimn.
S.mE V.mE Enc. Eval.
Notes Start Air Manifold Pipe, Tubing & Fttngs 02-441A A
100 8
Start Air Manifold Pipe Supports 02-441C A
100 8
Start Air Distributor 'Ibg,Fttngs,Gskts 02-442B A
100 8
Fuel Oil Piping and Tubing 02-450B A
100
'8 Fuel Oil Piping Supports 02-450D A
100 8
Fuel Oil Filter Mounting Hardware 02-455C A
100 External Inbe Oil Lines 02-465A A
100 8
External Lube Oil Line Supports 02-465B A
100 External Lube Oil Valves 02-465C A
X 9
Turbocharger Inbe Oil Piping 02-467A B
100 Turbocharger Lube Oil Piping Supports 02-467B B
100 Turbocharger Bracket 02-475A B
100 Turbocharger Bracket Bolting 02-475D B
8 7
Control Panel Cabinet 02-500A A
X 9
Control Air Accunulator 02-500F A
X 9
Control Air System Valves 02-500G A
X 9
Control Air System Pressure Switches 02-500H B
X 9
Control System Relays 02-500J A
X 9
Control System Solenoid Valves 02 500K A
X 9
Control Air System Piping, Tubing, Fttng 02-500M B
100 8
Control Panel Wiring 02-500N A
X 9
Inbe Oil Sunp Tank 02-540A B
100 Inbe Oil Sunp Tank Bolting 02-540B B
100 Inbe Oil Sunp Tank Mounting Hardware 02-540C B
100 Instrumentation Thermocouples 02-630D B
X 9
Engine & Auxiliary Module Wiring Conduit 02-688A A
100 Engine & Auxiliary Module Wiring 02-688B A
X 9
Qqine & Auxiliary Module Wiring Boxes 02-688C A
X 9
% ine Alarm Sensors02-690 A
J X
9 Orf Engine Saftey Alarm Sensors-Switches 02-691A B
X 9
Engine Shutdcwn Tubing and Fittings 02-695A B
100 8
Engine Shutdown Valves, Regs, & Orifice 02-695B A
X 9
Engine Shutdown Trip Switches 02-695C A
X 9
Funl Oil Duplex Strainer 02-825D A
X 9
Turbocharger Thrust Bearing Inbe Systen 02-CPR C
100 Intake Air Filter CN-106 B
X 9
Intake Air Silencer CN-107 B
X 9
Before and After Iube Oil Punp CN-109 A
X 9
Full Flow Lube Oil Filter CN-110 A
X 9
Inbe Oil Heat Exchanger CN-lll B
X 9